Oil & Gas Careers V12 - Upstream & Downstream, Market still slump, slow, snail pace...
|
Stamp
|
May 22 2019, 08:40 PM
|
|
QUOTE(ZZMsia @ May 22 2019, 11:35 AM) Correct Assuming the current design is completed by end of this year..the project will be in 2020.... What is more important is short term (2019) for small local vendors.. Current FEED planned completion 2Q 2020. Consider 6 month bidding process for EPCI, most likely award end 4Q2020, and construction starts in 3Q 2021. That if the project isn’t hijacked by Sarawakian politicians.
|
|
|
|
|
|
Stamp
|
May 25 2019, 05:43 AM
|
|
QUOTE(Kabelan @ May 25 2019, 01:12 AM) Limbayong are FPSO vessel only or Topside and jacket together? If topside and jacket? Which yard get that job? Limbayong is FPSO, not fixed platforms since its in deep water depth location. Bidding is in progress, planned award in Sept 2019. Local content requirement in this project is high; only local fabricators for the topsides fabrication. This post has been edited by Stamp: May 25 2019, 05:44 AM
|
|
|
|
|
|
Stamp
|
May 25 2019, 01:13 PM
|
|
QUOTE(mohdyakup @ May 24 2019, 11:27 PM) Rosemary-Marjoram wont be fly that soon. Trust me. Its gonna be delayed like Kasawari. The initial field development concept studies can be carried out till FEED without “out side” interferences. The challenge starts at approval stages till FID. Kasawari case is rare since the project has been sanctioned and it’s FID cleared, but “political interference” is the current stumbling block for the final stage of development ie EPC. It’s an open secret that MMHE and Technip folks are pulling their hairs with extreme frustration because of the award delay of Kasawari EPC. This post has been edited by Stamp: May 25 2019, 01:16 PM
|
|
|
|
|
|
Stamp
|
May 25 2019, 01:17 PM
|
|
QUOTE(blizice @ May 25 2019, 07:03 AM) Due to state vs federal spat? Indeed.
|
|
|
|
|
|
Stamp
|
May 25 2019, 01:21 PM
|
|
QUOTE(Ravin786 @ May 25 2019, 05:59 AM) Any idea how the bid evaluation going on? Any feedback from contacts? Heard it may go back to the drawing board - a re-bid with revised scope, but my source where I got the info may not be reliable 🙄 Going by the norm “No news means good news”, I guess that the bid evaluations are going smooth.
|
|
|
|
|
|
Stamp
|
May 25 2019, 01:40 PM
|
|
QUOTE(blizice @ May 25 2019, 07:03 AM) Rumors there is a Gas Plant upcoming in Sabah. But close to no detail available online. Anyone have info on this? Or just unfounded rumors Yes, there’s task force looking at putting in a new LNG plant in Sabah. Sipitang is one of the locations being considered for the new plant. Brace for more news on this new plant maybe next year. This post has been edited by Stamp: May 25 2019, 01:41 PM
|
|
|
|
|
|
Stamp
|
May 26 2019, 10:48 AM
|
|
QUOTE(blizice @ May 25 2019, 09:27 PM) Guess this is the painful lesson learnt from SSGP project Hope they learnt the lessons.
|
|
|
|
|
|
Stamp
|
Jun 1 2019, 06:29 PM
|
|
QUOTE(ZZMsia @ Jun 1 2019, 04:08 PM) It seems McDermott is busy finding for designers through Airswift. My batch mate forwarded it. Fpso experience is a plus. Which Fpso they are doing?? Exxon Liza 2 and Petrobras Mero 2.
|
|
|
|
|
|
Stamp
|
Jun 2 2019, 01:17 PM
|
|
QUOTE(ZZMsia @ Jun 2 2019, 04:41 AM) No that's sbm. I'm telling McDermott.. They got a big job from Aramco recently, 1 floatover CPP and 4 or 5 wellhead fixed platforms. Not sure about their prospects on FPSO bids.
|
|
|
|
|
|
Stamp
|
Jun 3 2019, 11:28 AM
|
|
QUOTE(ZZMsia @ Jun 2 2019, 01:56 PM) Oh wow. No wonder they are hiring like mad... Must be some floating structure they have now. Wondering which one? Definitely not for Malaysian waters. There’s an introducer incentive fee of USD1000 for every person hired!
|
|
|
|
|
|
Stamp
|
Jun 11 2019, 02:02 PM
|
|
QUOTE(jimbet1337 @ Jun 11 2019, 01:44 PM) SBM is still actively hiring for Mero 2? probably hiring to prepare for the Mero 3 bid, which is coming in July.
|
|
|
|
|
|
Stamp
|
Jun 11 2019, 02:22 PM
|
|
QUOTE(Kabelan @ Jun 10 2019, 10:09 AM) pls paste the article here. its subscription based.
|
|
|
|
|
|
Stamp
|
Jun 13 2019, 08:50 PM
|
|
MMHE is hiring BIG! Looks like Kasawari project is starting soon! This post has been edited by Stamp: Jun 13 2019, 08:52 PM
|
|
|
|
|
|
Stamp
|
Jun 16 2019, 07:50 PM
|
|
QUOTE(wywy2020 @ Jun 16 2019, 12:43 AM) Technip hiring now, anyone know for which project. Permanent or contract? Most likely the long delayed and much anticipated Kasawari EPIC project. The CPP will be the heaviest float over platform in Malaysia!
|
|
|
|
|
|
Stamp
|
Jun 17 2019, 08:32 PM
|
|
QUOTE(blizice @ Jun 17 2019, 10:20 AM) Where you saw the technip recruitment advertisement? You need to ask wywy2020.
|
|
|
|
|
|
Stamp
|
Jun 17 2019, 08:34 PM
|
|
QUOTE(contestchris @ Jun 17 2019, 10:13 AM) So Kasawari is a go? Is there any other "major" project besides that in the offing? Kasawari has always been a “go” project. Only external factors hindered its final execution.
|
|
|
|
|
|
Stamp
|
Jun 18 2019, 04:01 AM
|
|
Petrobras Mero 3 will be out for bid! This post has been edited by Stamp: Jun 18 2019, 08:08 AM Attached File(s)
Brazil_Petrobras_lines_up_Mero_3_FPSO_tender_13062019.pdf ( 150k )
Number of downloads: 64
|
|
|
|
|
|
Stamp
|
Jun 18 2019, 01:52 PM
|
|
Limbayong technical bid evaluation is on going.
|
|
|
|
|
|
Stamp
|
Jun 22 2019, 10:59 AM
|
|
QUOTE(contestchris @ Jun 21 2019, 07:24 PM) Any idea why happens to K5? What about Kelidang in Brunei? What's the status? More FEED studies are currently being carried out for Kelidang.
|
|
|
|
|
|
Stamp
|
Jun 24 2019, 10:05 AM
|
|
QUOTE(DuFfz @ Jun 24 2019, 09:17 AM) Anyone heard of boskalis? Dredging and maritime company. I think this Dutch based company has an office in Msia. https://boskalis.com/contact.html#view/gridThis post has been edited by Stamp: Jun 24 2019, 10:08 AM
|
|
|
|
|