https://www.gdparchitects.com/ativo-suites-damansara-avenue/
Investment DAMANSARA AVENUE | AZELIA | ATIVO SUITES, highrise version of Desa Park City?
Investment DAMANSARA AVENUE | AZELIA | ATIVO SUITES, highrise version of Desa Park City?
|
|
Nov 5 2021, 07:56 AM
|
![]()
Junior Member
25 posts Joined: Jul 2011 |
GravityFi3ld liked this post
|
|
|
|
|
|
Nov 6 2021, 02:08 AM
|
![]() ![]()
Junior Member
159 posts Joined: Aug 2021 |
Bandar sri damansara
|
|
|
Nov 17 2021, 12:46 AM
|
![]() ![]() ![]()
Junior Member
315 posts Joined: Oct 2015 |
QUOTE(ry8128 @ Nov 3 2021, 01:19 PM) Based on what SA told me, it is not directly connected from Ativo. Good questions, we've been anticipating this for a while. It will only be built with the next launch which is Ativo Annexe but we'll never know exactly how long that will takeAtivo will be connected to a commercial buidling, and the link bridge will be from this commercial building. There are detailed technical drawing and announced plans for the pedestrian link to the Damansara Sentral MRT Station, we've seen them too sourced from TA Global themselves... but we'll never know until the chubby lady sings~~~ Logically, it makes business sense for TA Global to do it, since DA is eligible to get Pembangunan Berorientasikan Transit or TOD status based on that small foothold DA gets to be within 400m radius of the MRT station. But when TA Global choses to activate it for its own marketing/sales benefit (value proposition to prospective buyers), is anybody's guess. They've been shrewd and calculative with their past launches, always pivoting to maximize marketing value by investing in specific things just to boost the valuation and hence sale price (e.g. DA Square) so, maybe they will have to do it to create something for Ativo Annexe P.S> and you are right, when the pedestrian link is built, it is not necessarily a short walk (est 750 meters) for Ativo Suite residents, but at least it is likely a sheltered walk through an air conditioned community mall This post has been edited by when2meets2boy: Nov 17 2021, 12:49 AM Attached thumbnail(s) |
|
|
Nov 17 2021, 01:03 AM
|
![]() ![]() ![]()
Junior Member
315 posts Joined: Oct 2015 |
QUOTE(when2meets2boy @ Nov 17 2021, 12:46 AM) Good questions, we've been anticipating this for a while. It will only be built with the next launch which is Ativo Annexe but we'll never know exactly how long that will take PS> Almost somewhat reassuring is that TA Global is incessant when they talk about this "proposed pedestrian link" all over the press, marketing material, and even in a letter with the S&P. E.g. https://www.theedgemarkets.com/article/cove...nger-population ---- so if they "chicken out" or "cheap out" the whole world will laugh at them, and then its kiss goodbye to their high-valuations and asking priceThere are detailed technical drawing and announced plans for the pedestrian link to the Damansara Sentral MRT Station, we've seen them too sourced from TA Global themselves... but we'll never know until the chubby lady sings~~~ Logically, it makes business sense for TA Global to do it, since DA is eligible to get Pembangunan Berorientasikan Transit or TOD status based on that small foothold DA gets to be within 400m radius of the MRT station. But when TA Global choses to activate it for its own marketing/sales benefit (value proposition to prospective buyers), is anybody's guess. They've been shrewd and calculative with their past launches, always pivoting to maximize marketing value by investing in specific things just to boost the valuation and hence sale price (e.g. DA Square) so, maybe they will have to do it to create something for Ativo Annexe P.S> and you are right, when the pedestrian link is built, it is not necessarily a short walk (est 750 meters) for Ativo Suite residents, but at least it is likely a sheltered walk through an air conditioned community mall And also the scale model for Ativo Annexe with the pedestrian bridge is so detailed that even the roads are actual on scale and aligned with existing roads. So there is a little more hope to place some trust in TA Global Blue: existing roads. Brown: Existing elevated MRT. Purple: Proposed access roads from DUKE 2 and MRR2 into DA area. Pink: proposed pedestrian bridge linking DA to MRT Station Damansara Sentral Attached thumbnail(s) |
|
|
Nov 17 2021, 02:10 PM
|
![]() ![]() ![]()
Junior Member
352 posts Joined: Mar 2018 |
I think the design have changed a lot since this planning (Ativo Annexe) years ago.
