Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed
11 Pages < 1 2 3 4 5 > » Bottom

Outline · [ Standard ] · Linear+

 Oil & Gas Careers V12 - Upstream & Downstream, Market still slump, slow, snail pace...

views
     
abgkik
post Mar 7 2019, 04:31 PM

Look at all my stars!!
*******
Senior Member
2,142 posts

Joined: Mar 2011
QUOTE(meonkutu11 @ Mar 7 2019, 03:25 PM)
Heard MISC doing a major restructuring and have a lot of empty spot to be filled. One of friend just join them from class.
*
MISC has requested so many resumes for the FPSO project.
.
But i’m not very sure for Limbayung or Vietnam FSO..
.
But salary always lower than other floater company in Malaysia..
.
And their organization chart is pretty big 😊
abgkik
post Mar 7 2019, 04:35 PM

Look at all my stars!!
*******
Senior Member
2,142 posts

Joined: Mar 2011
Ok.. Now is time to submit your CV to Technip FMC.
.
Last year they did FEED for BP.. and now they been awarded with EPCIC FPSO Project..

https://mobile.offshoreenergytoday.com/bp-h...hmeyim-project/

From my knowledge, Technip never done EPCIC of FPSO accept for FEED, module, SURF and engineering.
.
Did I missed any of their FPSO project? šŸ¤”

This post has been edited by abgkik: Mar 7 2019, 04:39 PM
abgkik
post Mar 8 2019, 03:16 AM

Look at all my stars!!
*******
Senior Member
2,142 posts

Joined: Mar 2011
QUOTE(Charyl07 @ Mar 7 2019, 09:58 PM)
Wondering, is it a trend nowadays OnG company hiring people on a contract basis only?
*
Normal.. For project..

This post has been edited by abgkik: Mar 8 2019, 03:17 AM
abgkik
post Mar 9 2019, 02:19 PM

Look at all my stars!!
*******
Senior Member
2,142 posts

Joined: Mar 2011
QUOTE(mohdyakup @ Mar 9 2019, 02:26 AM)
Hess WHP North Malay Basin Phase 3 tender is out...
*
Their CPP is good and FSO Mekar Bergading still have a lot of space to accommodate the condensate.. smile.gif

This post has been edited by abgkik: Mar 9 2019, 02:33 PM
abgkik
post Mar 9 2019, 02:32 PM

Look at all my stars!!
*******
Senior Member
2,142 posts

Joined: Mar 2011
QUOTE(contestchris @ Mar 9 2019, 07:03 AM)
Can Technip fabricate the FPSO on their own, or likely get someone else like their local partner MMHE to do it?
*
I have checked Technip FMC project, currently there is 1 FPSO project ongoing under them at Sembcorp. Karish and Tanin field Israel..
.
Not sure if there is any EPCIC FPSO contractor own the shipyard, but normal for them to award the fabrication/conversion to shipyard that can deliver the best for them.
abgkik
post Mar 11 2019, 09:20 PM

Look at all my stars!!
*******
Senior Member
2,142 posts

Joined: Mar 2011
QUOTE(ZZMsia @ Mar 11 2019, 07:51 PM)
FPSO part by Technip FMC..
.
And SURF part by Mc Dermott..

šŸ˜
abgkik
post Mar 13 2019, 03:00 PM

Look at all my stars!!
*******
Senior Member
2,142 posts

Joined: Mar 2011
QUOTE(Stamp @ Mar 13 2019, 07:54 AM)
will they hire locals?

it seems to me that they are finding excuses not to hire locals so that they can hire the boat people. someone should check how they managed to get work permits from the immigration dpt for the current boat people in their organisation.

now the HR minister is of the same group of people ............  hmm.gif
*
Ha ha.. you also realized that ya..
.
If based on their organization, mostly, they only hire local for lower position..
abgkik
post Mar 13 2019, 07:18 PM

Look at all my stars!!
*******
Senior Member
2,142 posts

Joined: Mar 2011
QUOTE(Stamp @ Mar 13 2019, 03:36 PM)
its like a plague hitting a few of the oil&gas consultant firms; even that oslo based consultant is swarmed with the boat people. i wonder what happened to the local engineers.
*
In Malaysia they still skeptical that Expat will do better works than local..
.
However, its proven that Local can deliver the similar or better quality.. MISC FPSOs, MTC FSO Project and EAT FSO Project are projects that successfully delivered by local. flex.gif
.
The boat people will prefer their friends in the team, quality of works come in 2nd..
.
Below is good article about Corporate Bullshitter (CB) that happen in the industry:

https://www.linkedin.com/pulse/how-bullshit...til-atul-mathur

This post has been edited by abgkik: Mar 13 2019, 07:28 PM
abgkik
post Mar 19 2019, 02:49 PM

Look at all my stars!!
*******
Senior Member
2,142 posts

Joined: Mar 2011
QUOTE(Stamp @ Mar 19 2019, 07:56 AM)
I wonder what kind of valves and how many valves they were talking about that worth RM125mil?

