Welcome Guest ( Log In | Register )

174 Pages « < 7 8 9 10 11 > » Bottom

Outline · [ Standard ] · Linear+

Investment EKOCHERAS @ JALAN CHERAS (V4) [MRT PROPERTY] [OT], Where Cheras becomes Mont'Jiulai

views
     
Jagalat
post Aug 18 2015, 04:08 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,947 posts

Joined: Oct 2013
QUOTE(neonikson1 @ Aug 18 2015, 01:08 PM)
[quote=CMW123,Aug 16 2015, 10:18 PM]
http://www.msn.com/en-my/news/other/ekoves...sets/ar-AAaZzHv

what is your comment on the financial and cash flow position of the developer?
*


Have a quick glimpse about cash flow on pg4 and observed some negative values (negative net cash from operating activities, negative net cash used in investing activities etc)
(I am no expert, just reading only)

CMW boss, what do you think?
(Believe you have something in mind)

Have yet seen their June report made available from the link...

CMW123
post Aug 18 2015, 05:13 PM

Look at all my stars!!
*******
Senior Member
3,774 posts

Joined: Mar 2012
From the marketing brochure, the EKC land has been charged to Ambank. Since the land has been bought many years ago at low cost, the land cost should have been paid off presumably. Then this charge should be for bridging loan.

If there is really a bridging loan obtained from Ambank, there should be adequate cashflow available to fund and push the construction fast




takezhiro
post Aug 19 2015, 07:29 PM

Getting Started
**
Junior Member
122 posts

Joined: Jul 2007
FYI


Attached thumbnail(s)
Attached Image
ekorjiulai
post Aug 21 2015, 03:34 PM

Getting Started
**
Junior Member
112 posts

Joined: Nov 2013
Ekovest in starproperty news:
http://www.starproperty.my/index.php/artic...ure-titiwangsa/
Jagalat
post Aug 21 2015, 11:13 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,947 posts

Joined: Oct 2013
Weekend Side Track
http://www.theborneopost.com/2015/08/17/ek...n-duke-highway/

Ekovest in good stead with acquisition of 100 pct equity interest in DUKE highway
August 17, 2015, Monday

"On another note, Kenanga Research said that the major portion of the unbilled sales is from EkoCheras (gross development value (GDV) of RM1.6 billion) and expected to last until 2017."

Related PDF.
https://www.google.com/url?sa=t&source=web&...Zlt4jjvvJ_oBu3g




This post has been edited by Jagalat: Aug 21 2015, 11:17 PM
Jagalat
post Aug 23 2015, 03:20 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,947 posts

Joined: Oct 2013
Taken today, about 2 hours ago
BlkJ site
user posted image


This post has been edited by Jagalat: Aug 23 2015, 03:51 PM
Jagalat
post Aug 23 2015, 03:21 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,947 posts

Joined: Oct 2013

BlkJ site, taken from left angle
user posted image

Jagalat
post Aug 23 2015, 03:21 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,947 posts

Joined: Oct 2013
BlkH site, larger area dug..
user posted image

This post has been edited by Jagalat: Aug 23 2015, 03:23 PM
Jagalat
post Aug 23 2015, 03:23 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,947 posts

Joined: Oct 2013

Huge quantity and a big pile of metal/steel rods used for construction.
user posted image

takezhiro
post Aug 24 2015, 12:43 AM

Getting Started
**
Junior Member
122 posts

Joined: Jul 2007
QUOTE(Jagalat @ Aug 23 2015, 03:23 PM)
Huge quantity and a big pile of metal/steel rods used for construction.
user posted image
*
Thank you so much appreciate your info and update.


sianglee
post Aug 24 2015, 09:25 PM

New Member
*
Junior Member
33 posts

Joined: Nov 2008
From: Kaula Lumpur


QUOTE(Jagalat @ Aug 23 2015, 03:23 PM)
Huge quantity and a big pile of metal/steel rods used for construction.
user posted image
*
Walao all rusty rebars here.......no proper cover or protection all.....all bars will suffer sectional lost after exposing for one year...
restful increase
post Aug 24 2015, 09:50 PM

