Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

> EKOCHERAS @ JALAN CHERAS (V4) [MRT PROPERTY] [OT], Where Cheras becomes Mont'Jiulai Investment

views
     
Jagalat
post Apr 18 2016, 12:18 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,703 posts

Joined: Oct 2013
BlkJ site, view from the back, more walls were formed after applying cement
user posted image

Jagalat
post Apr 18 2016, 12:19 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,703 posts

Joined: Oct 2013
BlkH site, started to reveal B2 level....
user posted image

Jagalat
post Apr 18 2016, 12:19 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,703 posts

Joined: Oct 2013
Uturn flyover at Billion roundabout, more "T" pillars formed next to MRR2...
user posted image

jasonmatthew
post Apr 23 2016, 01:03 PM

New Member
*
Junior Member
36 posts

Joined: Oct 2007
QUOTE(Jagalat @ Apr 18 2016, 12:19 PM)
Uturn flyover at Billion roundabout, more "T" pillars formed next to MRR2...
user posted image
*
Hi jagalat gor, thanks for the update.
So long never visit here and im glad it is progressing albiet a bit slow.
Im still confuse about the uturn at the billion round about. Is it on mrr2, from seripetaling u turn and lead directly into ekovest area or how ah?

Jagalat
post Apr 23 2016, 01:19 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,703 posts

Joined: Oct 2013
QUOTE(jasonmatthew @ Apr 23 2016, 02:03 PM)
Hi jagalat gor, thanks for the update.
So long never visit here and im glad it is progressing albiet a bit slow.
Im still confuse about the uturn at the billion round about. Is it on mrr2, from seripetaling u turn and lead directly into ekovest area or how ah?
*
The Uturn flyover is situated on MRR2, stats ramping at a point in front of Taman Billion and ends at a point in front of Tesco Midah.
It is shown in the red line of a small picture

http://ekocheras.com/location_map.html

It is not from seripetaling u turn and leads directly into ekovest area...


This post has been edited by Jagalat: Apr 23 2016, 01:24 PM
jasonmatthew
post Apr 23 2016, 01:38 PM

New Member
*
Junior Member
36 posts

Joined: Oct 2007
I see. In that case, it ease the congestion at billion round about and ease the people leaving ekovest but not for those who r going to ekovest. Is there any new way for those who heading to ekovest from kl or seri petaling direction? Or must it drive further down jalan cheras then uturn back?

This post has been edited by jasonmatthew: Apr 23 2016, 01:39 PM
BEANCOUNTER
post Apr 23 2016, 01:48 PM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
QUOTE(gks @ Apr 12 2016, 11:43 PM)
ww1, it is not excuse. but the fact is when you compare to conventional condo, it is not apple to apple comparison with Ekocheras. Some conventional condo even struggle to complete whole project in 36months.

My personal observation is they underestimate the amount of works especially the below ground work required and financing part of the project. However works seems to pick up and hopefully significant progress is achieved in coming months.
*
am not taking side....

when you guys signed the SPA, the mall project hasn't been confirmed yet. they were supposed to have shoplots nia....

then the mall concept approved after the SPA.

Honestly I wont count so early that buyers will get LAD yet...(yes it looks like definitely wont be completing before the SPA date), but some developers managed to obtain extended completed time from Authority for genuine delay or extended period required bcos of change of master plan.....

I expect Ekocheras will do the same.....
Jagalat
post Apr 23 2016, 02:06 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,703 posts

Joined: Oct 2013
QUOTE(jasonmatthew @ Apr 23 2016, 02:38 PM)
I see. In that case,  it ease the congestion at billion round about and ease the people leaving ekovest but not for those who r going to ekovest. Is there any new way for those who heading to ekovest from kl or seri petaling direction? Or must it drive further down jalan cheras then uturn back?
*
Si far, there is no new way directly heading to ekovest from KL or Seri Petaling direction except from Jln Cheras. I have the same concern as you do. A direct assess from the KL or Sri Petaling direction would attract money coming to the mall too. Don't know why.

