TSweikee
post Oct 13 2011, 11:16 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
Yup is "door architrave"
coconutzz
post Oct 17 2011, 03:59 PM

Regular
******
Senior Member
1,109 posts

Joined: Mar 2007
bro for your rooms marbles...may i ask how mcuh does it cost?
TSweikee
post Oct 17 2011, 04:47 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
QUOTE(coconutzz @ Oct 17 2011, 03:59 PM)
bro for your rooms marbles...may i ask how mcuh does it cost?
*
Living room broken marble?
coconutzz
post Oct 17 2011, 07:27 PM

Regular
******
Senior Member
1,109 posts

Joined: Mar 2007
QUOTE(weikee @ Oct 13 2011, 12:59 AM)
Finally, all 4 normal door installed, and 1 double leaf door 95% installed. This uncle take 2 days complete. Most time consuming is my double leaf door, is not fully installed, The Samsung bracket need to be modify, I'll do it later and install, not major.

Polished floor.
user posted image

user posted image

user posted image
Double leaf door with Samsung SHS-5120 digital lock + Jimmy lock. Took uncle 2 hours to get the hole for the Mortise, and I do the installation. Warning, if you plan to use SHS-5120 or similar lock, is best to have door thickness 40mm. Mine is 38mm, making the installation tricky and bracket need to mod.

Inside
user posted image

Outside
user posted image

Next is install the door frame skirting and paint.
*
The above broken marble floors smile.gif

How much does it cost? Thx
TSweikee
post Oct 17 2011, 07:51 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
70% original from the house. The extension at the main door is new broken marble.

I brought 1-Ton broken marble about RM 280, can install about 130 to 150 sqft area. Some color are more expensive ranging from 250 to 400 per ton.

Installation and polish of the extension is RM 700, and polish the old marble is RM 300. So total is RM 1k for installation of 100+ sqft area and polish ground floor.
orientaliew
post Oct 17 2011, 09:02 PM

Casual
***
Junior Member
331 posts

Joined: May 2009
QUOTE(weikee @ Oct 17 2011, 07:51 PM)
70% original from the house. The extension at the main door is new broken marble.

I brought 1-Ton broken marble about RM 280, can install about 130 to 150 sqft area. Some color are more expensive ranging from 250 to 400 per ton.

Installation and polish of the extension is RM 700, and polish the old marble is RM 300.  So total is RM 1k for installation of 100+ sqft area and polish ground floor.
*
so it works out to about RM10 per sqft? cheaper than i thought.
where did u buy the marble? and the contact of the marble installer pls. smile.gif
coconutzz
post Oct 17 2011, 11:25 PM

Regular
******
Senior Member
1,109 posts

Joined: Mar 2007
Yea...mind sharing or pm me the contacts for the marble pls?

Thanks a lot
TSweikee
post Oct 18 2011, 12:12 AM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
Don't have the contact already because so near my in law house. Is at Salak south. You can google using this coordinate (3.082149,101.69644). Is near the Salak South Hong Leong bank, just outside the bank there is this up hill road, follow the road up before the flats, you see some wooden shop house, and "mud guard" shop. The marble shop is behind the "mud guard" aka car paint shop".

I go they buy the broken marbles, the old lady is bit fierce but so far been there few time is not too bad. And in the office usually this uncle Chin, can arrange help to do the installation, if he not around you ask the old lady to give you his number.

If you plan to extend the old marble with new marble, please take some phones of your old marble, the old lady won't help you choose, you need to decide the matching yourself. Bring some water it help to give you see the marble when is wet. If not marble will be whitish before polish.

Transportation of broken marble is additional charges. They sell marble skirting, pebble wash, and some nice stone.

This post has been edited by weikee: Oct 18 2011, 12:13 AM
arcadian
post Oct 18 2011, 07:54 AM

New Member
*
Junior Member
24 posts

Joined: Dec 2008


Hi ,

Can you PM me the contact number for your contractor who did the marbe polishing?

