jonaskhoo
post Feb 14 2011, 09:23 AM

Getting Started
**
Junior Member
101 posts

Joined: Oct 2006
QUOTE(jeghui @ Feb 13 2011, 09:48 PM)
How's the handover key like? How much to pay for the utilities deposit?
*
yeah.. how is the handover procedure? how much for the deposit? My bank disbursed on last fri and cheque will reach TTDI today. Need to know what i have to do next.
jonaskhoo
post Feb 16 2011, 11:32 AM

Getting Started
**
Junior Member
101 posts

Joined: Oct 2006
QUOTE(jeghui @ Feb 15 2011, 07:23 PM)
Bro mind sharing the price you paid for corner lot? Give a range also can.
*
They got my cheque edi and called me just now to pay the deposit. and She said paling awal next Wednesday afternoon can get key.
Ask me straight away go to SPIRA there, all their site people will be there also for the defect checking.
jonaskhoo
post Feb 16 2011, 03:49 PM

Getting Started
**
Junior Member
101 posts

Joined: Oct 2006
QUOTE(naing @ Feb 16 2011, 01:52 PM)
Spira corner lots are affordable comparing with Viola... price around 700k++ for 4000+ sq-ft of land.
Most of Viola corner lots are around 900k. BU and land maybe bigger for viola but I won't buy corner lot in viola as I definitely can't afford them.


Added on February 16, 2011, 1:58 pm

So TTDI takes one week to transfer the house after getting the check. I am not sure I want to wait that long. I will push TTDI to transfer the house to me within a few days. I just paid utilities fees to TTDI even if my bank has not sent the check to TTDI yet:) I am doing anything to get the house ASAP:)
*
I also asked her to make it earlier, but she told me that they have to clean the house, call the contractor. and she said that it is mentioned in our agrrement that they require 7 working days after receive the cheque to release the key. mad.gif
so not going to argue with them la.. just wait for next wed..
jonaskhoo
post Feb 16 2011, 05:06 PM

Getting Started
**
Junior Member
101 posts

Joined: Oct 2006
QUOTE(engm85 @ Feb 14 2011, 09:48 PM)
My loan was disbursed last wednesday, and the cheque was received by TTDI on friday. i did request them for quick key handover, as i need the house badly. i already paid the utilities last 2 weeks, so that they have ample time with regards to the water and electrical installation. if i'm not mistaken, i paid about RM630 for both utilities.

Now  feel very tired, after long survey for the lamps+fans. i did all my shopping at Puchong. Piece of advise, make sure u guys do very well survey before buying, as the price difference was quite huge. smile.gif
*
engm85, how is your house's defect checking?
jonaskhoo
post Feb 17 2011, 12:46 PM

Getting Started
**
Junior Member
101 posts

Joined: Oct 2006
QUOTE(engm85 @ Feb 17 2011, 08:05 AM)
when the TTDI staff giving out the keys, it was not really meant for the defect checking. it just want to check on the house accessories (how many fan hook, power socket, toilet basin etc). then i asked him with regards to the defect thingy, he said that i can fill up the form (which i can get from office), or email them. then they will send their them to inspect and fix it.

for now, few defects that i already outline and taken photo.

1. Main door was not in good order. the wood 'skew' a lil bit, which make it harder to shut the door.

2. Store : The door knob is very tight, so it cannot be close smoothly. they might need to change with new knob

3. the Tile in the kitchen, few of them was cracked, and not properly in place.

4. The tile in the sharing toilet (bedroom 2 & 3) , 3 tiles was cracked.
but personally, i think this is very minor, and i think they already did a very good job. love the quality.  icon_rolleyes.gif
*
Thanks for the sharing. so that means they will only start repair the defect after submitted the form. Please check your plumbing also, let the water goes into your house.. I was informed by their guard that most of the SPIRA plumbing got many problem which thay had repaired last few months. Donno is this the reason they are delaying the key giving.
jonaskhoo
post Mar 8 2011, 03:20 PM

Getting Started
**
Junior Member
101 posts

Joined: Oct 2006
QUOTE(zenquix @ Mar 8 2011, 12:47 PM)
did anyone notice that in S&P, ground floor should be Skim coat and Fibrous Plaster Ceiling but the actual unit is only concrete ceiling?
*
yeah. i had mentioned this earlier here. I also highlighted to TTDI, but they said Ground floor Plaster ceiling is to cover the piping area which is near the Living room wall with aircond point and also the backyard area. those are very small area. i am waiting their architecture confirmation letter on this matter. Once i get this then I will consult with lawyer. zenquix, what do u think?

