Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed
122 Pages « < 103 104 105 106 107 > » Bottom

Outline · [ Standard ] · Linear+

Investment Nadayu 92, Nadayu 92, anyone buying?

views
     
cheon
post Aug 5 2013, 03:05 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(odsyauy @ Aug 5 2013, 02:48 PM)
strongly disagree with tat statement and developer must change it mad.gif
*
Bro, thanks so much for the support rclxms.gif

Are you a Type A owner? Can help us by making a complain to them?

Level 5, Menara Standard Chartered
P.S. 38, No. 30, Jalan Sultan Ismail
50250 Kuala Lumpur.
Telephone : (603) 2141 5775


Look for Kris Manager directly and do not look for Kris.

Thanks~ icon_rolleyes.gif
AMINT
post Aug 5 2013, 03:05 PM

Look at all my stars!!
*******
Senior Member
7,446 posts

Joined: Sep 2008
QUOTE(cheon @ Aug 5 2013, 02:32 PM)
Yes, i've get their guy to get back to me and he's talking noncense.

He replied : "we had raised the matter with our project department and we are being informed that type A units are designed for single phase"

Nadayu GM is out of lunch now and i've asked him to call me back later.

Guys, don't look for Kris if you call to Nadayu 92.

Look for Kris Manager or GM directly as Kris cannot make any decision.

Type A owner, please complaint to Nadayu! We spent so much on our house and they gave us single phase mad.gif  mad.gif
Type A owner, let's voice it up! This is truly unfair for us!
*
Entah ape ape entah. Type A units are designed for single phase? I would say his brain is designed for a monkey!!
AMINT
post Aug 5 2013, 03:06 PM

Look at all my stars!!
*******
Senior Member
7,446 posts

Joined: Sep 2008
QUOTE(cheon @ Aug 5 2013, 03:05 PM)
Bro, thanks so much for the support rclxms.gif

Are you a Type A owner? Can help us by making a complain to them?

Level 5, Menara Standard Chartered
P.S. 38, No. 30, Jalan Sultan Ismail
50250 Kuala Lumpur.
Telephone : (603) 2141 5775
Look for Kris Manager directly and do not look for Kris.

Thanks~ icon_rolleyes.gif
*
Who is Kris' manager? I dont wanna talk to a monkey.
cheon
post Aug 5 2013, 03:07 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(AMINT @ Aug 5 2013, 03:05 PM)
Entah ape ape entah. Type A units are designed for single phase? I would say his brain is designed for a monkey!!
*
Bro, thanks for the support.

Can you filed a complaint to them too?

The way Kris reply to my email is unprofessional in unproper way.

We need to give some pressure to them smile.gif
cheon
post Aug 5 2013, 03:09 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(AMINT @ Aug 5 2013, 03:06 PM)
Who is Kris' manager? I dont wanna talk to a monkey.
*
Haha, i called to the number above and asked them to pass the line to Kris Manager or GM directly.

They are not in now. I still waiting for them to call me back.

This Monkey forward the email to Nizam and Edrus only. Think this monkey small patato only shakehead.gif
odsyauy
post Aug 5 2013, 03:19 PM

Getting Started
**
Junior Member
68 posts

Joined: Jan 2006


QUOTE(cheon @ Aug 5 2013, 03:05 PM)
Bro, thanks so much for the support rclxms.gif

Are you a Type A owner? Can help us by making a complain to them?

Level 5, Menara Standard Chartered
P.S. 38, No. 30, Jalan Sultan Ismail
50250 Kuala Lumpur.
Telephone : (603) 2141 5775
Look for Kris Manager directly and do not look for Kris.

Thanks~ icon_rolleyes.gif
*
nope, mine is Type B, but not yet inspect house cos i bought from owner and now waiting for loan settlement. hope my house no major defect

AMINT
post Aug 5 2013, 03:19 PM

Look at all my stars!!
*******
Senior Member
7,446 posts

Joined: Sep 2008
QUOTE(cheon @ Aug 5 2013, 03:09 PM)
Haha, i called to the number above and asked them to pass the line to Kris Manager or GM directly.

They are not in now. I still waiting for them to call me back.

This Monkey forward the email to Nizam and Edrus only. Think this monkey small patato only shakehead.gif
*
if small potato doesnt know what he is talking about, then just dont talk. he thinks we are all stupid ka? we are not 1st home buyers.
cheon
post Aug 5 2013, 03:21 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(odsyauy @ Aug 5 2013, 03:19 PM)
nope, mine is Type B, but not yet inspect house cos i bought from owner and now waiting for loan settlement. hope my house no major defect
*
Thanks bro..it's truely unfair for us.

My house got more than 400 minor defect. If you free to visit my house i show u~
cheon
post Aug 5 2013, 03:22 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(AMINT @ Aug 5 2013, 03:19 PM)
if small potato doesnt know what he is talking about, then just dont talk. he thinks we are all stupid ka? we are not 1st home buyers.
*
I am very frustated right now, juz now i called them again and the manager still not in.