Anyway, there will be a future project called Viva Impian Residence located in between Bukit Tiara and Tiara Hills (ya, the two Tiara-s). A future direct access will be built at MRR2 from Seri Petaling direction to the new project (only one direction). From the Viva place, it is linked to EKC via internal Taman Mutiara Barat roads.


jasonmatthew
post Apr 23 2016, 03:35 PM

New Member
*
Junior Member
36 posts

Joined: Oct 2007
For now, pople need to drive pass leisure mall and there is one elevated u turn, if i remember correctly. The thing that will annoy me is i imagine i stuck in the jam inching to the u turn and ekovest is just on my right side. So near yet so far. We all know how bad that jam can be in that area. God forbid flash flood that surely exagerate the jam 100 folds.
U sure know a lot about development near by. I really hope that the tiara's service road branch from mrr2 will be assessible for ekovest as well. Even only one way.

This post has been edited by jasonmatthew: Apr 23 2016, 03:41 PM
Jagalat
post May 1 2016, 06:14 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,703 posts

Joined: Oct 2013

Passed by 4hrs ago...
BlkJ...L1 started to show cement floor
user posted image



Jagalat
post May 1 2016, 06:14 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,703 posts

Joined: Oct 2013

BlkH... B2 cement floor revealed.... highest metal bars going for B1
user posted image


Jagalat
post May 1 2016, 06:15 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,703 posts

Joined: Oct 2013
BlkH..Zoom from another angle
user posted image

Jagalat
post May 1 2016, 06:16 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,703 posts

Joined: Oct 2013

BlkE...The best zoom so far...deep and flat... You may see a bore pile or something..
user posted image

Jagalat
post May 3 2016, 01:57 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,703 posts

Joined: Oct 2013
QUOTE(MonGJiHyo @ Apr 12 2016, 11:45 PM)
wow.. thanks for the analysis of guessing the high possibility of GSC being EKC's cinema operator  :thumbsup:
*
Happened to watch a movie at GSC Leisure Mall last weekend.
The cinema halls have been renovated and smell of new hall was there. Seat sizes were following the GSC standard with stair style (no longer walking slope).

MonGJiHyo
post May 3 2016, 10:03 PM

Look at all my stars!!
*******
Senior Member
2,699 posts

Joined: Sep 2015
QUOTE(Jagalat @ May 3 2016, 01:57 PM)
Happened to watch a movie at GSC Leisure Mall last weekend.
The cinema halls have been renovated and smell of new hall was there. Seat sizes were following the GSC standard with stair style (no longer walking slope).
*
still 4 halls, right?

Good to know that they have renovated as I didn't watch movie at there for such a long time because of the smelly seats.. biggrin.gif
Jagalat
post May 4 2016, 12:23 AM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,703 posts

Joined: Oct 2013
QUOTE(MonGJiHyo @ May 3 2016, 11:03 PM)
still 4 halls, right?

Good to know that they have renovated as I didn't watch movie at there for such a long time because of the smelly seats..  biggrin.gif
*
Yup...still 4 halls and tickets price increased to GSC standard rate...
MonGJiHyo
post May 4 2016, 09:49 PM

Look at all my stars!!
*******
Senior Member
2,699 posts

Joined: Sep 2015
QUOTE(Jagalat @ May 4 2016, 12:23 AM)
Yup...still 4 halls and tickets price increased to GSC standard rate...
*
thanks for the info icon_rolleyes.gif
Jagalat
post May 15 2016, 07:56 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,703 posts

Joined: Oct 2013
Taken this afternoon.
BlkJ... More cement walls formed
user posted image

Jagalat
post May 15 2016, 07:57 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,703 posts

Joined: Oct 2013

BlkH... Cement filling/work extended. One construction crane installed, which will speed up the construction progress.
user posted image

wil-i-am
post May 15 2016, 08:17 PM

10k Club
********
Senior Member
10,001 posts

Joined: May 2013
QUOTE(Jagalat @ May 15 2016, 07:57 PM)
BlkH... Cement filling/work extended. One construction crane installed, which will speed up the construction progress.
user posted image
*
Thanks for d update

173 Pages « < 33 34 35 36 > » Top
 

Change to:
| Lo-Fi Version
0.0151sec    0.26    6 queries    GZIP Disabled
Time is now: 28th March 2024 - 10:30 PM