anyone plan to put air cond for Room 2(next to master bedroom)? By the way, developer only do 4 point fan. Anyone has any idea which area don't have fan?
Bandar Putera 2 , Klang, worth buying?
Bandar Putera 2 , Klang, worth buying?
|
|
Sep 9 2013, 02:33 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
7,598 posts Joined: May 2012 |
anyone plan to put air cond for Room 2(next to master bedroom)? By the way, developer only do 4 point fan. Anyone has any idea which area don't have fan?
|
|
|
|
|
|
Sep 10 2013, 01:30 PM
|
![]() ![]()
Junior Member
56 posts Joined: May 2013 |
I got my key now.checking the defect.
|
|
|
Sep 10 2013, 02:05 PM
|
![]() ![]()
Junior Member
56 posts Joined: May 2013 |
Meter electrik n air x masuk lagi.o far minor defect.
This post has been edited by mimieukk: Sep 10 2013, 02:14 PM |
|
|
Sep 10 2013, 02:39 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
7,598 posts Joined: May 2012 |
QUOTE(mimieukk @ Sep 10 2013, 02:05 PM) few question:-a)they got mention when come in? b)How long did you take to check? c)your one is cadia/dura? d) Is the sink there? e)If just minor defect, then should be very fast they fix the problem and can start renovation. This post has been edited by ericlaiys: Sep 10 2013, 02:41 PM |
|
|
Sep 10 2013, 02:56 PM
|
![]() ![]()
Junior Member
76 posts Joined: Aug 2013 |
i call alliance bank just now...they told me they will release the final payment on 18 September....becoz thats the due date given by IOI..
aiyooooooo |
|
|
Sep 10 2013, 02:57 PM
|
![]() ![]()
Junior Member
56 posts Joined: May 2013 |
QUOTE(ericlaiys @ Sep 10 2013, 02:39 PM) few question:- Nope.they said dah ada but i saw tnb van outsidea)they got mention when come in? b)How long did you take to check? c)your one is cadia/dura? d) Is the sink there? e)If just minor defect, then should be very fast they fix the problem and can start renovation. For checking with oifficer about 1 and half hour i think.then i proceed the checking n fill in the defect form and sed back to ioi bandar puteri. Cadia Yes sink is there.only xda paip. Dalam seminggu mungkin. I sambung blakang get about 8k. Sambung blakNG TABLE TOP Change toilet duduk to toilet cangkung Tambah 1 bilik air Deal dgn nyanmar keje buat rumah situ |
|
|
|
|
|
Sep 10 2013, 03:00 PM
|
![]() ![]()
Junior Member
76 posts Joined: Aug 2013 |
QUOTE(mimieukk @ Sep 10 2013, 02:57 PM) Nope.they said dah ada but i saw tnb van outside kepala paip kene beli sendri ke atau sepatutnya pemaju letak...?For checking with oifficer about 1 and half hour i think.then i proceed the checking n fill in the defect form and sed back to ioi bandar puteri. Cadia Yes sink is there.only xda paip. Dalam seminggu mungkin. I sambung blakang get about 8k. Sambung blakNG TABLE TOP Change toilet duduk to toilet cangkung Tambah 1 bilik air Deal dgn nyanmar keje buat rumah situ |
|
|
Sep 10 2013, 03:03 PM
|
![]() ![]()
Junior Member
56 posts Joined: May 2013 |
diaorg bg.masa nak pindah diaorg install panggil plumber
|
|
|
Sep 10 2013, 03:07 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
7,598 posts Joined: May 2012 |
QUOTE(mimieukk @ Sep 10 2013, 02:57 PM) Nope.they said dah ada but i saw tnb van outside Need to immediate send defect form? Don't give extra time to check. Can come back and submit later.For checking with oifficer about 1 and half hour i think.then i proceed the checking n fill in the defect form and sed back to ioi bandar puteri. Cadia Yes sink is there.only xda paip. Dalam seminggu mungkin. I sambung blakang get about 8k. Sambung blakNG TABLE TOP Change toilet duduk to toilet cangkung Tambah 1 bilik air Deal dgn nyanmar keje buat rumah situ 8K is cheap. Cement & Roof (seal everything)? Got place to put toilet? Wow...3 toilet in a house...hmmm |
|
|
Sep 10 2013, 04:13 PM
|
![]() ![]()
Junior Member
56 posts Joined: May 2013 |
No need.u can send later.since i cuti 1 hari .i settle semua..and gud thing today raining so senang tgk mana bocor.8k except we need beli mozek and sinki if we dont want used the current on n mangkuk cangkung.all he provided
|
|
|
Sep 10 2013, 04:16 PM
|
![]() ![]()
Junior Member
56 posts Joined: May 2013 |
I sambung the yard.so tutup tingkap bilik blakang buat anoher bilik air.
