 My Renovation in PJ, Wet kitchen and living hall extension...

views
     
TSkingkong1
post Aug 15 2011, 09:58 PM

On my way
****
Senior Member
636 posts

Joined: Jun 2005
QUOTE(kelvyn @ Aug 15 2011, 09:08 PM)
Who is your contractor that is doing the roof? Ask him to do that. Very simple. Any Indon carpenter can fabricate that. Just make a sample that is correct in dimensions. Then use this as the template and mass produce the rest.
There is no rocket science in fabricating these roof truss  tongue.gif

Better to use Hardwood since it is exposed to the Malaysian weather. You don't want to having to replace the rotten timber after few years.

BTW, if you are using the normal concrete roof tiles, suggest that you get the bottom of the roof tiles pre-painted first before installation. Will look nicer when viewed from below.  biggrin.gif
*
Thanks for your advice, kelvyn. Looks like my contractor is the first time doing this type of roof. My wood leg, at the bottom got bit of design. He tried to source around for quite some time, at the end he said need to sent for carpenter to craft the design, each piece cost about RM20.
kelvyn
post Aug 15 2011, 10:11 PM

Look at all my stars!!
*******
Senior Member
3,173 posts

Joined: May 2007
Wow. If this is the first time your contractor install these kind of roof truss, you better check the truss alignment before he install the batten and roof tiles. Else, if you later find out that the truss is not in alignment or the edge of the truss is wavy, it will be difficult to rectify. An experience contractor will use the diagonal member to adjust as sometimes the plastered surface is not in alignment throughout.

TSkingkong1
post Aug 23 2011, 11:40 AM

On my way
****
Senior Member
636 posts

Joined: Jun 2005
Sad to say that my irresponsible contractor shown his true colour.

After delaying me for months to do bigger project, now unwillingly to continue my house and giving excuse that i delayed his 15%.

All this while I paid him without hesitation up to 80%. He just called and I would paid him in the following day without any delay.
kelvyn
post Aug 23 2011, 11:50 AM

Look at all my stars!!
*******
Senior Member
3,173 posts

Joined: May 2007
Sorry to hear that. Quite true with quite a number of the renovation contractors. mad.gif
TSkingkong1
post Aug 23 2011, 12:00 PM

On my way
****
Senior Member
636 posts

Joined: Jun 2005
For those who got his contact from me, you can forget about him before regret.

His indonesian workers' workmanship is horrible, especially on the wall patching to patch up due to wiring drilling.

His chinese tiling guys (quite young) workmanship is also unacceptable, all the toilets having the water flowing out issue. And he blame the tiles too rough, not level, or bending. Though rectified for 1 toilet which he agreed is levelling issue, the same problem still exist.

Really regret to have such contractor. All this while what he said about his honesty, trustworthy, responsibility are just sweet/marketing talk.

I am thinking whether should I use the balance of 20% to appoint someone to "chap sao mei".
Serofax
post Aug 23 2011, 12:03 PM

Casual
***
Junior Member
318 posts

Joined: May 2007
was this person recommended to you by someone? fren or relative?
TSkingkong1
post Aug 23 2011, 12:07 PM

On my way
****
Senior Member
636 posts

Joined: Jun 2005
Recommended by friend. You can refer to the 1st page.
tiensong
post Aug 23 2011, 12:12 PM

Look at all my stars!!
*******
Senior Member
2,237 posts

Joined: Jul 2011
QUOTE(kingkong1 @ Aug 23 2011, 11:40 AM)
Sad to say that my irresponsible contractor shown his true colour. 

After delaying me for months to do bigger project, now unwillingly to continue my house and giving excuse that i delayed his 15%.

All this while I paid him without hesitation up to 80%.  He just called and I would paid him in the following day without any delay.
*
I faced a lot of contractors turned their faces after collected around 80% of payment (or already confirmed profit made or confirmed risk clear) and don't want to serve owner (or see owner's face or listen to owner's request)..

i feel sorry to hear that...


weikee
post Aug 23 2011, 01:24 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
What is the left over task need to complete?
junfu1988
post Aug 23 2011, 05:02 PM

Casual
***
Junior Member
371 posts

Joined: Dec 2007
mind to tell me the total paid for this renovation ?
foxpro
post Aug 23 2011, 05:28 PM

Getting Started
**
Junior Member
278 posts

Joined: Jan 2003
From: out side earth


when the work is delay they workmanship is high then they will run away from project. better in the future dont trust any one ask deposit 80%.

