Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed
318 Pages « < 9 10 11 12 13 > » Bottom

Outline · [ Standard ] · Linear+

 Oil & Gas Careers V12 - Upstream & Downstream, Market still slump, slow, snail pace...

views
     
adibyusoff
post Aug 25 2017, 02:56 PM

work smart, play hard.
*****
Senior Member
787 posts

Joined: Aug 2009
From: Kuala Lumpur, Malaysia



QUOTE(meonkutu11 @ Aug 24 2017, 11:41 PM)
Lundin Malaysia continues technical evaluation for jackup

MALAYSIA: Lundin's jackup tender for drilling from the Bertam platform remains at the technical clarification and evaluation stage.
Lundin is looking for a rig to undertake a scope with a commencement window of between 15 September and 15 October 2017. The operator plans to drill up to two development wells over an estimated duration of three months. The platform has a height of 41 m (135 ft) above MSL in water depths of 76 m (250 ft). Leg penetration of 14 m (45 ft) and up to 21 m (70 ft) in higher penetration areas is anticipated. The rig should have a 3,000 HP drawworks and a cantilever envelope of a minimum 21 m by 4 m (70 ft by 12 ft); three mud pumps; and a minimum of three cranes with a 20 tonne lifting capacity, among other things.
23-Aug-2017
Repsol Malaysia's contract value for UMW Naga 5 is USD 26.4 million

MALAYSIA: Further to an IHS Markit Petrodata report on 14 August 2017, Repsol Oil & Gas Malaysia's contract with UMW Offshore Drilling for jackup UMW Naga 5 has a contract value of RM 113 million (USD 26.4 million).
The award is for one year plus a one-year option programme, commencing by mid-September 2017. UMW Naga 5 is currently at Kemaman Supply Base in Terengganu, undergoing contract preparation work.
22-Aug-2017
Hess Malaysia spells out specifications for HPHT jackup

MALAYSIA: Hess Malaysia will accept rigs which have had a major refurbishment within the last 10 years or newbuilds for its HPHT (high-pressure high-temperature) drilling campaign in the Malay Basin, offshore Peninsular Malaysia.
The unit should also not have any anticipated docking schedule during the contract term. In addition, Hess requests a rig with usable leg below hull of 410 ft (125 m), 3,000 hp drawworks, three cranes, cantilever envelope of 15 by 60 ft (4.6 by 18.3 m), topdrive, three mud pumps plus accommodation for 150 people, amongst other factors. The contractor should also have HPHT working experience. The contract will cover a primary term of two years, commencing in the window between 1 April and 30 June, 2018. The work scope will consist of two parts separated by a break of around three months. Part 1 will cover three deep wells. Part 2 will start after the break and will cover two separate campaigns of four and five wells each. Water depths in the area range between 60-70 m (196-230 ft).
22-Aug-2017

COSLSeeker to depart for PNG shortly

MALAYSIA/PAPUA NEW GUINEA: COSL has finally announced it has signed a contract for the provision of jackup COSLSeeker to Twinza Oil to drill one well offshore Papua New Guinea (PNG).
The rig is preparing for the charter in Labuan, Malaysia, and is expected to commence mobilisation to PNG by the end of August. COSLSeeker last undertook a short campaign offshore Indonesia with Natuna Exploration Limited on the Duyung PSC in the Natuna Sea.
22-Aug-2017

Noble marketing Noble Bully II for work during standby period

MALAYSIA: Even as drillship Noble Bully II is on a prolonged one-year standby offshore Malaysia, Noble continues to market the rig for possible contracts to supplement the day rate during this idle period.
The ultra-deepwater rig is currently being warm-stacked at Labuan at a cost of USD 40,000 a day. Under an agreement between Noble and Shell, which has chartered the unit until around April 2022, the rig may be stacked for up to 365 days until around April 2018.
21-Aug-2017

Carigali Hess refreshes market survey for jackup

MALAYISA/THAILAND: Carigali Hess has issued a new market survey for a jackup to undertake a drilling campaign on Block A-18 in the Gulf of Thailand JDA.
In March, the operator issued a similar market survey enquiring into the availability of a minimum 106 m/350 ft-rated unit for a potential charter of two years plus a one-year option. Commencement is scheduled for between June and August 2018. Carigali Hess prefers a rig with a similar footprint to that of the last unit it chartered, but is open to other rig designs. Responses are due on 23 August 2017.
16-Aug-2017

