Investment EKOCHERAS @ JALAN CHERAS (V4) [MRT PROPERTY] [OT], Where Cheras becomes Mont'Jiulai

views
     
Jagalat
post Aug 23 2015, 03:21 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,947 posts

Joined: Oct 2013

BlkJ site, taken from left angle
user posted image

Jagalat
post Aug 23 2015, 03:21 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,947 posts

Joined: Oct 2013
BlkH site, larger area dug..
user posted image

This post has been edited by Jagalat: Aug 23 2015, 03:23 PM
Jagalat
post Aug 23 2015, 03:23 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,947 posts

Joined: Oct 2013

Huge quantity and a big pile of metal/steel rods used for construction.
user posted image

takezhiro
post Aug 24 2015, 12:43 AM

Getting Started
**
Junior Member
122 posts

Joined: Jul 2007
QUOTE(Jagalat @ Aug 23 2015, 03:23 PM)
Huge quantity and a big pile of metal/steel rods used for construction.
user posted image
*
Thank you so much appreciate your info and update.


sianglee
post Aug 24 2015, 09:25 PM

New Member
*
Junior Member
33 posts

Joined: Nov 2008
From: Kaula Lumpur


QUOTE(Jagalat @ Aug 23 2015, 03:23 PM)
Huge quantity and a big pile of metal/steel rods used for construction.
user posted image
*
Walao all rusty rebars here.......no proper cover or protection all.....all bars will suffer sectional lost after exposing for one year...
restful increase
post Aug 24 2015, 09:50 PM

Regular
******
Senior Member
1,428 posts

Joined: Sep 2013


QUOTE(sianglee @ Aug 24 2015, 09:25 PM)
Walao all rusty rebars here.......no proper cover or protection all.....all bars will suffer sectional lost after exposing for one year...
*
the PRC bars will all b buried in cement and concrete soon..
HELLO HELLO
post Aug 24 2015, 10:01 PM

Look at all my stars!!
*******
Senior Member
5,436 posts

Joined: Jan 2011
Yawor besi so sibeh rusty Liao. Even cover with cement how Long it can last?
restful increase
post Aug 25 2015, 01:14 AM

Regular
******
Senior Member
1,428 posts

Joined: Sep 2013


QUOTE(HELLO HELLO @ Aug 24 2015, 10:01 PM)
Yawor besi so sibeh rusty Liao. Even cover with cement how Long it can last?
*
once in the cement no more air penetration so the rusting process stops.
Jagalat
post Aug 27 2015, 11:09 AM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,947 posts

Joined: Oct 2013
QUOTE(accetera @ Aug 17 2015, 06:40 PM)
Savills recently took over CB Richard Ellis Malaysia (CBRE).

Long time ago, CBRE did managed some malls as well, including the infamous SStwo Mall.
*
I hope Savills gets to learn what went wrong with SStwo mall.
In addition, both EKV and Savills should come out with the recipes in making the EKC mall successful.
http://www.nanyang.com/node/719199?tid=688

takezhiro
post Aug 27 2015, 11:59 AM

Getting Started
**
Junior Member
122 posts

Joined: Jul 2007
QUOTE(Jagalat @ Aug 27 2015, 11:09 AM)
I hope Savills gets to learn what went wrong with SStwo mall.
In addition, both EKV and Savills should come out with the recipes in making the EKC mall successful.
http://www.nanyang.com/node/719199?tid=688
*
very sad to see cheras central many retail moving out

Jagalat
post Aug 27 2015, 12:19 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,947 posts

Joined: Oct 2013
QUOTE(takezhiro @ Aug 27 2015, 12:59 PM)
very sad to see cheras central many retail moving out
*
I am sad too.
Since Cheras Sentral lost its interchange status(not in new proposed MRT2 alignment), Mayland and its mall management unit really have to put in more effort in sustaining the mall.
sianglee
post Aug 27 2015, 07:46 PM

