Welcome Guest ( Log In | Register )

14 Pages < 1 2 3 4 5 > » Bottom

Outline · [ Standard ] · Linear+

 Bandar Putera 2 , Klang, worth buying?

views
     
ericlaiys
post Jun 29 2013, 12:45 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(zery @ Jun 24 2013, 07:55 AM)
I bought one last Saturday.. corner lot RM328k (bumi) non bumi RM341k
*
Any idea on intermediate lot cost & do they have show unit ready?

This post has been edited by ericlaiys: Jun 29 2013, 12:45 AM
ericlaiys
post Jul 4 2013, 03:57 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(senapang @ Jul 3 2013, 02:04 PM)
just called ioi, cadia VP should be in this month or next month. But not sure on the MOT. anybody know when? need to check with snp laywer maybe kan?

For VP, purchaser need to pay for maintenance fee amounting RM450, cukai pintu and taksiran (if i'm not mistaken). so total around RM550++ la u need to prepare.
*
Thank for the info. by the way, MOT= Master of Title, need to check with lawyer. That will cost 5K+ based on my finding last time when sign S & P.

This post has been edited by ericlaiys: Jul 4 2013, 05:24 PM
ericlaiys
post Jul 4 2013, 05:26 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(azmirsafuan @ Jul 2 2013, 09:16 AM)
for kitchen cabinet..what is the dimension? need to find quotation for my dura..
any recommendation for the contractor?
TFR seems to expensive..7.8K..
*
Did you manage to get the dimension? Besides, your layout could be different(depend your kitchen on left side /right side) and you may different depend on where you want to put fridge and washing machine

This post has been edited by ericlaiys: Jul 4 2013, 05:27 PM
ericlaiys
post Jul 6 2013, 07:45 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(azmirsafuan @ Jul 6 2013, 02:39 PM)
xbrkesempatan lg melawat umah..this week blk kampung..insha allah will measured after this.
i think my kitchen is on the left side..got door at the left if you entered from the main door.
did u managed to get the dimension too bro?
*
my kitchen is on the right side. My dimension is around 2.23m X 2.56m (windows glass side)

This post has been edited by ericlaiys: Jul 6 2013, 07:46 PM
ericlaiys
post Jul 13 2013, 09:26 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Today, i just visited Felicia show unit while checking my unit. This phase came with 3 room + 2 bathroom. Show unit open till 7pm.
Meanwhile EMBER phase construction seem very fast.

This post has been edited by ericlaiys: Jul 13 2013, 09:28 PM
ericlaiys
post Jul 15 2013, 02:33 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(zsajiu @ Jul 15 2013, 11:21 AM)
Hi there. I'm just a newbie here.

Anyway, yesterday I also have a look at the show unit for Felicia.

It was a end lot right? 20x65. With around 4-5 feet extra right?

Anyhow.. upon checking the house, the house was actually around 15-16feet wide and around 35-37 feet long. That's mean yes, the land is 20x65 but the built up house just around 16x37 feet only. (I calculated based on the tiles as the tiles is around 1 feet).

What do you guys think?
*
rclxms.gif You really calculated. Got 2 show unit (1 is corner and another one is just next to it(intermediate unit). Well, i just busy body and go checked up since new unit. I'm not sure what is the built up area. Like Dura is 20 X 70 but built up area is 20' X 50'. 20' go to car porch. Too bad the web site did not put Ember and Felicia Floor plan.
ericlaiys
post Jul 25 2013, 02:12 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(azmirsafuan @ Jul 24 2013, 08:04 AM)
cadia bila dpt kunci?
*
Yalor...i'm also waiting. Once Cadia get key, please let us know asap so it's dura turn. icon_idea.gif

This post has been edited by ericlaiys: Jul 25 2013, 02:12 PM
ericlaiys
post Jul 30 2013, 10:43 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


any owner Phase 1 and phase 2? Need to check if got unifi or maxis fibre channel connectivity at bandar putera 2 klang? I just check coverage by using searching "Jalan Johan Setia". Found got coverage mentioned by both site.

From searching "Jalan Kebun Nenas" got coverage till KEBUN NENAS 4G/K8. Hopefully got.

This post has been edited by ericlaiys: Jul 30 2013, 10:51 PM
ericlaiys
post Aug 5 2013, 07:02 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Dura update- They have put house number plate and lock the gate. So cannot visit except view from outside.
ericlaiys
post Aug 5 2013, 07:05 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(langsk @ Aug 5 2013, 06:05 PM)
Cadia owner here... I'm also waiting for key.... late 3 month my wife call the developer.. they say will be on aug...
*
Most likely will be sept as Hari Raya is around the corner. anyway, keep us update when they call you to get the key. Next will be dura. smile.gif
ericlaiys
post Aug 13 2013, 12:44 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Aug 13 2013, 12:15 PM)
hai guys...i'm cadia owner... CD006 (facing basketball court) ... can't wait to get the keys.... rclxm9.gif  rclxm9.gif  rclxm9.gif  rclxm9.gif
*
Hi cadia owner,
Did you check that your electric and water meter has in?
ericlaiys
post Aug 13 2013, 02:45 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Aug 13 2013, 02:38 PM)
emmmmmm....last few days before raya i go there...not yet install... sad.gif  sad.gif  sad.gif
*
one stupid question. If not yet install, how to get CF? Is this normal as i saw no meter for Dura as well. i thought it is normal as they focused at Cadia right now.
In order to get CF, does the house need to has electric and water meter?
ericlaiys
post Aug 15 2013, 12:41 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(senapang @ Aug 15 2013, 12:25 PM)
just called ioi..expected the vp date will be on end of this month..

