Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed
22 Pages < 1 2 3 4 > » Bottom

Outline · [ Standard ] · Linear+

Investment SETIA ECOHILL (VERSION 13) [Owner's Thread], An Inspiring Eco Township in Semenyih

views
     
samkps
post Mar 1 2015, 11:34 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(gtfan @ Mar 1 2015, 11:32 PM)
One of the sp mgmt guy shared with us in the tour bus mentioning that the clubhouse will be 4 storey high with 230,000 sqft built up. It will have a 360 degrees deck for viewing the whole of ecohill areas. 2 storeys are for car park.
*
Great thanks for sharing... My tour guide mention that it will be located at the highest point in Presint 2...

The swimming pool seems is at outdoor.... rclxms.gif rclxms.gif rclxms.gif
samkps
post Mar 1 2015, 11:39 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(treehill @ Mar 1 2015, 11:37 PM)
Fan gor, you must be in bus 2  tongue.gif
*
hahaha... treehill gor and fan gor both in bus 2... tongue.gif tongue.gif tongue.gif
samkps
post Mar 1 2015, 11:46 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(treehill @ Mar 1 2015, 11:41 PM)
Ya, notice that too. Exactly the same too. I guess onlt available for all precincts except 1  smile.gif
*
We only see the lake section... Eager to see the garden section in near future as well.... rclxms.gif rclxms.gif


Attached thumbnail(s)
Attached Image
samkps
post Mar 1 2015, 11:50 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(treehill @ Mar 1 2015, 11:46 PM)
Sam gor, did you notice that our P1 terrace homes small road separating between the 2 end lots in gray color? The main road is black or dark gray. Does it mean that that road is not meant for car to pass thru? Any idea?
*
This one I am not very sure, perhaps gray color means single lane? hmm.gif
samkps
post Mar 2 2015, 12:03 AM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
Great news for EKVE:

We refer to our announcement made on 13 February 2013 in relation to the above matter.

The Board of Directors of Ahmad Zaki Resources Berhad is pleased to inform that its wholly-owned subsidiary, EKVE Sdn Bhd (“EKVE”) has on 12 February 2015 received a letter from the Government of Malaysia as represented by the Ministry of Works, confirming that EKVE has met all conditions precedent as set out in the Concession Agreement.

In this respect, the Government has confirmed the Effective Date for the Concession of the East Klang Valley Expressway (“Expressway”) to be on 12 February 2015. With this confirmation, EKVE will commence physical works on the Expressway with immediate effect.

http://www.bursamalaysia.com/market/listed...cements/1875917

4 years from now, Semenyih folks perhaps no need to pass through Cheras going to KL, can use EKVE directly to Ampang, and SUKE from Ampang to KL.... thumbup.gif thumbup.gif

samkps
post Mar 2 2015, 12:24 AM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(vincentSEH83 @ Mar 2 2015, 12:20 AM)
Good News for semenyih ppl. I think EKVE & ecohill link will helping a lot to develop semenyih area. Compare with kajang..i am more confident on semenyih development since there is three big player(Eco World, SP Setia & UEM Sunrise). 😀😀😀
*
hehehe... The giant S will step into Semenyih very soon.... tongue.gif tongue.gif tongue.gif tongue.gif
samkps
post Mar 2 2015, 03:13 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(Palmwalker001 @ Mar 2 2015, 08:22 AM)
EKVE also need Selangor Government to degazette the forest reserve then only can start work. Azmin demand for the same conditions for all highway operator, any idea AZ fulfill it?
*
If reference to the KIDEX cases, I presume Azmin needs the following 5 items from the consessionaire:

1.) Traffic impact assessment report
2.) Social-economy impact assessement report
3.) Environmental impact assessment report
4.) Table illustration the rate and possible adjustment during the consession period
5.) Full consession agreement.

Item (1) - (3) actually already answered (or partially) in the DEIA report which is available to the public.
https://selangorhijau.wordpress.com/2012/01...sed-ekve-klorr/

Item (4) and (5) should be ready long time ago when AZ won the project. It depends now if AZ would like to reveal it.

Looking at the current Cheras congestion, I presume it is crucial to have alternative road for the Kajang/Semenyih/ Southern region folks to commute in and out from KL city center.