New Member
*
Junior Member
33 posts

Joined: Nov 2008
From: Kaula Lumpur


QUOTE(restful increase @ Aug 25 2015, 01:14 AM)
once in the cement no more air penetration so the rusting process stops.
*
Bro its not the problem of continuing rusting in the concrete, its the problem of is those bars enough capacity not within the design limit. Says the design require 4nos of 20 mm diameter bars in the beams/columns, but after the rusting process left only the rusty 4 nos of 18 mm diameter bars 100%-(18^2/20^2 x 100)=19% losses!!! ....become much insufficient, hard to tell about the real integrity of structure performance later..

takezhiro
post Sep 1 2015, 09:35 AM

Getting Started
**
Junior Member
122 posts

Joined: Jul 2007
New tenant coming to leisure mall.


Attached thumbnail(s)
Attached Image
restful increase
post Sep 1 2015, 11:54 PM

Regular
******
Senior Member
1,428 posts

Joined: Sep 2013


QUOTE(sianglee @ Aug 27 2015, 07:46 PM)
Bro its not the problem of continuing rusting in the concrete, its the problem of is those bars enough capacity not within the design limit. Says the design require 4nos of 20 mm diameter bars in the beams/columns, but after the rusting process left only the rusty 4 nos of 18  mm diameter  bars  100%-(18^2/20^2 x 100)=19% losses!!! ....become much insufficient, hard to tell about the real integrity of structure performance later..
*
actually i noticed most contractors leave their iron bars uncovered. i think it cost them money and space to provide a cover.
wl_n
post Sep 2 2015, 12:28 PM

Enthusiast
*****
Senior Member
745 posts

Joined: Jul 2010
QUOTE(sianglee @ Aug 27 2015, 07:46 PM)
Bro its not the problem of continuing rusting in the concrete, its the problem of is those bars enough capacity not within the design limit. Says the design require 4nos of 20 mm diameter bars in the beams/columns, but after the rusting process left only the rusty 4 nos of 18  mm diameter  bars  100%-(18^2/20^2 x 100)=19% losses!!! ....become much insufficient, hard to tell about the real integrity of structure performance later..
*
Is the structure still safe for occupancy?
restful increase
post Sep 6 2015, 12:22 AM

Regular
******
Senior Member
1,428 posts

Joined: Sep 2013


QUOTE(wl_n @ Sep 2 2015, 12:28 PM)
Is the structure still safe for occupancy?
*
if u check other construction sites, u will notice most (if not all) also leave their metal bars outside and exposed to the sun and rain. let me noe which projects actually built a shade for these materials.
restful increase
post Sep 6 2015, 12:24 AM

Regular
******
Senior Member
1,428 posts

Joined: Sep 2013


i heard fr another staff of ekocheras that saville is not managing their mall. the mall will be self managed by internal ekovest management.
TSaccetera
post Sep 6 2015, 10:24 AM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


Hearsay Ikon Connaught rental drop to flat RM1,000 per month only. Jia lat... Babizz
neonikson1
post Sep 6 2015, 10:46 AM

Look at all my stars!!
*******
Senior Member
2,086 posts

Joined: Feb 2011
QUOTE(accetera @ Sep 6 2015, 10:24 AM)
Hearsay Ikon Connaught rental drop to flat RM1,000 per month only. Jia lat... Babizz
*
40 new malls entering to Klang Valley competition by next year! Retail business faces the biggest challenge of all time!

http://www.thestar.com.my/Business/Busines...tail/?style=biz
TSaccetera
post Sep 6 2015, 10:54 AM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


QUOTE(neonikson1 @ Sep 6 2015, 10:46 AM)
40 new malls entering to Klang Valley competition by next year!  Retail business faces the biggest challenge of all time!
 
http://www.thestar.com.my/Business/Busines...tail/?style=biz
*
There are actually more than 40, easily double or triple if u include places like Ikon Connaught as a mall and future unconfirmed ones such as Atria Cheras and Dupion Island Cheras.