QUOTE(Zwean @ Aug 13 2020, 02:41 PM)
that 2 new big concrete wall not easy to demolish😅😅😅Mont Kiara Allevia by UEM SUNRISE
Mont Kiara Allevia by UEM SUNRISE
|
|
Aug 13 2020, 04:12 PM
Show posts by this member only | IPv6 | Post
#101
|
![]() ![]() ![]()
Junior Member
379 posts Joined: May 2019 |
QUOTE(Zwean @ Aug 13 2020, 02:41 PM) that 2 new big concrete wall not easy to demolish😅😅😅 orenjuk liked this post
|
|
|
|
|
|
Aug 13 2020, 04:17 PM
Show posts by this member only | IPv6 | Post
#102
|
![]() ![]() ![]()
Junior Member
379 posts Joined: May 2019 |
QUOTE(A.B.D. @ Aug 13 2020, 02:49 PM) Because JK4 is designed for a different purpose compared to JK1 which is more like a local MK road. the road postpone long time ago after the phase 1 done, phase 4 is JK4, now wait phase 2 and 3JK4 is designed to be joined with Jalan Segambut. The Petron @Kg Segambut Tengah (nama glamour Kiara North) is already following the road alignment for a widened Jalan Segambut that will eventually link with JK4. But I'll be very surprised if these roads can be completed and linked in 10 years. PH government push DBKL, now change government again, i think will on hold😅😅😅 because some one politician stay Segambut Dalam😅 |
|
|
Aug 13 2020, 04:24 PM
Show posts by this member only | IPv6 | Post
#103
|
![]() ![]() ![]()
Junior Member
379 posts Joined: May 2019 |
|
|
|
Aug 13 2020, 04:32 PM
Show posts by this member only | IPv6 | Post
#104
|
![]() ![]() ![]()
Junior Member
355 posts Joined: Apr 2010 From: Jalan Ipoh |
|
|
|
Aug 13 2020, 09:31 PM
|
![]() ![]()
Junior Member
102 posts Joined: Jul 2020 |
|
|
|
Aug 13 2020, 10:00 PM
|
![]() ![]() ![]()
Junior Member
379 posts Joined: May 2019 |
QUOTE(Cincailah @ Aug 13 2020, 09:31 PM) Can find in mk project thread. Everyone claim mrt nearby. Unless the underground mrt is big enough for all the exit. 😅 1MK area many flying bridge there, i think is very hard to build a top station, for mk solaries, dutamas(beautiful naza ttdi project) i think this whole area will be underground😅😅😅 hope so |
|
|
|
|
|
Aug 13 2020, 10:01 PM
|
![]() ![]() ![]()
Junior Member
379 posts Joined: May 2019 |
|
|
|
Aug 13 2020, 10:21 PM
Show posts by this member only | IPv6 | Post
#108
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,269 posts Joined: Dec 2019 |
|
|
|
Aug 13 2020, 10:25 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,296 posts Joined: Nov 2019 |
|
|
|
Aug 14 2020, 12:01 PM
|
![]() ![]() ![]()
Junior Member
379 posts Joined: May 2019 |
|
|
|
Aug 17 2020, 05:57 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,470 posts Joined: Oct 2010 |
|
|
|
Aug 17 2020, 09:56 AM
|
![]() ![]()
Junior Member
282 posts Joined: Jul 2011 |
QUOTE(BigMan123 @ Aug 17 2020, 05:57 AM) Looks pretty much dead. This article appeared in the news recently in May 2020. Its likely One Kiara. However, SA trying to sell Sunway Mont/Astra will tell you that project is "reviving and booming" soon. https://www.thestar.com.my/metro/metro-news...d-building-site ![]() KUALA Lumpur City Hall (DBKL) has moved in to check a health hazard in the form of an abandoned construction site that surrounding residents fear may be breeding ground for Aedes mosquitoes. Upon receiving complaints from Mont Kiara Residents Association (MKReA), the local authority carried out fogging and larviciding at the premises on May 5. However, the residents’ fears are not allayed. As such, DBKL sent a team of 10 personnel from its Health and Environment Department to inspect the site again recently. MKReA secretary Shereen Abdullah said the project in Jalan Kiara 3 was abandoned in the middle of construction about 10 years ago. “DBKL’s report stated that 100 possible mosquito-breeding spots were found inside the construction site and another 50 were found outside of it. “The officers informed us that they are dispatching more manpower to the site to conduct larviciding and fogging once a week. “Some guppies were also released into areas with stagnant water to kill the mosquito larvae, ” she added. DBKL Health and Environment Department director Dr Noor Akma Shabudin said the premises in Mont Kiara was one of 19 sites issued with a notice this year under Section 82 to clean up. “To-date, 59 construction sites were checked, of which 11 had been given stop-work order after we found multiple mosquito-breeding grounds.”A total of 77 compounds were issued for offences under the Destruction of Disease-Bearing Insects Act 1975 (Act 154), ” she said. This post has been edited by jlim2004: Aug 17 2020, 09:56 AM |
|
|
Aug 17 2020, 02:11 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,470 posts Joined: Oct 2010 |
Such a waste.....bet kiara 9 must be cursing for the mozzies and eye sore.
|
|
|
|
|
|
Aug 18 2020, 01:47 PM
|
![]() ![]() ![]()
Junior Member
379 posts Joined: May 2019 |
i saw the part on Jalan Kiara 3 side have progress now, but feel the part on Jalan Kiara 5 no progress, right? or my eye problem🤣
|
|
|
Aug 18 2020, 04:56 PM
Show posts by this member only | IPv6 | Post
#115
|
![]() ![]()
Junior Member
111 posts Joined: Jul 2020 |
|
|
|
Aug 18 2020, 05:33 PM
Show posts by this member only | IPv6 | Post
#116
|
![]() ![]() ![]()
Junior Member
379 posts Joined: May 2019 |
|
|
|
Aug 18 2020, 05:35 PM
Show posts by this member only | IPv6 | Post
#117
|
![]() ![]() ![]()
Junior Member
379 posts Joined: May 2019 |
JK7 have a big landed area, google update the map already😅
Allevia is between JK3 & JK4 |
|
|
Aug 18 2020, 05:56 PM
Show posts by this member only | IPv6 | Post
#118
|
![]() ![]()
Junior Member
111 posts Joined: Jul 2020 |
|
|
|
Aug 18 2020, 10:50 PM
|
![]() ![]() ![]()
Junior Member
379 posts Joined: May 2019 |
|
|
|
Aug 18 2020, 10:51 PM
|
![]() ![]() ![]()
Junior Member
379 posts Joined: May 2019 |
|
| Change to: | 0.0315sec
0.99
6 queries
GZIP Disabled
Time is now: 14th December 2025 - 09:54 AM |