If we based on ekovest reputation, it should be able to complete.The concern of slow progress require strict monitoring n follow up as it is very slow with just 1+years left to completion. Some structure up is a good sign as highlightd by jagalat but still too slow to be comfort.
As buyers just push n monitor this closely with developer.we heard abt the problem with empire damansara, we wouldnt want to see it here.
|
|
|
|
|
|
Jagalat
|
Apr 14 2016, 02:29 PM
|
|
QUOTE(woowoo1 @ Apr 13 2016, 11:12 PM) If we based on ekovest reputation, it should be able to complete.The concern of slow progress require strict monitoring n follow up as it is very slow with just 1+years left to completion. Some structure up is a good sign as highlightd by jagalat but still too slow to be comfort. As buyers just push n monitor this closely with developer.we heard abt the problem with empire damansara, we wouldnt want to see it here. Thx for your concern and suggestion. Regardless how much text exchanged in the forum, it will arrive to one of the practical action items, ie to continuously monitor closely the progress. So, pls join monitoring with us on its progress... As for Vempire, my reply was done at earlier post... https://forum.lowyat.net/topic/3648832/+642This post has been edited by Jagalat: Apr 14 2016, 05:31 PM
|
|
|
|
|
|
Jagalat
|
Apr 18 2016, 12:17 PM
|
|
Passed by yesterday ... BlkJ view from opposite direction of Jln Cheras...rise above fence....now everyone can monitor the progress!
|
|
|
|
|
|
Jagalat
|
Apr 18 2016, 12:18 PM
|
|
BlkJ site, view from the back, more walls were formed after applying cement
|
|
|
|
|
|
Jagalat
|
Apr 18 2016, 12:19 PM
|
|
BlkH site, started to reveal B2 level....
|
|
|
|
|
|
Jagalat
|
Apr 18 2016, 12:19 PM
|
|
Uturn flyover at Billion roundabout, more "T" pillars formed next to MRR2...
|
|
|
|
|
|
jasonmatthew
|
Apr 23 2016, 01:03 PM
|
New Member
|
QUOTE(Jagalat @ Apr 18 2016, 12:19 PM) Uturn flyover at Billion roundabout, more "T" pillars formed next to MRR2...  Hi jagalat gor, thanks for the update. So long never visit here and im glad it is progressing albiet a bit slow. Im still confuse about the uturn at the billion round about. Is it on mrr2, from seripetaling u turn and lead directly into ekovest area or how ah?
|
|
|
|
|
|
Jagalat
|
Apr 23 2016, 01:19 PM
|
|
QUOTE(jasonmatthew @ Apr 23 2016, 02:03 PM) Hi jagalat gor, thanks for the update. So long never visit here and im glad it is progressing albiet a bit slow. Im still confuse about the uturn at the billion round about. Is it on mrr2, from seripetaling u turn and lead directly into ekovest area or how ah? The Uturn flyover is situated on MRR2, stats ramping at a point in front of Taman Billion and ends at a point in front of Tesco Midah. It is shown in the red line of a small picture http://ekocheras.com/location_map.htmlIt is not from seripetaling u turn and leads directly into ekovest area... This post has been edited by Jagalat: Apr 23 2016, 01:24 PM
|
|
|
|
|
|
jasonmatthew
|
Apr 23 2016, 01:38 PM
|
New Member
|
I see. In that case, it ease the congestion at billion round about and ease the people leaving ekovest but not for those who r going to ekovest. Is there any new way for those who heading to ekovest from kl or seri petaling direction? Or must it drive further down jalan cheras then uturn back?