JDC confirms Hakuryu-11 charter with Sapura Energy

MALAYSIA: Japan Drilling (JDC) has secured a charter for jackup Hakuryu-11 with Sapura Exploration and Production, for six wells plus one option-well offshore Malaysia for an undisclosed day rate.
The charter, which was awarded to JDC via Malaysian firm Petronnic Sdn Bhd, is set to commence in August 2017 and will cover work offshore Peninsular Malaysia and East Malaysia. Sapura Energy has been looking for a long-legged jackup to undertake a 160-day campaign comprising six workovers/sidetracks with a total duration estimated at 95 days and two exploration wells with combined duration of 60 days, inclusive of mobilisation and demobilisation. Hakuryu-11 has been idle in Malaysia since June 2016 after it finished work with Idemitsu offshore Vietnam.
16-Aug-2017

ConocoPhillips' jackup tender for Malaysia closes

MALAYSIA: ConocoPhillips' tender for a 121 m/400 ft-rated jackup to work offshore Sarawak closed as scheduled in late July.
The exercise was open only to Malaysian rigs, so it is understood only two contractors - UMW and Perisai - are able to take part. The selected rig will be deployed to work on Blocks WL 4-00 and SK 313, in water depths averaging between 100-120 m (328-393 ft). The work scope covers two exploration/appraisal wells with each having a duration of between 25 and 40 days, including rig mobilisation time and testing, plus two option wells. The entire campaign is anticipated to last between two and three months, with commencement scheduled for second quarter 2018.
15-Aug-2017

Repsol Malaysia awards LOA to PV Drilling III

MALAYSIA: Repsol Malaysia has issued a Letter of Award (LOA) to PV Drilling for jackup PV Drilling III for a one year plus one-year option programme.
Commencement date is March 2018. This is the result of a two-jackup tender covering separate campaigns offshore Sabah and Peninsular Malaysia respectively. Rig 1, which has yet to be announced, is for the Kinabalu Oil block PSC offshore Sabah and was open only to Malaysian rig contractors. Rig 2, PV Drilling III, covers work on the Bunga Pakma field on CAA PM3 in waters between Vietnam and Peninsular Malaysia. PV Drilling III is currently finishing a two-well campaign with Thang Long JOC in Vietnam, then it is understood to be considered for a follow-on campaign in Vietnam, before mobilising to Malaysia in late third quarter 2017.
08-Aug-2017
*
THANK YOU SIR!!!!! thumbsup.gif thumbsup.gif thumbsup.gif
jianh
post Aug 25 2017, 03:36 PM

What custom title???
*****
Senior Member
920 posts

Joined: Jun 2007


QUOTE(BrendonStar @ Aug 25 2017, 02:21 PM)
Well they were looking for directors and board members and today the selected ones were announced. You miss your chance by a few months, better luck next time  smile.gif
*
aww dang it!
omg528
post Aug 25 2017, 03:39 PM

Enthusiast
*****
Senior Member
739 posts

Joined: Jan 2009
guys, check with you all...
i'm planning to venture in oil n gas industry by providing epoxy polymeric solution to all the main players...any idea whether is it still workable?
adibyusoff
post Aug 25 2017, 05:27 PM

work smart, play hard.
*****
Senior Member
787 posts

Joined: Aug 2009
From: Kuala Lumpur, Malaysia



Attached Image
mhyug
post Aug 25 2017, 07:10 PM

Regular
******
Senior Member
1,551 posts

Joined: May 2009
QUOTE(meonkutu11 @ Aug 24 2017, 11:41 PM)
Lundin Malaysia continues technical evaluation for jackup

MALAYSIA: Lundin's jackup tender for drilling from the Bertam platform remains at the technical clarification and evaluation stage.
Lundin is looking for a rig to undertake a scope with a commencement window of between 15 September and 15 October 2017. The operator plans to drill up to two development wells over an estimated duration of three months. The platform has a height of 41 m (135 ft) above MSL in water depths of 76 m (250 ft). Leg penetration of 14 m (45 ft) and up to 21 m (70 ft) in higher penetration areas is anticipated. The rig should have a 3,000 HP drawworks and a cantilever envelope of a minimum 21 m by 4 m (70 ft by 12 ft); three mud pumps; and a minimum of three cranes with a 20 tonne lifting capacity, among other things.
23-Aug-2017
Repsol Malaysia's contract value for UMW Naga 5 is USD 26.4 million