The clerk there Anna kena me shoot too....shoot until gao gao mad.gif mad.gif mad.gif mad.gif
odsyauy
post Aug 5 2013, 03:23 PM

Getting Started
**
Junior Member
68 posts

Joined: Jan 2006


QUOTE(cheon @ Aug 5 2013, 03:21 PM)
Thanks bro..it's truely unfair for us.

My house got more than 400 minor defect. If you free to visit my house i show u~
*
walao... 400 minor defect then become major defect already...a bit regret to spent so much money for this so much sweat.gif defect house

cheon
post Aug 5 2013, 03:29 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(odsyauy @ Aug 5 2013, 03:23 PM)
walao... 400 minor defect then become major defect already...a bit regret to spent so much money for this so much  sweat.gif defect house
*
All minor defects such as tiles crack,hollow, water leaking, poor painting job....
odsyauy
post Aug 5 2013, 03:33 PM

Getting Started
**
Junior Member
68 posts

Joined: Jan 2006


QUOTE(cheon @ Aug 5 2013, 03:29 PM)
All minor defects such as tiles crack,hollow, water leaking, poor painting job....
*
holy....for the poor painting, can ask them re-paint again?
cheon
post Aug 5 2013, 03:39 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(odsyauy @ Aug 5 2013, 03:33 PM)
holy....for the poor painting, can ask them re-paint again?
*
Yes, i think they will paint for you.

But really troublesome to check one by one, i spent almost a week time ~
odsyauy
post Aug 5 2013, 03:45 PM

Getting Started
**
Junior Member
68 posts

Joined: Jan 2006


QUOTE(cheon @ Aug 5 2013, 03:39 PM)
Yes, i think they will paint for you.

But really troublesome to check one by one, i spent almost a week time ~
*
ok, then will visit your house once i get my key. so can learn from you how and what to inspect rclxms.gif
ORIZ
post Aug 5 2013, 04:00 PM

Getting Started
**
Junior Member
180 posts

Joined: May 2013
QUOTE(cheon @ Aug 5 2013, 03:39 PM)
Yes, i think they will paint for you.

But really troublesome to check one by one, i spent almost a week time ~
*
a week continuously or what ? I have d keys for almost a month and still cannot finish doing defect. Doin it mostly on weekends. too tiring to cover 3 floors and the external part of the bld.

if I were to count surely banyak la but its all minor defects to do with spots/holes/cracks/hollow tiles etc. nothing major so far. so all in all ok la. lets see how they will rectify it. I am resigned to the fact that this developer is kedekut so the cheap tiles, cheap doors n some other shortcomings are expected la.

just wondering how many plug points are there in type A ? does it justify the 1 phase elec (I dun think so).

This post has been edited by ORIZ: Aug 5 2013, 04:02 PM
odsyauy
post Aug 5 2013, 04:03 PM

Getting Started
**
Junior Member
68 posts

Joined: Jan 2006


btw, may i know what is consider major defect?
ORIZ
post Aug 5 2013, 04:06 PM

Getting Started
**
Junior Member
180 posts

Joined: May 2013
QUOTE(odsyauy @ Aug 5 2013, 04:03 PM)
btw, may i know what is consider major defect?
*
internal leakage, badly cracked wall, uneven surface etc. dif ppl dif standard la
odsyauy
post Aug 5 2013, 04:07 PM

Getting Started
**
Junior Member
68 posts

Joined: Jan 2006


QUOTE(ORIZ @ Aug 5 2013, 04:06 PM)
internal leakage, badly cracked wall, uneven surface etc. dif ppl dif standard la
*
ok,noted
odsyauy
post Aug 5 2013, 04:12 PM

Getting Started
**
Junior Member
68 posts

Joined: Jan 2006


im newbie, so developer will and must fix all those major and minor defect? regardless wat we complain about?
cheon
post Aug 5 2013, 04:15 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(ORIZ @ Aug 5 2013, 04:00 PM)
a week continuously or what ? I have d keys for almost a month and still cannot finish doing defect. Doin it mostly on weekends. too tiring to cover 3 floors and the external part of the bld.

if I were to count surely banyak la but its all minor defects to do with spots/holes/cracks/hollow tiles etc. nothing major so far. so all in all ok la. lets see how they will rectify it. I am resigned to the fact that this developer is kedekut so the cheap tiles, cheap doors n some other shortcomings are expected la.

just wondering how many plug points are there in type A ? does it justify the 1 phase elec (I dun think so).
*
Haha, i need to work too...So i spend almost a month to inspect it. 4 weekened = 8 days there, very tiring.

Plug point i not sure...However, how come they can't give 3 phase to type A too ? Really disappointed rclxub.gif

122 Pages « < 103 104 105 106 107 > » Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0176sec    1.29    6 queries    GZIP Disabled
Time is now: 23rd December 2025 - 01:37 AM