Welcome Guest ( Log In | Register )

23 Pages « < 17 18 19 20 21 > » Bottom

Outline · [ Standard ] · Linear+

 Sunway Alam Suria, Double Storey Homes

views
     
ohohling
post Jun 6 2013, 11:58 AM

Getting Started
**
Junior Member
124 posts

Joined: Dec 2007
hi guy, there is a shell petrol station under construction at sunway kayangan.... i think operate soon... next time no need find petrol station before going back home already thumbup.gif

was waiting this facility quite long time...

the shop lot i think also going to hand over to buyer soon... hope to have a starbucks coffee shop there... ahahhaha


Th3Matrix
post Jun 7 2013, 08:57 AM

Getting Started
**
Junior Member
61 posts

Joined: Dec 2005


QUOTE(ohohling @ Jun 6 2013, 11:58 AM)
hi guy, there is a shell petrol station under construction at sunway kayangan.... i think operate soon... next time no need find petrol station before going back home already  thumbup.gif

was waiting this facility quite long time...

the shop lot i think also going to hand over to buyer soon... hope to have a starbucks coffee shop there... ahahhaha
*
+1

The road is also widen to give better access to the shell station. Hopefully got good shops opening soon.
albagubra
post Jun 7 2013, 11:55 AM

New Member
*
Junior Member
23 posts

Joined: Apr 2005


QUOTE(yunodie @ Jun 4 2013, 11:06 PM)
I guess I would be getting it on the 15th afterall. No LAD.  cry.gif

The maintenance fee must be for rubbish disposal I believe, until MBSA take over the job. Total outstanding that I need to pay Sunway before I can collect the keys is RM1423.78. Also need to make sure their lawyer get the remaining 5%.
*
Just called Nini (Sunway) asked her about error of "project name" and "Property Type", and she says it just typo. U can ignore it. We just reuse the template.
Wow!!! This is reputational risk for SUNWAY.

albagubra
post Jun 7 2013, 11:58 AM

New Member
*
Junior Member
23 posts

Joined: Apr 2005


QUOTE(yunodie @ Jun 4 2013, 11:06 PM)
I guess I would be getting it on the 15th afterall. No LAD.  cry.gif

The maintenance fee must be for rubbish disposal I believe, until MBSA take over the job. Total outstanding that I need to pay Sunway before I can collect the keys is RM1423.78. Also need to make sure their lawyer get the remaining 5%.
*
Same as me. RM1423.78. Now waiting my financier to release the remaining balance. Once released, can get the key. LOL
dp82
post Jun 7 2013, 02:51 PM

Enthusiast
*****
Senior Member
862 posts

Joined: Nov 2007
QUOTE(Th3Matrix @ Jun 7 2013, 08:57 AM)
+1

The road is also widen to give better access to the shell station. Hopefully got good shops opening soon.
*
I find that the road is dangerous with cars speeding down the slope and there are a lot of road junction in between. Hope MBSA can do something bout it like install a BUMP.
ohohling
post Jun 7 2013, 03:41 PM

Getting Started
**
Junior Member
124 posts

Joined: Dec 2007
QUOTE(dp82 @ Jun 7 2013, 02:51 PM)
I find that the road is dangerous with cars speeding down the slope and there are a lot of road junction in between. Hope MBSA can do something bout it like install a BUMP.
*
dun install bump la... car easy rosak... haha...

actually ppl should gv the signal before turning in... i hate those ppl who wanna turn nv gv signal... if u put signal then ppl behind sure will take note 1 ma...else claim his insurance... hahaha
tongue.gif
ohohling
post Jun 7 2013, 03:42 PM

Getting Started
**
Junior Member
124 posts

Joined: Dec 2007
QUOTE(albagubra @ Jun 7 2013, 11:58 AM)
Same as me.  RM1423.78. Now waiting my financier to release the remaining balance. Once released, can get the key. LOL
*
so nice... i still waiting them to bill me for the remaining then will go make the payment...

yunodie
post Jun 7 2013, 03:42 PM

Casual
***
Junior Member
475 posts

Joined: Dec 2011


QUOTE(dp82 @ Jun 7 2013, 02:51 PM)
I find that the road is dangerous with cars speeding down the slope and there are a lot of road junction in between. Hope MBSA can do something bout it like install a BUMP.
*
it is a steep and long slope, not possible to build ramp unless you want cars to fly.
yunodie
post Jun 7 2013, 03:44 PM

Casual
***
Junior Member
475 posts

Joined: Dec 2011


QUOTE(albagubra @ Jun 7 2013, 11:58 AM)
Same as me.  RM1423.78. Now waiting my financier to release the remaining balance. Once released, can get the key. LOL
*
i went to pay with cash just now. clarified with the CCD people. No need official letter from financier. Just a confirmation or proof of release of payment to their lawyer (cheque deposit slip etc)
ohohling
post Jun 7 2013, 03:48 PM

Getting Started
**
Junior Member
124 posts

Joined: Dec 2007
QUOTE(Th3Matrix @ Jun 7 2013, 08:57 AM)
+1

The road is also widen to give better access to the shell station. Hopefully got good shops opening soon.
*
this area is getting improvement... hopefully will have more nice restaurant...

besides that anyone know what project is going on opposite greenhill?