This post has been edited by samkps: Mar 3 2015, 08:38 AM
samkps
post Mar 2 2015, 03:20 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(Jasoncat @ Mar 2 2015, 10:34 AM)
Seems that it was a fruitful tour yesterday and all of you enjoyed yourself.
Great! smile.gif
*
SEH only revealed 30-40% of the whole landscape.. I presume it will be a superb oriental park with fascinating scenary after 100% completion.. Looking towards on this..

It's very great to see both SEH and EM are putting numerous efforts into the township, to make sure they will be a great success in future...

Kudos to both SPS and EW... rclxms.gif rclxms.gif
samkps
post Mar 2 2015, 03:55 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(doomdoom @ Mar 2 2015, 03:39 PM)
after Tan Sri liew left SPS, many ppl kind of look down on the performence for SPS.

but somehow SPS do the job nicely and patiently...yesterday the event is successful and the landscape is nicely done and on par/even better compare to Eco majestic...during the landscape tour yesterday, overheard some ppl said why this place looks nicer than EM but price is cheaper?  tongue.gif
*
Hehehe... nicer or not, depends on personal perception.. tongue.gif

But one thing for sure is this landscape is within the fencing area of presint 3, should be easier to be maintained compared to the swan lake that is outside the fencing area..


samkps
post Mar 2 2015, 04:10 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(vincentSEH83 @ Mar 2 2015, 03:52 PM)
Ya. A lot of rumour saying that SP Setia give low quality product after Tan Sri Liew left to EW but i think this is not true after yesterday botanical tour. 😀😀😀..i believe Datuk Khoo gt capable to lead SPS to another bigger archivement too.
*
Indeed.. Since when Tan Sri left, so many people speculate SEH shall be in great danger due the staff exodus incident.

I have been following the SEH project ways before its launching till now and I have looked at the progress of the project post tan sri period from 3 main aspects:

1.) Progress of the ecohill link
2.) Progress of the houses
3.) Progress of the landscape

None of them are facing serious delay and progress look superb everytime I visit the PARC.

Apparently people just like to speculate since they no need to be responsible on what they speculate..

As a matter of fact, as I mentioned long long time ago, even Tan Sri himself also keen to make sure SEH shall be a success, since EM and SEH shall be depending on each other, grow together and prosperous together. rclxms.gif rclxms.gif

SEH 2 shall be relied heavily on the success of SEH 1 and EM is the first EW landed project in KV. Both SPS and EW shall work very hard to ensure their success since these two township projects just too important for them. thumbup.gif

Yes, and I have faith on the management of Mr. Koh as well, deputy general manager of Setia Ecohill... rclxms.gif rclxms.gif

https://my.linkedin.com/pub/koh-sm/76/25a/606



This post has been edited by samkps: Mar 2 2015, 04:15 PM
samkps
post Mar 2 2015, 04:10 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(Palmwalker001 @ Mar 2 2015, 03:47 PM)
Thanks a lot for your explanation thumbup.gif
*
Welcome, sharing is caring... thumbup.gif thumbup.gif
samkps
post Mar 2 2015, 04:13 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(Palmwalker001 @ Mar 2 2015, 04:03 PM)
Maintenance of these lakes won't be cheap, roughly how much is the maintenance cost?
*
SA told it's about RM 300 per month.. thumbup.gif thumbup.gif

There will be a total more than 500 houses in presint 3... rclxms.gif
samkps
post Mar 2 2015, 04:30 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(Palmwalker001 @ Mar 2 2015, 04:22 PM)
That means these lakes will be take care by SPS instead of MPKJ.

In Goodview Residence,Sg Long also has a private lake but take care by MPKJ, therefore the folks there only need to pay RM180 for two tier security zero for maintenance mad.gif our hard-earned tax payer money used to maintain private lake, there are about 200+ houses there.
*
If there is a public park, by right it is not supposed to be fenced up.. hmm.gif

Anyway, I presume SPS will handle this lake as like those in Eco Park.. rclxms.gif
samkps
post Mar 2 2015, 11:21 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(treehill @ Mar 2 2015, 07:41 PM)
Opening up another road to connect to EcoHill link will definitely cause traffic jam. I really dont want to see that happening. The link now is kinda perfect coz is without any traffic light and well designed exit to precinct 1, 2, and also EcoMajestic...
*
If you refer to the website or any published material of Tiara South, you will see that they never mention clearly about the connection to Ecohill Lekas link. Even in their masterplan, they also never indicate clearly about the connection to Lekas Ecohill link. hmm.gif hmm.gif

In addition, if not mistaken the land of Tiara South is at elevated if compared to the Ecohill Lekas link, the houses have been built till very close to the "edge" of the Ecohill link and wondering whether is it still feasible to build a connecting road there, as it will look like a slope, unless TS plan to flatten the land.