Pay 10 or 20 % after he start work day 1 or day 2 only do not bother hear any kind story from them no money workers ask money, ask him get from his own pocket if the cotractor said no money do not take him this kind person is very high risk.

Only pay them after work completed
TSkingkong1
post Aug 23 2011, 05:43 PM

On my way
****
Senior Member
636 posts

Joined: Jun 2005
QUOTE(weikee @ Aug 23 2011, 01:24 PM)
What is the left over task need to complete?
*
Not much actually, but with a lot of "sao mei" here and there. Think can be completed in 3 days, but just the focus is not here anymore. Promise to come but keep postponing which delay my other suppliers such as customised furniture, glass door, autogate, transport lorry etc.

The car porch roofing was half-done more than a month ago, and until now still no progress.

The last time he come is just to bring his painter for 2 hours and just to paint one wall and left, left with other places not painted. The good thing is all the paint job is done without minor touchup or cleaning of dust/sand.

All the wall with wiring drilled suppose to have final smooth touch up before paint, but not done, with the intention to cover using paint. It end up uneven, rough line every where.

Parquet gluing was bad...just walk one round, can hear "crack...crack" sound here and there. and he said that was the old parquet which only become loose now after you walk, not covered.

Air well covered with polycarbonate, suppose to have "zink sheet" at the edge to prevent water leaking issue, not done. Only cover with "silicone", and now already can see rain water coming in.

Looks like I can't move during this school holiday.

This post has been edited by kingkong1: Aug 23 2011, 05:56 PM
TSkingkong1
post Aug 23 2011, 05:44 PM

On my way
****
Senior Member
636 posts

Joined: Jun 2005
QUOTE(junfu1988 @ Aug 23 2011, 05:02 PM)
mind to tell me the total paid for this renovation ?
*
60k x 80% = 48k
TSkingkong1
post Aug 23 2011, 05:46 PM

On my way
****
Senior Member
636 posts

Joined: Jun 2005
QUOTE(foxpro @ Aug 23 2011, 05:28 PM)
when the work is delay they workmanship is high then they will run away from project. better in the future dont trust any one ask deposit 80%.

Pay 10 or 20 % after he start work day 1 or day 2 only do not bother hear any kind story from them no money workers ask money,  ask him get from his own pocket if the cotractor said no money do not take him this kind person is very high risk.

Only pay them after work completed
*
Not deposit 80%, it was 20% + 20% + 20% + 20%
kelvyn
post Aug 23 2011, 05:48 PM

Look at all my stars!!
*******
Senior Member
3,173 posts

Joined: May 2007
This is the problem with the contractors. When they start on a job, the will put in more workers and effort to show the house owners. So that they can make progressive claims. Owners will also be more happy to make the payments when they see that work is being done.
Towards the tail end of the job, the payment will be lesser, thus no incentive to finish the job. They will drag their feet.


TSkingkong1
post Aug 23 2011, 08:18 PM

On my way
****
Senior Member
636 posts

Joined: Jun 2005
This is the one which is WIP for months.
user posted image
ssshk
post Aug 24 2011, 11:49 AM

Getting Started
**
Junior Member
75 posts

Joined: Sep 2008
no more pictures?
weikee
post Aug 24 2011, 12:06 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
QUOTE(kingkong1 @ Aug 23 2011, 08:18 PM)
This is the one which is WIP for months.
user posted image
*
Hope you get it solve.

lizziewong
post Aug 25 2011, 11:56 PM

Getting Started
**
Junior Member
185 posts

Joined: Jun 2010
QUOTE(kingkong1 @ Aug 8 2011, 10:49 PM)
Anyone knows where to get this wood brackets?  My contractor seems to have problem to source this.

user posted image
*
The wood used look abit thin in this picture....

The wood shld be Balau, and u need to buy good strong bolts to secure the wood. My house roof design is like this..
ssshk
post Aug 26 2011, 08:41 AM

Getting Started
**
Junior Member
75 posts

Joined: Sep 2008
sigh, hate these not responsible contractors.. they should not treat ppl like that.. what is ur plan now?