show a few big building under construction, 1 of it is DB Schenker...

heard from my coll stay at cahaya SPK say may have KTM service at U10...
yunodie
post Jun 7 2013, 03:54 PM

Casual
***
Junior Member
475 posts

Joined: Dec 2011


QUOTE(ohohling @ Jun 7 2013, 03:48 PM)
this area is getting improvement... hopefully will have more nice restaurant...

besides that anyone know what project is going on opposite greenhill?

show a few big building under construction, 1 of it is DB Schenker...

heard from my coll stay at cahaya SPK say may have KTM service at U10...
*
dont think it is possible with the nearest KTM station at Shah Alam Batu Tiga and Sg Buloh, which is around 20km away.
ohohling
post Jun 7 2013, 03:58 PM

Getting Started
**
Junior Member
124 posts

Joined: Dec 2007
QUOTE(yunodie @ Jun 7 2013, 03:54 PM)
dont think it is possible with the nearest KTM station at Shah Alam Batu Tiga and Sg Buloh, which is around 20km away.
*
the KTM is propose for UITM student... but i also not sure la...coz see at the road structure really dunno how they going to build it... haha
meteoraniac
post Jun 7 2013, 04:04 PM

Regular
******
Senior Member
1,099 posts

Joined: Aug 2005


would prefer the local council to provide more greenery on the stretch of road leading to SAS and also street lamps.
dp82
post Jun 7 2013, 04:20 PM

Enthusiast
*****
Senior Member
862 posts

Joined: Nov 2007
QUOTE(yunodie @ Jun 7 2013, 03:44 PM)
i went to pay with cash just now. clarified with the CCD people. No need official letter from financier. Just a confirmation or proof of release of payment to their lawyer (cheque deposit slip etc)
*
The balance should be paid by financier or buyer?
Th3Matrix
post Jun 7 2013, 04:34 PM

Getting Started
**
Junior Member
61 posts

Joined: Dec 2005


QUOTE(ohohling @ Jun 7 2013, 03:41 PM)
dun install bump la... car easy rosak... haha...

actually ppl should gv the signal before turning in... i hate those ppl who wanna turn nv gv signal... if u put signal then ppl behind sure will take note 1 ma...else claim his insurance... hahaha
tongue.gif
*
That area is accident prone because the junction is just after the uphill if coming from Guthrie. Might need clear warning signage and drivers should signal much earlier too.


QUOTE(ohohling @ Jun 7 2013, 03:58 PM)
the KTM is propose for UITM student... but i also not sure la...coz see at the road structure really dunno how they going to build it... haha
*
I think it would be difficult considering U10 is behind Taman Bukit Cerakah Forest reserve. In fact the DASH hway also until now no news.
yunodie
post Jun 7 2013, 05:40 PM

Casual
***
Junior Member
475 posts

Joined: Dec 2011


QUOTE(dp82 @ Jun 7 2013, 04:20 PM)
The balance should be paid by financier or buyer?
*
Rm1423.78 is TNB, Water Deposit and miscellaneous, paid by you to developer. The other 15% and 5% of purchase price is paid to developer and developer's lawyer respectively, by your Financier.
TubeNRibbon
post Jun 8 2013, 08:30 PM

Getting Started
**
Junior Member
176 posts

Joined: May 2008
QUOTE(yunodie @ Jun 7 2013, 05:40 PM)
Rm1423.78 is TNB, Water Deposit and miscellaneous, paid by you to developer. The other 15% and 5% of purchase price is paid to developer and developer's lawyer respectively, by your Financier.
*
Are you from Block J? I still waiting for the letter to make payment.
ohohling
post Jun 8 2013, 10:32 PM

Getting Started
**
Junior Member
124 posts

Joined: Dec 2007
Anyone know is that the house got tangki? It place at which part?
yunodie
post Jun 9 2013, 12:13 AM

Casual
***
Junior Member
475 posts

Joined: Dec 2011


QUOTE(TubeNRibbon @ Jun 8 2013, 08:30 PM)
Are you from Block J? I still waiting for the letter to make payment.
*
Yes I'm from block j. When did u sign your spa?mine is on 2011 june 15th which explains why they are in a hurry to deliver VP to me lest they have to pay LAD to me.


QUOTE(ohohling @ Jun 8 2013, 10:32 PM)
Anyone know is that the house got tangki? It place at which part?
*
Every landed house must have water tank. It is on top of the studio room. No access though. Still figuring out how to get there to install a pump.
ohohling
post Jun 9 2013, 09:44 AM

Getting Started
**
Junior Member
124 posts

Joined: Dec 2007
QUOTE(yunodie @ Jun 9 2013, 12:13 AM)
Yes I'm from block j. When did u sign your spa?mine is on 2011 june 15th which explains why they are in a hurry to deliver VP to me lest they have to pay LAD to me.
Every landed house must have water tank. It is on top of the studio room. No access though. Still figuring out how to get there to install a pump.
*
Should have a access else how to repair? Last night go to home deco at stadium shah alam saw a water pump RM1288 dunno worth to buy or not is Gemini brand...

23 Pages « < 17 18 19 20 21 > » Top
 

Change to:
| Lo-Fi Version
0.0292sec    0.39    6 queries    GZIP Disabled
Time is now: 20th December 2025 - 12:49 AM