I have found some of the major defects for my house:
- Hollow Tiles in Dining and Living (already changed yesterday)
- Most of the lighting & plug point not function (already settle last week)
- Water Leaking at Car Porch drainpipe
- Water Mark found at Master bedroom bathroom's wall (wall with aircond point) bottom area (after did water proof test)
- Above the court yard, near skylight roof, found a big hole

Minor Defect
-The court yard floor with rocks (batu kecil) near toilet wall is wet always (i am not sure it is same to all houses or not?)
- Store room door cannot close firmly
- Water leaking at water meter area
jonaskhoo
post Mar 8 2011, 04:56 PM

Getting Started
**
Junior Member
101 posts

Joined: Oct 2006
QUOTE(jeghui @ Mar 8 2011, 04:15 PM)
how do you know if the ceiling is Skim coat and Fibrous Plaster Ceiling ? can touch and feel ah?
*
You can see with your eyes, there is no plaster ceiling at ground floor, or you can open the plaster ceiling cover near living room wall with aircond point), then u can see the piping which is linked to 1 floor. but this is for type A, I am not sure same to others or not.
jonaskhoo
post Mar 9 2011, 08:57 AM

Getting Started
**
Junior Member
101 posts

Joined: Oct 2006
QUOTE(zenquix @ Mar 8 2011, 07:43 PM)
in my point, you cannot put the ceiling as a certain material in the S&P and only cover less than 5% of it with it. If they don't fix it or reimburse, will take legal action as developers cannot just take owners for a ride.

do you mind sharing how to check for the hollow tiles?  Are these the tiles on the floor?

Also for the waterproof test, did you just fill up the shower area or the bathroom floor as well? Please share the methodology so that I can describe to my gf. Am not in town at the moment sad.gif
*
I also hightlighted this to them but they seem like no further action and said waiting the confirmation letter from their Architecture. So I just wait for it and also will take legal action for this. please ask them for the official letter if they insist no plaster ceiling for the ground floor, then only u can consult with ur lawyer.

I used coin 50cents to knock all the tiles. their contrator using iron ball to knock which got more easy checking.

For the waterproof, buy 4 packs clay from stationery shop and stick them on each bath room outfall area and let the water flood ur bathroom for 1 inch high will do. put this for few days and check all the walls. if got water mark then the test failed.
jonaskhoo
post Mar 9 2011, 09:52 AM

Getting Started
**
Junior Member
101 posts

Joined: Oct 2006
QUOTE(naing @ Mar 8 2011, 06:28 PM)
I have already drilled the ground floor ceiling for lighting. No plaster ceiling. Just only inside toilets, in my case.


Added on March 8, 2011, 6:29 pm
How long do they take to repair defects after your complain? I am sending the list of defects to them this weekend. Haven't check them properly.
*
naing, u don mind for the plaster ceiling for ground floor? I wanted to put downlight at ground floor, so must do the plaser ceiling.
i raised these on 24th Feb and repaired tiles and power point defect by 7th Mar. still waiting for the others defect to be repaired.


Added on March 9, 2011, 10:05 am
QUOTE(spydermind @ Mar 9 2011, 09:21 AM)
skim coat is not the same as plaster ceiling. When you mean cement ceiling, are you asaying that it is grey in colour??? If so, this is not acceptable at not...but if the ceiling already been skim coated, it is fine actually.
*
yeah.. it is skim coated. However it is cement ceiling instead of plaster ceiling, cement ceiling cannot install downlight unless u use those cone type downlight and need to conceal your wiring if added more downlight.

This post has been edited by jonaskhoo: Mar 9 2011, 10:05 AM
jonaskhoo
post Mar 9 2011, 11:30 AM

Getting Started
**
Junior Member
101 posts

Joined: Oct 2006
QUOTE(naing @ Mar 9 2011, 10:49 AM)
Umm.. i bought all lights in aluminium/glass type so I got more trouble in stalling them in plaster ceiling:)

Using the word of "Skim coat and Fibrous Plaster Ceiling" for ground floor maybe technically correct for our houses as some portions are Skim coat and some portions are Fibrous Plaster Ceiling in the ground floor. I think they will use that explanation to counter your argument.
*
ic.. then u should be ok for no plaster ceiling..
i think it should be "skim coat and fibrous" plaster ceiling instead of "skim coat cement ceiling and Fibrous plaster ceiling" tongue.gif
any explaination will do, as long as they send me the official letter for their explaination.
jonaskhoo
post Mar 9 2011, 02:18 PM

Getting Started
**
Junior Member
101 posts

Joined: Oct 2006
QUOTE(spydermind @ Mar 9 2011, 02:04 PM)
Even if they provide plaster ceiling, also need to see the height, otherwise, you might need to use downlight with horizontal bulk alignment.