Thanks.
TSweikee
post Oct 18 2011, 08:23 AM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
QUOTE(arcadian @ Oct 18 2011, 07:54 AM)
Hi ,

Can you PM me the contact number for your contractor who did the marbe polishing?

Thanks.
*
See my reply before your post.
arcadian
post Oct 18 2011, 08:20 PM

New Member
*
Junior Member
24 posts

Joined: Dec 2008


OIC, I thought that Uncle only provide installation.

Tq
TSweikee
post Oct 27 2011, 05:36 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
Finally paint all the 5 doors.

See the difference before and after paint for my main door.

Before paint
user posted image

After Paint
user posted image

Another angle
user posted image


My Working/study room in ground floor. With door architrave
user posted image

My first floor door architrave
user posted image


First floor door
user posted image



kamion
post Oct 27 2011, 05:44 PM

Casual
***
Junior Member
327 posts

Joined: Feb 2011
Your contractor so nice, put the plastic sheet to protect your flooring.

Great looking doors! smile.gif



This post has been edited by kamion: Oct 27 2011, 05:44 PM
TSweikee
post Oct 27 2011, 06:34 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
QUOTE(kamion @ Oct 27 2011, 05:44 PM)
Your contractor so nice, put the plastic sheet to protect your flooring.

Great looking doors! smile.gif
*
Told him to do so. And I buy some extra also. So they can cover more area.
SYL17
post Oct 28 2011, 01:29 AM

Getting Started
**
Junior Member
295 posts

Joined: Aug 2011
From: Johor Bahru


bro weikee.. more photos pls hahaha..
ganesht
post Oct 28 2011, 08:10 AM

New Member
*
Junior Member
7 posts

Joined: Apr 2011
nice doors,nice colour.. smile.gif
Pegasus88
post Oct 28 2011, 08:59 PM

Enthusiast
*****
Senior Member
725 posts

Joined: Mar 2011
From: MIRI


QUOTE(weikee @ Oct 27 2011, 05:36 PM)
Finally paint all the 5 doors.

See the difference before and after paint for my main door.

Before paint
user posted image

After Paint
user posted image

Another angle
user posted image
My Working/study room in ground floor. With door architrave
user posted image

My first floor door architrave
user posted image
First floor door
user posted image
*
wow i love the last first floor door pic ! the wooden door look so solid with nice natural colour..and mind i ask what is the colour of your wall in the last picture ? i like this colour but dont know how to tell my designer doh.gif sweat.gif
TSweikee
post Oct 28 2011, 09:14 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
QUOTE(Pegasus88 @ Oct 28 2011, 08:59 PM)
wow i love the last first floor door pic ! the wooden door look so solid with nice natural colour..and mind i ask what is the colour of your wall in the last picture ? i like this colour but dont know how to tell my designer  doh.gif  sweat.gif
*
I don't know what color he use. Ask him to match with my flooring.

You give your designer my door picture ask him find out. You need to make sure the hardwood door have good wood grain. Mine so so only. Cause i get ready made wooden door.

If get the engineered wooded door got much nicer design too.
Pegasus88
post Oct 28 2011, 10:01 PM

Enthusiast
*****
Senior Member
725 posts

Joined: Mar 2011
From: MIRI


owh, mine all solid wood...merbau, brilliant(dont know how to spell) and nyatoh...
TSweikee
post Oct 28 2011, 10:10 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
QUOTE(Pegasus88 @ Oct 28 2011, 10:01 PM)
owh, mine all solid wood...merbau, brilliant(dont know how to spell) and nyatoh...
*
That is good. Did the designer give you grade 1? Grade 1 wood grain and color are more even.

BTW, painting the door is not cheap oh. Mine inclusive of painting the door frame is RM 240.00 per door, and my main door extra RM 150 cause very tedious too many line. Furthermore all this sifu need advance booking. So hard to ask them come. Took him 3 days for 5 doors.