Why they call this station Sri Damansara Sentral? Will this be the Development focal area in Sri Damansara? |
|
|
Nov 18 2021, 12:18 PM
Show posts by this member only | IPv6 | Post
#1266
|
![]() ![]() ![]()
Junior Member
315 posts Joined: Oct 2015 |
QUOTE(BukitKing222 @ Nov 17 2021, 02:10 PM) I think the design have changed a lot since this planning (Ativo Annexe) years ago. Yeah I had a look at the TA Global's final public financial report (up to 2019 - they've bought back took TA Global private in 2020), the ATIVO ANNEXE was reported to have launch set in end 2019 early 2020 before the pandemic hits. I think whatever latest designs you can find on Annexe would likely be close to the final version with some tweaksWhy they call this station Sri Damansara Sentral? Will this be the Development focal area in Sri Damansara? The three stations have been renamed DAMANSARA WEST (near 8Atrium) DAMANSARA CENTRAL (Jalan Dagang) and then DAMASARA EAST (located beside the KTM station). I guess that's the logic |
|
|
|
|
|
Nov 18 2021, 12:20 PM
Show posts by this member only | IPv6 | Post
#1267
|
![]() ![]() ![]()
Junior Member
315 posts Joined: Oct 2015 |
QUOTE(BukitKing222 @ Nov 17 2021, 02:10 PM) I think the design have changed a lot since this planning (Ativo Annexe) years ago. According the the MBPJ draft plans, looks like yes, they're going to spruce up the light industrial, commercial and residential regions in the Sri Damansara are north of Jalan Kuala Selangor/MRR2Why they call this station Sri Damansara Sentral? Will this be the Development focal area in Sri Damansara? |
|
|
Nov 18 2021, 03:48 PM
|
![]() ![]() ![]()
Junior Member
352 posts Joined: Mar 2018 |
^^ Are you from the Developer TAG or a buyer / owner or agent??
|
|
|
Nov 19 2021, 11:32 AM
|
![]() ![]() ![]()
Junior Member
315 posts Joined: Oct 2015 |
QUOTE(BukitKing222 @ Nov 18 2021, 03:48 PM) I thought it was obvious from my activity here. I am looking to make this my home, so naturally I collect more info. Looking forward to the Q1 2022 VP, they've been quite forthcoming with some information and also complaints before VP |
|
|
Nov 19 2021, 11:34 AM
|
![]() ![]() ![]()
Junior Member
315 posts Joined: Oct 2015 |
QUOTE(when2meets2boy @ Nov 19 2021, 11:32 AM) I thought it was obvious from my activity here. I am looking to make this my home, so naturally I collect more info. Looking forward to the Q1 2022 VP, they've been quite forthcoming with some information and also complaints before VP But also we've observed that they have a 94-96% sold record, but looks like what's remaining are the big units over 1 milllion |
|
|
Nov 19 2021, 02:04 PM
|
![]() ![]() ![]()
Junior Member
352 posts Joined: Mar 2018 |
QUOTE(when2meets2boy @ Nov 19 2021, 11:32 AM) I thought it was obvious from my activity here. I am looking to make this my home, so naturally I collect more info. Looking forward to the Q1 2022 VP, they've been quite forthcoming with some information and also complaints before VP I see I see. Congratz on the purchase. |
|
|
Nov 22 2021, 05:15 PM
|
![]()
Newbie
8 posts Joined: Dec 2017 |
any owner's group??
|
|
|
Nov 22 2021, 09:41 PM
Show posts by this member only | IPv6 | Post
#1273
|
![]()
Newbie
19 posts Joined: Jan 2011 |
|
|
|
|
|
|
Nov 26 2021, 10:06 AM
Show posts by this member only | IPv6 | Post
#1274
|
![]()
Newbie
2 posts Joined: Mar 2008 |
|
|
|
Nov 26 2021, 01:20 PM
Show posts by this member only | IPv6 | Post
#1275
|
![]() ![]() ![]() ![]() ![]()
Senior Member
942 posts Joined: Apr 2013 |
|
|
|
Nov 29 2021, 09:03 PM
Show posts by this member only | IPv6 | Post
#1276
|
![]()
Newbie
2 posts Joined: Mar 2008 |
QUOTE(waiwai79 @ Nov 26 2021, 01:20 PM) Hi, for me was mainly location purpose and the estimated completion timing It's near to my work place, with enough pre-school n primary school for kid, kopitiams that would cater for parents n can be ready early 2022 😅 |
|
|
Dec 13 2021, 12:19 PM
|
![]() ![]()
Junior Member
159 posts Joined: Jul 2012 |
|
|
|
Dec 15 2021, 01:50 PM
Show posts by this member only | IPv6 | Post
#1278
|
![]() ![]() ![]()
Junior Member
315 posts Joined: Oct 2015 |
Win Win Inspiration liked this post
|
|
|
Dec 15 2021, 02:31 PM
|
![]() ![]() ![]() ![]()
Junior Member
540 posts Joined: Sep 2010 |
|
|
|
Dec 15 2021, 11:09 PM
Show posts by this member only | IPv6 | Post
#1280
|
![]() ![]() ![]() ![]() ![]()
Senior Member
942 posts Joined: Apr 2013 |
|
| Change to: | 0.0278sec
0.77
6 queries
GZIP Disabled
Time is now: 12th December 2025 - 07:03 PM |