Regular
******
Senior Member
1,428 posts

Joined: Sep 2013


QUOTE(sianglee @ Aug 24 2015, 09:25 PM)
Walao all rusty rebars here.......no proper cover or protection all.....all bars will suffer sectional lost after exposing for one year...
*
the PRC bars will all b buried in cement and concrete soon..
HELLO HELLO
post Aug 24 2015, 10:01 PM

Look at all my stars!!
*******
Senior Member
5,436 posts

Joined: Jan 2011
Yawor besi so sibeh rusty Liao. Even cover with cement how Long it can last?
restful increase
post Aug 25 2015, 01:14 AM

Regular
******
Senior Member
1,428 posts

Joined: Sep 2013


QUOTE(HELLO HELLO @ Aug 24 2015, 10:01 PM)
Yawor besi so sibeh rusty Liao. Even cover with cement how Long it can last?
*
once in the cement no more air penetration so the rusting process stops.
Jagalat
post Aug 27 2015, 11:09 AM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,947 posts

Joined: Oct 2013
QUOTE(accetera @ Aug 17 2015, 06:40 PM)
Savills recently took over CB Richard Ellis Malaysia (CBRE).

Long time ago, CBRE did managed some malls as well, including the infamous SStwo Mall.
*
I hope Savills gets to learn what went wrong with SStwo mall.
In addition, both EKV and Savills should come out with the recipes in making the EKC mall successful.
http://www.nanyang.com/node/719199?tid=688

takezhiro
post Aug 27 2015, 11:59 AM

Getting Started
**
Junior Member
122 posts

Joined: Jul 2007
QUOTE(Jagalat @ Aug 27 2015, 11:09 AM)
I hope Savills gets to learn what went wrong with SStwo mall.
In addition, both EKV and Savills should come out with the recipes in making the EKC mall successful.
http://www.nanyang.com/node/719199?tid=688
*
very sad to see cheras central many retail moving out

Jagalat
post Aug 27 2015, 12:19 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,947 posts

Joined: Oct 2013
QUOTE(takezhiro @ Aug 27 2015, 12:59 PM)
very sad to see cheras central many retail moving out
*
I am sad too.
Since Cheras Sentral lost its interchange status(not in new proposed MRT2 alignment), Mayland and its mall management unit really have to put in more effort in sustaining the mall.
sianglee
post Aug 27 2015, 07:46 PM

New Member
*
Junior Member
33 posts

Joined: Nov 2008
From: Kaula Lumpur


QUOTE(restful increase @ Aug 25 2015, 01:14 AM)
once in the cement no more air penetration so the rusting process stops.
*
Bro its not the problem of continuing rusting in the concrete, its the problem of is those bars enough capacity not within the design limit. Says the design require 4nos of 20 mm diameter bars in the beams/columns, but after the rusting process left only the rusty 4 nos of 18 mm diameter bars 100%-(18^2/20^2 x 100)=19% losses!!! ....become much insufficient, hard to tell about the real integrity of structure performance later..

takezhiro
post Sep 1 2015, 09:35 AM

Getting Started
**
Junior Member
122 posts

Joined: Jul 2007
New tenant coming to leisure mall.


Attached thumbnail(s)
Attached Image
restful increase
post Sep 1 2015, 11:54 PM

Regular
******
Senior Member
1,428 posts

Joined: Sep 2013


QUOTE(sianglee @ Aug 27 2015, 07:46 PM)
Bro its not the problem of continuing rusting in the concrete, its the problem of is those bars enough capacity not within the design limit. Says the design require 4nos of 20 mm diameter bars in the beams/columns, but after the rusting process left only the rusty 4 nos of 18  mm diameter  bars  100%-(18^2/20^2 x 100)=19% losses!!! ....become much insufficient, hard to tell about the real integrity of structure performance later..
*
actually i noticed most contractors leave their iron bars uncovered. i think it cost them money and space to provide a cover.

174 Pages « < 7 8 9 10 11 > » Top
 

Change to:
| Lo-Fi Version
0.0197sec    0.42    6 queries    GZIP Disabled
Time is now: 6th December 2025 - 05:28 AM