MALAYSIA: Further to an IHS Markit Petrodata report on 14 August 2017, Repsol Oil & Gas Malaysia's contract with UMW Offshore Drilling for jackup UMW Naga 5 has a contract value of RM 113 million (USD 26.4 million).
The award is for one year plus a one-year option programme, commencing by mid-September 2017. UMW Naga 5 is currently at Kemaman Supply Base in Terengganu, undergoing contract preparation work.
22-Aug-2017
Hess Malaysia spells out specifications for HPHT jackup

MALAYSIA: Hess Malaysia will accept rigs which have had a major refurbishment within the last 10 years or newbuilds for its HPHT (high-pressure high-temperature) drilling campaign in the Malay Basin, offshore Peninsular Malaysia.
The unit should also not have any anticipated docking schedule during the contract term. In addition, Hess requests a rig with usable leg below hull of 410 ft (125 m), 3,000 hp drawworks, three cranes, cantilever envelope of 15 by 60 ft (4.6 by 18.3 m), topdrive, three mud pumps plus accommodation for 150 people, amongst other factors. The contractor should also have HPHT working experience. The contract will cover a primary term of two years, commencing in the window between 1 April and 30 June, 2018. The work scope will consist of two parts separated by a break of around three months. Part 1 will cover three deep wells. Part 2 will start after the break and will cover two separate campaigns of four and five wells each. Water depths in the area range between 60-70 m (196-230 ft).
22-Aug-2017

COSLSeeker to depart for PNG shortly

MALAYSIA/PAPUA NEW GUINEA: COSL has finally announced it has signed a contract for the provision of jackup COSLSeeker to Twinza Oil to drill one well offshore Papua New Guinea (PNG).
The rig is preparing for the charter in Labuan, Malaysia, and is expected to commence mobilisation to PNG by the end of August. COSLSeeker last undertook a short campaign offshore Indonesia with Natuna Exploration Limited on the Duyung PSC in the Natuna Sea.
22-Aug-2017

Noble marketing Noble Bully II for work during standby period

MALAYSIA: Even as drillship Noble Bully II is on a prolonged one-year standby offshore Malaysia, Noble continues to market the rig for possible contracts to supplement the day rate during this idle period.
The ultra-deepwater rig is currently being warm-stacked at Labuan at a cost of USD 40,000 a day. Under an agreement between Noble and Shell, which has chartered the unit until around April 2022, the rig may be stacked for up to 365 days until around April 2018.
21-Aug-2017

Carigali Hess refreshes market survey for jackup

MALAYISA/THAILAND: Carigali Hess has issued a new market survey for a jackup to undertake a drilling campaign on Block A-18 in the Gulf of Thailand JDA.
In March, the operator issued a similar market survey enquiring into the availability of a minimum 106 m/350 ft-rated unit for a potential charter of two years plus a one-year option. Commencement is scheduled for between June and August 2018. Carigali Hess prefers a rig with a similar footprint to that of the last unit it chartered, but is open to other rig designs. Responses are due on 23 August 2017.
16-Aug-2017

JDC confirms Hakuryu-11 charter with Sapura Energy

MALAYSIA: Japan Drilling (JDC) has secured a charter for jackup Hakuryu-11 with Sapura Exploration and Production, for six wells plus one option-well offshore Malaysia for an undisclosed day rate.
The charter, which was awarded to JDC via Malaysian firm Petronnic Sdn Bhd, is set to commence in August 2017 and will cover work offshore Peninsular Malaysia and East Malaysia. Sapura Energy has been looking for a long-legged jackup to undertake a 160-day campaign comprising six workovers/sidetracks with a total duration estimated at 95 days and two exploration wells with combined duration of 60 days, inclusive of mobilisation and demobilisation. Hakuryu-11 has been idle in Malaysia since June 2016 after it finished work with Idemitsu offshore Vietnam.
16-Aug-2017

ConocoPhillips' jackup tender for Malaysia closes

MALAYSIA: ConocoPhillips' tender for a 121 m/400 ft-rated jackup to work offshore Sarawak closed as scheduled in late July.
The exercise was open only to Malaysian rigs, so it is understood only two contractors - UMW and Perisai - are able to take part. The selected rig will be deployed to work on Blocks WL 4-00 and SK 313, in water depths averaging between 100-120 m (328-393 ft). The work scope covers two exploration/appraisal wells with each having a duration of between 25 and 40 days, including rig mobilisation time and testing, plus two option wells. The entire campaign is anticipated to last between two and three months, with commencement scheduled for second quarter 2018.
15-Aug-2017

