Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed
3 Pages  1 2 3 >Bottom

Outline · [ Standard ] · Linear+

Investment Nadayu 92, Nadayu 92, anyone buying?

views
     
cheon
post May 30 2013, 05:40 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(nyzx @ May 30 2013, 01:31 PM)
Any phase 1 owner has renovate the house? Can share the design and renovation detail?
*
Yes, i wish to know too. Hope to get the key by next month and start renovation as soon as possible~ rclxms.gif
cheon
post Jul 9 2013, 06:49 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
I getting key on coming Friday for type A. Any neighbor here?
cheon
post Jul 10 2013, 11:23 AM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(AMINT @ Jul 9 2013, 10:55 PM)
Mine has no late payment. I signed snp like 2 months ago and full disbursement already for my type A. Do i still need to call Nizam?
*
Amint. Please make the payment at Standard Charterd Bank first. Total around RM1000.
Your house wat number?

cheon
post Jul 13 2013, 07:36 AM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
Huhuh,just get the key yesterday for Type A.

Anyone can share with me the contractor number for grill and renovation?

Thanks ya~
cheon
post Jul 15 2013, 10:16 AM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(AMINT @ Jul 13 2013, 09:08 AM)
Have u checked for any defects bro? How is the house? Ok?
*
The workmanship sweat.gif sweat.gif

Lots of defect, i gonna to spend 1 full day to inspect it.

Really cut cost house, have to spend lots for renovation~ doh.gif

cheon
post Jul 15 2013, 06:31 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(Pezu @ Jul 15 2013, 02:37 PM)
i can confirm that, memang during construction bangla workforce.

but, the mandur should do their job for quality control.
*
When i tried the key, one of the key was placed wrongly.

Nizam told me,'ini semua bangla punya kerja, wat to expect'?

rclxub.gif rclxub.gif
cheon
post Jul 23 2013, 11:59 AM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(AMINT @ Jul 23 2013, 09:44 AM)
Sharing some photo of type A.

user posted image

Uploaded with ImageShack.us

user posted image

Uploaded with ImageShack.us

user posted image

Uploaded with ImageShack.us
Initially I thought type A was a little bit weird but when i see finish product, the concept is actually not bad. Can you guys share your photos for different types?
*
Nice photo, bro! rclxms.gif

I feeling the same too. It's a nice design!


However, i will make some renovation on 2nd and 3rd floor.

Here's my plan, i will 'tampal' the big hole on the second floor which make the second floor a lot bigger.

Our master bedroom is quite small too. Thus, i plan to convert half of the living room on the 3rd floor becoming a big 'walk in wardrobe'

I have the quotation already with a good interior design contractor. The contractor will settle everything for me including renovation, wardrobe, kitchen cabinet etc... rclxms.gif rclxms.gif

I survey more than 10 companies and this is the best price & service i could get. biggrin.gif

It's a all in one contractor, do let me know if anyone need the telephone number for the contractor.
cheon
post Jul 23 2013, 12:16 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(Lcsx @ Jul 23 2013, 12:07 PM)
It's nice Amint,

You can make it really very grand if you like.

Nice modern chandelier. Change the rails to classic contemporary rails. Throw a nice large carpet on the ground floor. Nice matching sofas on the ground floor and nice matching dining table set on the second.

Think it will look impressive.
ps: you can later even use the unit to rent for photoshooting. Lol
*
I am an owner of Type A too. Can i have your opinion?

Is it worth that i cover the whole second floor? This will make the house a lot bigger~ hmm.gif


cheon
post Jul 23 2013, 12:55 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(Diablo143 @ Jul 23 2013, 12:20 PM)
Hi cheon,

Good idea on 'tampal' the hole, never really thought about that. Guess can do that if don't really bother about the sunlight from roof. Please PM me the ID contact details. Thanks.
*
PM already, pls check. The contractor said can give discount if doing together,haha rclxms.gif
cheon
post Jul 23 2013, 01:02 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(jit13 @ Jul 23 2013, 12:37 PM)
Bro, is the ID guy known to you? previous work done?

Anyway, can we view your nice unit after your big reno? smile.gif
*
Sure, no problem. Everyone welcome biggrin.gif biggrin.gif

The contractor put some advertisement in local magazine, and he's my staff's friend.

My brother just asked him to do a wardrobe at Kajang Utama. RM3300 including anti-jump door until top for 7.5 feet width wardrobe.
I think this is a good price since this guy can provide us 3D design and the material is quite ok one.

Others might be cheaper, but the design is a bit old fashioned~
cheon
post Jul 23 2013, 01:04 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(Malaysian_driver @ Jul 23 2013, 12:37 PM)
Tampal the "hole" then gone lar the concept...  But it's up to you lar.  Do you need to build extra support to cover the "hole"?  One man's hole is another's poison...  Not all holes can accommodate everyone's liking.
*
Yes, i am thinking too. Once tampal the hole the whole house will become bigger. However, the concept gone.