I have a feeling Tiara South is connected to Ecohill link from the other side - from bandar rinching seksyen 3 till the SEH roundabout - The Wind.. I maybe wrong though, but let's wait another 4 months then we will know what's the outcome..

Even there is a connection to the Tiara South, I presume MPKJ only will allow "one way traffic", means either go in or come out in same direction, don't think will cause serious jam. Ecohill link would be something similar to expressway, don't think a traffic light is allowed to build up there..

This post has been edited by samkps: Mar 2 2015, 11:21 PM


Attached thumbnail(s)
Attached Image Attached Image
samkps
post Mar 3 2015, 09:11 AM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(treehill @ Mar 3 2015, 08:54 AM)
I hope is true. I think all of us know that with the extra acc ss it will slowdown the traffic in deep. Many of the traffic jam places happen due to exit (especially with traffic light).
*
As I said, 4 months from now we will see if there is a connection from Tiara South..

I just feel surprise Tiara South never mention about the direct connection to Ecohill Lekas Link in any of their published marketing material... hmm.gif

This is a good selling point, why they never put in... hmm.gif


Attached thumbnail(s)
Attached Image
samkps
post Mar 3 2015, 09:14 AM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
About the EKVE by Kajang Municipal Council (MPKj) Planning Department Director Datuk Nizam Sahari:

http://www.wemotor.com/blog/2015/03/east-k...ase-congestion/
samkps
post Mar 3 2015, 09:28 AM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(vincentSEH83 @ Mar 3 2015, 09:17 AM)
I think the best way will be tiara south using the exists at the wind to connect to ecohill link since SEH has already built the entrance there and they only need to apply from MPKJ to open the entrance from bandar rinching to SEH. If direct open at ecohill link like wat good view height done at silk highway, it is quite dangerous for those car coming out from tiara south too.
*
I agree..

There is already a connecting road from tiara south to the roundabout "The Wind" via bandar rinching seksyen 3.. So, Tiara South don't need to apply anything if using this road.

If they need to open a connection directly to Ecohill link, then a lot of issue will arise. As a matter of fact, it only benefit the TS resident when they back to their house (direct go in), if they want go to KL, would need to follow the path go to the 2-tier roundabout link and U-turn as well...
samkps
post Mar 3 2015, 09:56 AM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(vincentSEH83 @ Mar 3 2015, 09:35 AM)
Unless tiara south would like to built new interchange btw tiara south & ecolink then it is ok for them to open the road. But it is quite costly if tiara south want to do so.
*
Don't think Tiara South shall build an interchange, the cost maybe eat up all their profits. Tiara South is not a big project like Ecomajestic..

Nevertheless, let's see how it goes in 4 months time.. Heard the first VP in June/July is for arroyo garden, not too sure though.. hmm.gif
samkps
post Mar 3 2015, 02:25 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(Palmwalker001 @ Mar 3 2015, 10:21 AM)
Your link https://selangorhijau.wordpress.com/2012/01...sed-ekve-klorr/ for Executive Summary & Detail EIA report not working.  Enclosed herewith the ES i got it elsewhere for your reference.
*
Thanks... I have fixed the link and it is working now... rclxms.gif

https://selangorhijau.wordpress.com/2012/01...sed-ekve-klorr/


samkps
post Mar 3 2015, 02:31 PM

10k Club
********
Senior Member
15,454 posts

Joined: Nov 2011
QUOTE(mtdavedeli @ Mar 3 2015, 11:04 AM)
Happy CNY to all.. Huat Huat Huat.
From the picture posted, the oriental garden looks very nice.

Thank you guys for sharing here..
Pity that I could not make it for the event.
*
Happy CNY to you.. Ong Ong Ong... rclxms.gif rclxms.gif rclxms.gif

Yeah, very nice landscape indeed.. beyond than expectation.. More importantly, SPS only reveal 30 -40% of the total landscape.. Once the whole landscape and the park is up, should be a very fascinating and beautiful garden that matching or even better than Setia Ecopark... rclxms.gif rclxms.gif

22 Pages < 1 2 3 4 > » Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0402sec    0.63    7 queries    GZIP Disabled
Time is now: 18th December 2025 - 06:30 AM