This post has been edited by jasonmatthew: Apr 23 2016, 01:39 PM
|
|
|
|
|
|
BEANCOUNTER
|
Apr 23 2016, 01:48 PM
|
|
QUOTE(gks @ Apr 12 2016, 11:43 PM) ww1, it is not excuse. but the fact is when you compare to conventional condo, it is not apple to apple comparison with Ekocheras. Some conventional condo even struggle to complete whole project in 36months. My personal observation is they underestimate the amount of works especially the below ground work required and financing part of the project. However works seems to pick up and hopefully significant progress is achieved in coming months. am not taking side.... when you guys signed the SPA, the mall project hasn't been confirmed yet. they were supposed to have shoplots nia.... then the mall concept approved after the SPA. Honestly I wont count so early that buyers will get LAD yet...(yes it looks like definitely wont be completing before the SPA date), but some developers managed to obtain extended completed time from Authority for genuine delay or extended period required bcos of change of master plan..... I expect Ekocheras will do the same.....
|
|
|
|
|
|
Jagalat
|
Apr 23 2016, 02:06 PM
|
|
QUOTE(jasonmatthew @ Apr 23 2016, 02:38 PM) I see. In that case, it ease the congestion at billion round about and ease the people leaving ekovest but not for those who r going to ekovest. Is there any new way for those who heading to ekovest from kl or seri petaling direction? Or must it drive further down jalan cheras then uturn back? Si far, there is no new way directly heading to ekovest from KL or Seri Petaling direction except from Jln Cheras. I have the same concern as you do. A direct assess from the KL or Sri Petaling direction would attract money coming to the mall too. Don't know why. Anyway, there will be a future project called Viva Impian Residence located in between Bukit Tiara and Tiara Hills (ya, the two Tiara-s). A future direct access will be built at MRR2 from Seri Petaling direction to the new project (only one direction). From the Viva place, it is linked to EKC via internal Taman Mutiara Barat roads.
|
|
|
|
|
|
jasonmatthew
|
Apr 23 2016, 03:35 PM
|
New Member
|
For now, pople need to drive pass leisure mall and there is one elevated u turn, if i remember correctly. The thing that will annoy me is i imagine i stuck in the jam inching to the u turn and ekovest is just on my right side. So near yet so far. We all know how bad that jam can be in that area. God forbid flash flood that surely exagerate the jam 100 folds. U sure know a lot about development near by. I really hope that the tiara's service road branch from mrr2 will be assessible for ekovest as well. Even only one way.
This post has been edited by jasonmatthew: Apr 23 2016, 03:41 PM
|
|
|
|
|
|
Jagalat
|
May 1 2016, 06:14 PM
|
|
Passed by 4hrs ago... BlkJ...L1 started to show cement floor
|
|
|
|
|
|
Jagalat
|
May 1 2016, 06:14 PM
|
|
BlkH... B2 cement floor revealed.... highest metal bars going for B1
|
|
|
|
|
|
Jagalat
|
May 1 2016, 06:15 PM
|
|
BlkH..Zoom from another angle
|
|
|
|
|
|
Jagalat
|
May 1 2016, 06:16 PM
|
|
BlkE...The best zoom so far...deep and flat... You may see a bore pile or something..
|
|
|
|
|
|
Jagalat
|
May 3 2016, 01:57 PM
|
|
QUOTE(MonGJiHyo @ Apr 12 2016, 11:45 PM) wow.. thanks for the analysis of guessing the high possibility of GSC being EKC's cinema operator :thumbsup: Happened to watch a movie at GSC Leisure Mall last weekend. The cinema halls have been renovated and smell of new hall was there. Seat sizes were following the GSC standard with stair style (no longer walking slope).
|
|
|
|
|
|
MonGJiHyo
|
May 3 2016, 10:03 PM
|
|
QUOTE(Jagalat @ May 3 2016, 01:57 PM) Happened to watch a movie at GSC Leisure Mall last weekend. The cinema halls have been renovated and smell of new hall was there. Seat sizes were following the GSC standard with stair style (no longer walking slope). still 4 halls, right? Good to know that they have renovated as I didn't watch movie at there for such a long time because of the smelly seats..
|
|
|
|
|
|
Jagalat
|
May 4 2016, 12:23 AM
|
|
QUOTE(MonGJiHyo @ May 3 2016, 11:03 PM) still 4 halls, right? Good to know that they have renovated as I didn't watch movie at there for such a long time because of the smelly seats..  Yup...still 4 halls and tickets price increased to GSC standard rate...
|
|
|
|
|
|
MonGJiHyo
|
May 4 2016, 09:49 PM
|
|
QUOTE(Jagalat @ May 4 2016, 12:23 AM) Yup...still 4 halls and tickets price increased to GSC standard rate... thanks for the info
|
|
|
|
|