Yes, we need some support. Anyway, the cost to tampal the hole is quite reasonable~

This post has been edited by cheon: Jul 23 2013, 01:07 PM
cheon
post Jul 23 2013, 01:11 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(odsyauy @ Jul 23 2013, 01:06 PM)
pm me the contact number oso  thumbup.gif
*
PM already. The contractor said can give some free gift or discount if we doing together tongue.gif tongue.gif



cheon
post Jul 23 2013, 01:26 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(wongtk @ Jul 23 2013, 01:17 PM)
bro, congrats. May I have your contractor info, please PM. Thanks alot! rclxms.gif
*
No problem, please check your PM. No harm to give him a call to ask for quotation biggrin.gif
cheon
post Jul 23 2013, 01:31 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(jit13 @ Jul 23 2013, 01:19 PM)
Can do 3D and advertise in mags - must be a professional ID guy, huh? If he include semidee side owners for discount, will definitely consider end 2014.  biggrin.gif
*
Yes, the contractor is a nice friendly guy.

I went to lots of exhibition and lots of kitchen cabinet companies, came back to this guy finlly.

His price might be not the cheapest, but he's providing 3D design, which i think is quite important for us.
cheon
post Jul 23 2013, 01:44 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(meta369 @ Jul 23 2013, 01:32 PM)
Can PM me his contact no as well?  thumbup.gif
*
Done..pls check biggrin.gif

cheon
post Jul 23 2013, 01:47 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(AMINT @ Jul 23 2013, 01:35 PM)
imagine u cover the big hole. the lowest floor will be very dark coz we dont have a sliding door at the lowest floor as we only have 2 small windows and 1 door. wanna do sliding door? cannot coz this is strata title. facade cannot change. stucked here. the only thing that we can do is to put on lights. many of them.this is my pov. of course it is up to own preference.

Those who bought semi d have the option to do the same as well on your middle floor. i rather not cover. can share the contractor? if we all do together sure discount2. smile.gif
*
Yeah...hopefully he can give us a good price.

Btw, Nizam is nice to me too. There's some major defect when i got the key. He actually called his guys to repair the major defect before i submit he defect form.
Now left minor minor defect only biggrin.gif
cheon
post Jul 23 2013, 02:16 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(Lcsx @ Jul 23 2013, 01:55 PM)
Well as Malaysian Driver said, you can but you will do away will the existing concept.

Just a few concerns I guess. The ground floor ventilation will still be there but reduced. The air flow will be through your staircase area.

Of course lighting will be another area you may need to look at. Your house is essentially 3 floors. So the ground floor may be dark. I am not sure, can't tell about how bright it will still be after covering.

You should check on whether it is necessary to reinforce the foundation although it is unlikely that you will actually need to by adding the floor space.

The other part is on the approvals part. As you know we are still under master title and we be applying for strata in future. Not sure whether management would easily allow this type of modification at this point of time. You will have to check with them.

And I am guessing you would like to build that portion into a room right? You will have to get bomba approval later on also if you want to do it officially.
*
Thanks so much for the suggestion smile.gif I will definitely think about it.

I am not converting it into a room, just make it to an additional living room, or might be a playground for kids in the future.

Thanks again ya rclxms.gif
cheon
post Jul 23 2013, 02:21 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(Yuantzer @ Jul 23 2013, 02:10 PM)
Hi cheon , could you pm me as well for the ID contact . How much does he charge for ID quotation ?
*
Don't worrry, it's free of charge. He actually give me a 3D drawing for my kitchen cabinet before i confirm with him.

Eventually, i haven't paid any deposit to him yet until now, still waiting for the final quotation now.

No harm to give him a call biggrin.gif
cheon
post Jul 23 2013, 02:24 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(AMINT @ Jul 23 2013, 02:18 PM)
Yeah that would be nice if u wanna cover the big hole. So ur lowest living room can be for ur guess only. No need kacau ur family above
*
Haha. I am a soho, work from home guy.

Since there's a big space on the middle floor, i can convert the living room into my office.

However, wife not allow doh.gif
cheon
post Jul 23 2013, 02:42 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(kkteng @ Jul 23 2013, 02:38 PM)
Hi Cheon, I'm interested with the details as well, pls PM me the ID info.
It would be really great if we can have a view of the ID finishing, as my type-I will only be completed by end 2014.
*
Done. Pls check~

3 Pages  1 2 3 >Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0233sec    0.47    7 queries    GZIP Disabled
Time is now: 22nd December 2025 - 02:08 AM