If you want to put up plaster ceiling, you need to see what is the current ceiling height....because you need at least about a 1 feet for plaster ceiling, then it will reduce the overall ceiling height if the original ceiling is not that high...
*
ground floor is around 10 ft height and you can see crossbeam between living and dining room, it should around 1 ft, gam gam for the plaster ceiling to cover the beam.
spydermind, u also not going to do the plaster ceiling?
jonaskhoo
post Mar 10 2011, 11:12 AM

Getting Started
**
Junior Member
101 posts

Joined: Oct 2006
QUOTE(pk7036 @ Mar 10 2011, 10:13 AM)
Thanks a lot f good info & tips


Added on March 10, 2011, 10:21 am
I watched fr interior design TV program...there's another way to install downlight by using light box. some pple do all 4 edges of living,some do at center of ceiling.


Added on March 10, 2011, 10:58 am
blink.gif  can u pls teach me...how to check lighting & plug point not function? thanks in advance
*
for plug point, bring ur small electric appliance or phone charger plug into every plug point to test. for lighting point u have to buy a test pen and bring a ladder (but not advise to do this if u r not pro la.. smile.gif)
jonaskhoo
post Mar 10 2011, 11:43 AM

Getting Started
**
Junior Member
101 posts

Joined: Oct 2006
QUOTE(naing @ Mar 10 2011, 11:27 AM)
When we request for defect fixing, we need to give them our house key. Not sure how safe is that. It's typical procedure but I am worry that someone might duplicate the key.
*
no choice la.. i edi gave them the key only the main door key.. but don give padlocks key, if possible find some old pad locks and give them the old 1 after u install the grills.
jonaskhoo
post Mar 14 2011, 01:56 PM

Getting Started
**
Junior Member
101 posts

Joined: Oct 2006
QUOTE(naing @ Mar 14 2011, 12:56 PM)
Don't you think it is too expensive? I am paying just 7250 for the whole house with so many doors and windows and court yard too.... Going to install this weekend...
Let me know if you need my grill guy phone no. If you want their workmanship, just come and look at it my house this weekend...
*
I edi paid 2k for the deposit. Yes, u have to pay for kitchen, wiring & Grill works. Grill is categorising in iron works. for more detail please see the attached TTDI reno permit request form. [attachmentid=2094372]


Added on March 14, 2011, 1:58 pm
QUOTE(naing @ Mar 14 2011, 12:56 PM)
Don't you think it is too expensive? I am paying just 7250 for the whole house with so many doors and windows and court yard too.... Going to install this weekend...
Let me know if you need my grill guy phone no. If you want their workmanship, just come and look at it my house this weekend...
*
Hi Naing, your grill contrator is same to mine. last week my grill fixed edi.

This post has been edited by jonaskhoo: Mar 14 2011, 01:58 PM
jonaskhoo
post Mar 14 2011, 02:43 PM

Getting Started
**
Junior Member
101 posts

Joined: Oct 2006
QUOTE(naing @ Mar 14 2011, 02:18 PM)
That's why Ivy said someone in Spira has already ordered from them..So it was you:) How is your grill? any complaints?smile.gif I saw their work in their factory. I am happy with their workmanship but not sure how my grill will come out:)
*
their workmanship is good and important thing is their service are good. they had fullfill all my equirements. my design is using solid flat bar type.
jonaskhoo
post Mar 14 2011, 03:10 PM

Getting Started
**
Junior Member
101 posts

Joined: Oct 2006
QUOTE(narayan @ Mar 14 2011, 02:57 PM)
jonaskhoo.. how much did you pay for the grills ? spray paint / powdercoat ? 20x70 unit ?
*
yeah.. i am type A. it is spray paint without powdercoat.. normal price is rm9 and 11 for windows and door and u need to topup a bit for windows frame skirting.
jonaskhoo
post Mar 14 2011, 04:04 PM