Is this suit about the performance of the valves?
*
I have been experienced that the production platform were using 'Imitation' valve.. never come across in my mind that vendor able to imitate well known valve like petaling street selling imitate Rolex watch.
.
Just imagine if there are 4 wellheads line and maybe only 1 line was not using that valve, so loss of production perday may be around USD 1million ++.
.
Also, additional cost to purchase and replace the valve. Valve also take time to be available.
.
But I really wonder how this supplier never worry to supply imitation valve. hmm.gif

This post has been edited by abgkik: Mar 19 2019, 02:50 PM
abgkik
post Mar 20 2019, 07:07 PM

Look at all my stars!!
*******
Senior Member
2,142 posts

Joined: Mar 2011
QUOTE(gulagulahacks @ Mar 20 2019, 04:54 PM)
Limbayong MISC got?
*
Not yet. The bidding due date till next month I believe. šŸ¤”
abgkik
post Mar 21 2019, 11:49 AM

Look at all my stars!!
*******
Senior Member
2,142 posts

Joined: Mar 2011
QUOTE(meonkutu11 @ Mar 21 2019, 01:40 AM)
Besides cost saving factor, what other causes that company (e.g. epcic, drilling, fpso, etc) hired ā€œboat peopleā€ for upper level position?

- local not qualified? - which I dont think so
- local doesn’t want to take responsibility?
- high responsibility vs salary package not attractive?
- no push from client to increase/prioritise local content (in contract and execution)?
- client doesn’t have confidence in local talent/capabilities?
*
It’s about group/networking of friends, qualification & experience come in 2nd šŸ˜
.
Once you have one of them in senior management, for sure suddenly the organization will full of them.
.
I have experienced one organization collapse because of them.

This post has been edited by abgkik: Mar 21 2019, 12:39 PM
abgkik
post Mar 21 2019, 05:33 PM

Look at all my stars!!
*******
Senior Member
2,142 posts

Joined: Mar 2011
QUOTE(gulagulahacks @ Mar 21 2019, 02:24 PM)
Heard rumors MISC will partner with Yinson.

Sharporjee with MTC and FIP with M3nerhy
*
MISC & Yinson? šŸ¤”
abgkik
post Mar 21 2019, 05:35 PM

Look at all my stars!!
*******
Senior Member
2,142 posts

Joined: Mar 2011
QUOTE(Stamp @ Mar 21 2019, 03:53 PM)
the bidding due date already passed.

now bidders are waiting for the bid winner announcement.
*
I believe it TC session now..
.
Not yet finalized yet..
abgkik
post Mar 23 2019, 09:53 PM

Look at all my stars!!
*******
Senior Member
2,142 posts

Joined: Mar 2011
Double post

This post has been edited by abgkik: Mar 23 2019, 09:54 PM
abgkik
post Mar 23 2019, 09:54 PM

Look at all my stars!!
*******
Senior Member
2,142 posts

Joined: Mar 2011
QUOTE(jimbet1337 @ Mar 22 2019, 12:54 PM)
SBM Offshore is hiring? For which project eh?
*
Mero 2 FPSO is coming.. 😊

https://brazilenergyinsight.com/2019/03/22/...azilian-market/

abgkik
post May 12 2019, 12:24 PM

Look at all my stars!!
*******
Senior Member
2,142 posts

Joined: Mar 2011
QUOTE(ZZMsia @ May 8 2019, 01:58 AM)
Most of their project team kena buang
They had skeleton staff and now will embark in hiring again.

The Indian company is involved in epcc only or operations also?
*
Just consider this project direction is by SP Oil & Gas. So operation also will be under SP Oil & Gas to cover.

They already set up the engineering team. Just a few position left to be filled up. 😊
abgkik
post May 12 2019, 12:25 PM

Look at all my stars!!
*******
Senior Member
2,142 posts

Joined: Mar 2011
QUOTE(Kabelan @ Apr 30 2019, 07:35 PM)
MTC?
Fabricate in which yard?
*
MMHE.. 😊
abgkik
post Jun 14 2019, 05:16 PM

Look at all my stars!!
*******
Senior Member
2,142 posts

Joined: Mar 2011
anyone have experienced with Cubik assessment for any position in oil & gas?

https://www.cubiks.com/

The assessment is 1st step of screening after your CV been listed.

I have never experienced that. Takutlah... sweat.gif

This post has been edited by abgkik: Jun 14 2019, 05:40 PM
abgkik
post Jun 15 2019, 07:24 PM

Look at all my stars!!
*******
Senior Member
2,142 posts

Joined: Mar 2011
QUOTE(blizice @ Jun 15 2019, 08:23 AM)
Sound like interview for P......
*
this not interview yet.. screening.. 50 Questions to be answered in 12 minutes.. sweat.gif


on other matters:

Anyone here been hired bt Mc Dermott? Seem like they are hiring..

many positions available..
abgkik
post Jun 15 2019, 07:42 PM

Look at all my stars!!
*******
Senior Member
2,142 posts

Joined: Mar 2011
QUOTE(mhyug @ Jun 15 2019, 07:35 PM)
fu mcm exam. mind sharing. mana tau nak cuba apply petronas jugak ni.
*
not Petronas.. smile.gif

I will share about the test with all of you later..

However, I have been advised to study and practice test through the simulation to ensure the best result..

Basically need to answer 1 question in 14.4 seconds.. have 50 Questions..

11 Pages < 1 2 3 4 5 > » Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.1245sec    0.26    7 queries    GZIP Disabled
Time is now: 6th December 2025 - 03:05 AM