The nyanmar said if dpn tambah mozek pecah untuk masuk 2 keta.dia ambil 3 k except mozek belik sendiri n also gate. |
|
|
Sep 10 2013, 04:20 PM
|
![]() ![]()
Junior Member
56 posts Joined: Jun 2009 |
QUOTE(netcrawler @ Nov 22 2011, 09:40 PM) anything wrong with Indian? Please don't be racist as majority of Indian are good citizens. Only small portion especially those This is not racist just voice out... i agree with them... i knew alot of indians will protect their own race when something bads happened to them.living near Taman Sentosa are notorious for their gangster-ism. Then again. goverment should be blame for not treat them equally. I have indian and singh frens too... many of them don't even like their race... they feel humilate. |
|
|
Sep 10 2013, 04:21 PM
|
![]() ![]()
Junior Member
56 posts Joined: May 2013 |
The 8k include i suruh touchip the cyiling since x leh renovate.ada 2 tahun waranty.
|
|
|
|
|
|
Sep 10 2013, 04:23 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
7,598 posts Joined: May 2012 |
|
|
|
Sep 10 2013, 04:33 PM
|
![]() ![]()
Junior Member
56 posts Joined: May 2013 |
Cyiling i x buat apa2 just the garis2 kayu tu i suruh touch ip sikit.nampak kemas.x nampak bersegi2.
|
|
|
Sep 12 2013, 12:09 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
7,598 posts Joined: May 2012 |
Yeah!....Bank has released $$$ but developer not yet receive the $$$. Anyway, according to them appointment to collect key has full till 23 Sept. So tomorrow need to call again to double check if they receive payment & make appointment.
Wonder why no one post feedback on collect key & check defect. (so far only see 1 response) |
|
|
Sep 12 2013, 01:49 PM
|
![]() ![]()
Junior Member
76 posts Joined: Aug 2013 |
QUOTE(ericlaiys @ Sep 12 2013, 12:09 PM) Yeah!....Bank has released $$$ but developer not yet receive the $$$. Anyway, according to them appointment to collect key has full till 23 Sept. So tomorrow need to call again to double check if they receive payment & make appointment. congratss bro..u make me jealous...hahaha Wonder why no one post feedback on collect key & check defect. (so far only see 1 response) |
|
|
Sep 13 2013, 10:12 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
7,598 posts Joined: May 2012 |
QUOTE(sikhwan3 @ Sep 12 2013, 01:49 PM) haha...no need to jealous. you will get the key soon as well. Well, just checked with developer, they not yet receive $$$ yet. I thought nowaday electronic system should be faster.Additional info:- a) 1 day only can take 5 appointments. b) Each appointment duration is 1 hour and 30 minute. Well, try call them again next week. |
|
|
Sep 13 2013, 10:35 AM
|
![]() ![]()
Junior Member
76 posts Joined: Aug 2013 |
QUOTE(ericlaiys @ Sep 13 2013, 10:12 AM) haha...no need to jealous. you will get the key soon as well. Well, just checked with developer, they not yet receive $$$ yet. I thought nowaday electronic system should be faster. as far as i know...bank will issue cheque to lawyer...this may take few days for developer to get the money.....Additional info:- a) 1 day only can take 5 appointments. b) Each appointment duration is 1 hour and 30 minute. Well, try call them again next week. |
|
|
Sep 15 2013, 05:51 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
7,598 posts Joined: May 2012 |
Sink is already installed
Electricity meter has installed as well. Water meter still not yet. Today i saw one unit of Dura has started renovation. Went to site visit and discuss with my contractor about my renovation design. They have put the banner at my gate. Saw few house is also the same. Most likely they are getting the same contractor. Cadia /dura owner (which has took the key), is your water meter in? This post has been edited by ericlaiys: Sep 16 2013, 10:57 AM |
| Change to: | 0.0202sec
1.78
6 queries
GZIP Disabled
Time is now: 24th December 2025 - 07:06 PM |