Getting Started
**
Junior Member
101 posts

Joined: Oct 2006
QUOTE(narayan @ Mar 14 2011, 03:32 PM)
pardon my ignorance... but how many sqft is needed to cover
front main door,
back door,
front sliding door,
master bedroom window,
bedroom 2 + 3 + 4 window,
kitchen window,

overall total cost for type A ?  rclxub.gif
*
u need to count for the bedroom's bathroom windows also. overall is around 300sqft. I did mine at 3700.
jonaskhoo
post Mar 15 2011, 04:05 PM

Getting Started
**
Junior Member
101 posts

Joined: Oct 2006
QUOTE(narayan @ Mar 14 2011, 04:16 PM)
thanks for the input..

i have to plant more potatoes it seems..
basic stuff for house is so expensive this days..

btw, did you have the chance to compare the pricing with the onsite contractors that camps there ?
does the price difer much ?
*
Actually I didnt compare with the onsite contrator. but I did compare few for outside contrators. For that onsite contrator, I got asked them for the plaster ceiling price but they didnt give the actual price, just said everything they can do, price sure give reasonable 1..
so I not dare to ask them come to my house for measurement. Got 1 day, 1 of the guard came to my house told me that these people con people 1... haha not sure true or not.


Added on March 15, 2011, 4:06 pm
QUOTE(jeghui @ Mar 14 2011, 04:22 PM)
narayan, as ive said early, the contractors campers are offering rm3100 for type A. for the whole house.

but dodgy, i insisted on telling me the price in RM/sq ft. they dowan. just give full price for my type of house. (the 1870sq ft BU house)

btw jonas, your house, the inside part, you put grill also? the small taman area inside the house.
*
nope. no grill for the court yard windows and glass door.


Added on March 15, 2011, 4:10 pm
QUOTE(naing @ Mar 14 2011, 05:51 PM)
I think jonaskhoo add a lot of extra so he paid that much. If I am not mistaken, you could get RM 8-9 psf for white horizontal bar type and it would only cost you around RM 3000 for type A.

For comparison, my house has 550 sq-ft of windows and 230 sq-ft of doors and it would only cost me 6700 if I just do mild-steel horizontal rectangular hollow bar with white color. Of course if we add skirting and powder coating, then it become 9000:) So it depends on how you want it....


Added on March 14, 2011, 5:54 pm

The location is good if the next launch is in front of Spira but it's too expensive if what you said is true for the price. It was just 490k for viola! And Viola will be ready by next year.
*
Naing, not much extra la.. but actually they gave me thicker flat bar. biggrin.gif

This post has been edited by jonaskhoo: Mar 15 2011, 05:04 PM
jonaskhoo
post Mar 16 2011, 01:39 PM

Getting Started
**
Junior Member
101 posts

Joined: Oct 2006
QUOTE(tanong @ Mar 16 2011, 12:10 PM)
I suspect you are my next door neighbour ...I have water mark on the left side side (direction-if u come in from the main entrance), that means right side for you?

plaster ceiling still waiting for quote as I have other requirement.... also getting unity kitchen to quote but they seem so slow in getting back...

Got some quotes for wrought iron grille (I wanted the simple white one), the cheapest (mentioned they quote me the before CNY price) so far is:

Door:  RM9 per sq ft
Window: RM7 per sq ft
Powder coating: add RM2.5 per sq ft
Galvanize (to cover top of courtyard): RM4.50 per sq ft
*
u plan to fix the court yard roof top with galvanize grill?

This post has been edited by jonaskhoo: Mar 16 2011, 01:40 PM
jonaskhoo
post Mar 18 2011, 11:52 AM

Getting Started
**
Junior Member
101 posts

Joined: Oct 2006
QUOTE(KeMM @ Mar 18 2011, 09:19 AM)
Naing, for me the water pressure was low only for the bathroom master bedroom. other bathroom seems to be satisfactory..
*
I dont think the water pressure is good enug if we open few of the water taps at the same time. I going to install water pump anyway. Do u guy notice that we have a water pump plug point on the second floor roof? and there is one switch at the family room for that water pump point. Since it is given, why not we use it? just nees to buy a water pump and pay for the installation fee, no additional wiring needed edi. Who got any idea about water pump? looking for budgeted and quality 1.

This post has been edited by jonaskhoo: Mar 18 2011, 11:52 AM