Repsol Malaysia awards LOA to PV Drilling III

MALAYSIA: Repsol Malaysia has issued a Letter of Award (LOA) to PV Drilling for jackup PV Drilling III for a one year plus one-year option programme.
Commencement date is March 2018. This is the result of a two-jackup tender covering separate campaigns offshore Sabah and Peninsular Malaysia respectively. Rig 1, which has yet to be announced, is for the Kinabalu Oil block PSC offshore Sabah and was open only to Malaysian rig contractors. Rig 2, PV Drilling III, covers work on the Bunga Pakma field on CAA PM3 in waters between Vietnam and Peninsular Malaysia. PV Drilling III is currently finishing a two-well campaign with Thang Long JOC in Vietnam, then it is understood to be considered for a follow-on campaign in Vietnam, before mobilising to Malaysia in late third quarter 2017.
08-Aug-2017
*
hoho that hakuryu11 very nice rig. kudos to the japs and their neat and cleanliness culture. cosl seeker also looks good. both rig was warm stacked at labuan and was there doing the surveys for the persaid projects.

so hess on the prowl again i see. does this mean the relationship with naga8 tp come to an end? didn't know they had more HPHT wells to do. last i heard only 1 additional firm well(3 already drilled) at their current CPP Bergading location.
feekle
post Aug 25 2017, 09:24 PM

Bibo ergo sum!
******
Senior Member
1,922 posts

Joined: Apr 2009
From: Constellation Cygnus
Seems like pengerang every month got incident..few days ago a scaffolder fell to his death.
langstrasse
post Aug 25 2017, 10:29 PM

~ Have a Vice day ~
******
Senior Member
1,588 posts

Joined: Oct 2010
Seems like most upcoming new developments are in East Malaysia.

I guess Peninsula folks will just have to look and admire sad.gif
TT22
post Aug 26 2017, 06:02 AM

Getting Started
**
Junior Member
182 posts

Joined: Aug 2017


QUOTE(langstrasse @ Aug 25 2017, 10:29 PM)
Seems like most upcoming new developments are in East Malaysia.

I guess Peninsula folks will just have to look and admire  sad.gif
*
Petros...
meonkutu11
post Aug 26 2017, 08:28 AM

Regular
******
Senior Member
1,597 posts

Joined: Apr 2009


Total acquires Maersk Oil for $7.45 billion
Stock-and-debt deal sees French giant gain assets in the Americas, Africa and Middle East and replace Shell as northwest Europe's second largest operator
FRENCH supermajor Total is boosting reserves and production with a $7.45 billion acquisition of Denmark’s largest oil and gas player Maersk Oil.

The stock-and-debt deal will give Total additional proven and probable reserves and contingent resources of 1 billion barrels of oil equivalent and 160,000 boe in 2018 production, and assets in Denmark, the UK, Norway, the US Gulf of Mexico, Algeria, Kazakhstan, Iraqi Kurdistan, Angola, Kenya and Brazil.

This post has been edited by meonkutu11: Aug 26 2017, 08:29 AM
meonkutu11
post Aug 26 2017, 08:33 AM

Regular
******
Senior Member
1,597 posts

Joined: Apr 2009


More money to gomen..

http://www.rigzone.com/news/oil_gas/a/1515...Surges/?all=HG2

adibyusoff
post Aug 26 2017, 10:44 AM

work smart, play hard.
*****
Senior Member
787 posts

Joined: Aug 2009
From: Kuala Lumpur, Malaysia



QUOTE(meonkutu11 @ Aug 26 2017, 08:28 AM)
Total acquires Maersk Oil for $7.45 billion
Stock-and-debt deal sees French giant gain assets in the Americas, Africa and Middle East and replace Shell as northwest Europe's second largest operator
FRENCH supermajor Total is boosting reserves and production with a $7.45 billion acquisition of Denmark’s largest oil and gas player Maersk Oil.