they will issue the letter, and after bank release the money to them, then only we can set for appointment with the person incharge..

it is ok for me coz my snp is 11 september..just checked last night.. i tot august..hahaha.. still they ahead the schedule la..
*
Good to hear that. Remember to post when they call and inspection time.
ericlaiys
post Aug 22 2013, 06:17 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Something to share. Crimes happened at our area (with grill):- http://www.youtube.com/watch?v=3tz8QGGXbkc&feature=youtu.be
ericlaiys
post Aug 28 2013, 07:25 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(langsk @ Aug 28 2013, 12:34 AM)
Yes Yes Yes..... I got the letter from IOI to collect the key....
*
Cool. Do report any defect on your finding and share your procedure/experience
ericlaiys
post Aug 28 2013, 08:37 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Aug 28 2013, 08:21 PM)
General & infra maintenance fee = rm720
Quit rent = rm16.16
2nd half assesment = rm 37.52

Total = rm733.68

What are this payments for?

It is normal to pay before collect the key?
*
Yes. You need to pay. It is mentioned in the S & P. Wait till laywer call you to pay Master title ( i think is 5K)

This post has been edited by ericlaiys: Aug 28 2013, 08:41 PM
ericlaiys
post Aug 29 2013, 09:03 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


oh my god!!!!! i also received letter (dura). Ask to pay 771.86 and then collect key. How come i no need to wait for bank to release money? But got mentioned, need 50+K. So what is the correct process

1. Pay RM700+
2. Wait for bank to release 50K
3. Call to make an appointment

And they say i must do within 14 days...... (unexpected thing happen). Why 14 days? I thought i will get the key by Nov. Anyone Dura owner who also having the same fate as mine?

This post has been edited by ericlaiys: Aug 30 2013, 07:09 AM
ericlaiys
post Aug 30 2013, 10:53 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Alright just make a call.
Here is the info that i got:
1. Pay RM700+ (Settled before key collection)
2. Wait for bank to release 50K
3. Once release, call to make an appointment - must call to Putrajaya office (Not Bandar Puteri) - 03-89478636

Going to make payment this week. According to Sales Office Bandar Puteri, they are open tomorrow and also Sunday.

Then not restricted to 14 days as long you do so within a month to collect the key. If you dont collect , Putrajaya officer will call you and ask you to collect.

Wow....now so excited already as i know Maybank will make payment very fast. (hopefully)

This post has been edited by ericlaiys: Aug 30 2013, 10:59 AM
ericlaiys
post Aug 30 2013, 10:04 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Aug 28 2013, 08:21 PM)
General & infra maintenance fee = rm720
Quit rent = rm16.16
2nd half assesment = rm 37.52

Total = rm733.68

What are this payments for?

It is normal to pay before collect the key?
*
Total not correct. It is not 733. You sure posted correct amount?

This post has been edited by ericlaiys: Aug 30 2013, 10:12 PM
ericlaiys
post Aug 31 2013, 08:03 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(senapang @ Aug 31 2013, 12:26 AM)
Does it really must collect the key within 1 month? Is the maintenance fee is same for all unit ke or follow lot size? Mine also received already, need to go back parent house to collect n see..donno what is the figure to pay..cannot pay time collect key tu ke?
*
Your case similar like mine. I find out from my parent as i put my mailing address there.
So this is was the feedback that i have gathered when called them

a) within 14 days - should collect key. After 14 days then it is confirmed that developer has deliver the house and we cannot ask they to pay LAD for late deliver the house
b) within 1 month - developer want to collect all $$ and make profit . smile.gif Let say if you cannot make it, then u can assign another person (together with developer + your authorize letter). Called Putrajaya to let them know.
If i'm not mistaken, Bank will hold last 5% till you check for defect. So you must check or you just take the key and sign. smile.gif
d) Fees not sure if all the same. Based on the letter that i read yesterday (purposely went back hometown to get the letter)
My unit (Dura) breakdown (intermediate)
- General & infra maintenance - RM720
-Quit rent (9 Sept 2013 - 31- Dec 2013) - RM15.62
-2nd Half Assessment (9 Sept 2013-31 Dec 2013) - RM36.24

Total = 771.86

Payment by cash or bank draft. If credit card, there will be an extra charges. You can also pay during collect key.

This post has been edited by ericlaiys: Aug 31 2013, 08:05 AM

14 Pages < 1 2 3 4 5 > » Top
 

Change to:
| Lo-Fi Version
0.0367sec    0.54    7 queries    GZIP Disabled
Time is now: 22nd December 2025 - 08:47 PM