The stock-and-debt deal will give Total additional proven and probable reserves and contingent resources of 1 billion barrels of oil equivalent and 160,000 boe in 2018 production, and assets in Denmark, the UK, Norway, the US Gulf of Mexico, Algeria, Kazakhstan, Iraqi Kurdistan, Angola, Kenya and Brazil.
*
tenkiu bos meon. lebiu icon_idea.gif icon_idea.gif
TSmohdyakup
post Aug 27 2017, 11:08 AM

Look at all my stars!!
*******
Senior Member
4,351 posts

Joined: Oct 2009
From: Bintulu, Sarawak


Vacancy at Tok Bali Supply Base

Position : Senior Executive, Business Development
Experience : 5-7 years in Marketing (oil and gas)
Job Task : Develop SOP, meeting with Client / PSC
Gender : Male
Work Base : Kelantan

Position : Executive, Procurement
Experience : 1-3 years in Purchasing
Job Task : Develop SOP, manage / establish link with supplier & vendor
Gender : Male / Female
Work Base : Kelantan

Position : Operator, Base Radio
Experience : 1-3 years in Tower Radio (marine)
Job Task : Communicate with marine crew, Standby for shift rotation
Gender : Male
Work Base : Kelantan

Position : Executive, Marine
Experience : 1-3 years in Marine, Quality Industry
Job Task : Manage marine material, marine office administration, manage schedule for operation, develop SOP for marine
Gender : Male / Female
Work Base : Kelantan

Position : Assistant, Account
Experience : 1-3 years in UBS software
Job Task : key in data into UBS software, manage AP/AR, bank reconciliation
Gender : Male / Female
Work Base : Kelantan

Position : Lead Engineer, Civil Structure
Experience: 7-9 years in civil / structure industry (oil and gas)
Job Task : Lead department for project, assist HOD for engineering calculation, review details design, review commercial, develop SOP for engineering / project
Gender : Male
Work Base : Kelantan

Position : Executive, Contract
Experience : 1-3 years in contract management (oil and gas)
Job Task : Develop SOP for contract, Update minutes meeting, manage claim, meeting with client / PSC, review commercial, manage link with customer
Gender : Male
Work Base : Kelantan

Position : Cost Controller, Project
Experience : 3-5 in project cost control (oil and gas)
Job Task : Develop SOP, manage cost for project, responsible for project cost report
Gender : Male
Work Base : Kelantan

Position : Executive, Finance
Experience : 1-3 years in finance (taxation)
Job Task : manage company taxation, manage AP/AR report, liaise with local authority
Gender : Male / Female
Work Base : Kelantan

Email resume to : hr@tbsb.my
kucinggemok
post Aug 27 2017, 01:50 PM

Getting Started
**
Junior Member
99 posts

Joined: Mar 2009
Mubadala & KPOC is hiring too
adibyusoff
post Aug 28 2017, 08:23 AM

work smart, play hard.
*****
Senior Member
787 posts

Joined: Aug 2009
From: Kuala Lumpur, Malaysia



QUOTE(kucinggemok @ Aug 27 2017, 01:50 PM)
Mubadala & KPOC is hiring too
*
care to share the info bos? notworthy.gif
sangarjuna
post Aug 28 2017, 08:27 AM

Getting Started
**
Junior Member
55 posts

Joined: May 2017


QUOTE(adibyusoff @ Aug 28 2017, 09:23 AM)
care to share the info bos?  notworthy.gif
*
attachedAttached Image Attached Image
adibyusoff
post Aug 28 2017, 08:40 AM

work smart, play hard.
*****
Senior Member
787 posts

Joined: Aug 2009
From: Kuala Lumpur, Malaysia



QUOTE(sangarjuna @ Aug 28 2017, 08:27 AM)
attachedAttached Image Attached Image
*
nice. tengs bossss nod.gif nod.gif
jianh
post Aug 28 2017, 10:27 AM

What custom title???
*****
Senior Member
920 posts

Joined: Jun 2007


[deleted just because]

This post has been edited by jianh: Aug 29 2017, 11:14 PM
kabuto12
post Aug 28 2017, 05:01 PM

Getting Started
**
Junior Member
222 posts

Joined: Apr 2016


Anyone know what Deleum Primera do? They're hiring too..
TSmohdyakup
post Aug 28 2017, 05:39 PM

Look at all my stars!!
*******
Senior Member
4,351 posts

Joined: Oct 2009
From: Bintulu, Sarawak


Deleum won a maintenance contract with PCSB SKO
kabuto12
post Aug 28 2017, 05:59 PM

Getting Started
**
Junior Member
222 posts

Joined: Apr 2016


QUOTE(mohdyakup @ Aug 28 2017, 06:39 PM)
Deleum won a maintenance contract with PCSB SKO
*
Thanks sifu... Maintenance platform ka?

318 Pages « < 9 10 11 12 13 > » Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0619sec    0.39    6 queries    GZIP Disabled
Time is now: 30th November 2025 - 06:21 PM