QUOTE(Toyoi @ Jan 15 2016, 01:35 PM)
there should be a limit for one company to given projects

it cannot be only one same company always sapu big projeks with long-term tenure

preferably a company should only be allowed to undertake new project once current project almost completed

imagine one company have 2-3 billions order book and still waiting for another 1-2 billion projects to be awarded

are they really good or simply have an army of Ali baba subcons help them complete the projects?

its time JKR/CIDB should create law anti-monopoly for projects

let us wait how iwubpreve reply to those questions  icon_rolleyes.gif
*
if the open and transparent tender is truly adopted, those company that are fully occupied won't even qualified to tender the work. in fact on paper alibaba is now allow. because u can't sublet the entire project to other contractor in most of the standard form of contract we commonly used. well written in the contract subletting entire project is prohibited.
TSiwubpreve
post Jan 18 2016, 10:11 AM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(Perbaman @ Jan 18 2016, 09:24 AM)
eh anyone know the lightweight precast concrete one ar?
mostly i see is used as coping at windows, with cantilevered about 150-200mm
is there any such product that is similar, but can cantilever up to 3-4 ft?
i need to put overhang on window, but i really dislike to put the polycarbonate awning bekos it looks awful.
so im thinking to use lightweight concrete instead.. idea bernas or not?
cost-wise, izit expense? any rough figure per foot run?

iwubpreve?
*
non load bearing? yeah it have, but non load bearing type. mean can't let people or load stand on the 4ft coping. cost wise is cheap if light weight concrete u mean. actually the so called light weight concrete mostly is hollow concrete therefore is light.
TSiwubpreve
post Jan 18 2016, 05:52 PM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(Perbaman @ Jan 18 2016, 02:33 PM)
orait thanks  thumbup.gif good to know that
izit require supplier's contractor to install or any contractor can do it?

yup non load bearing.. instead of awning, i want it to look like a slab. just dont step on it lah
i've seen a section of the light weight concrete, inside got polystyrene. just dunno where to find it
*
hmm, hardware shop have? but those polyfoam type, it look like concrete also because cement cover it what? pretty easy to install if u know how to fix ikea wall rack smile.gif
TSiwubpreve
post Jan 20 2016, 12:40 PM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(Armata @ Jan 20 2016, 11:16 AM)
TS, currently my balcony is empty without any fencing...i plan to cement the balcony floor, then put up a simple glass fence around it..

how much this should costs usually? size around 2.5 cars side by side width...

and will this case water to seep into cement underneath? Coz below is plaster ceiling...
*
balcony no fencing? so dangerous 1?
TSiwubpreve
post Jan 20 2016, 12:42 PM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(Zaszo @ Jan 18 2016, 10:25 PM)
Hi,what can you tell about career prospect for civil engineering technology.i know this engineering technology  still new in malaysia but not for europe.
*
what is new? I think if Europe adopt and very effective soon malaysia will adopt it quickly if it's much cost efficient also biggrin.gif
TSiwubpreve
post Jan 20 2016, 12:44 PM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(Pewufod @ Jan 20 2016, 12:39 PM)
hi sifu

want to ask

is it common practice for the clerk of work to sign DO?

in this case its DO for rebar/brc

but i would like to know generally should they sign for DO of any nature
*
DO sign by main contractor for the purpose of the supplier claim from u. clerk of work sign more on acknowledgement of the rebar had come to site. perhaps that 1 can be used to claim material on site
TSiwubpreve
post Jan 20 2016, 12:47 PM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(Armata @ Jan 20 2016, 12:44 PM)
got 1 small fencing..but want to extend..

like this example..current one is only this, i wanna extend out to cover whole balcony :
user posted image
*
ic. bro u need to get PE to submit application to local authority. plus the roof slab outside balcony cannot cater sufficient load because original not design for balcony. need to reconstruct according to new design from the professional engineer. 10k to 20k I think total cost
TSiwubpreve
post Jan 20 2016, 12:57 PM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(Pewufod @ Jan 20 2016, 12:54 PM)
thank u si fu for reply

yes

main con ad sign

but now main con also request cow to sign as vertification

generally no issue right ?
*
no issue. the COW also need to verify the rebar is approved & as accordance to spec. 1. COW should be from structural engineer representative.
TSiwubpreve
post Feb 18 2016, 05:27 PM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(mineral @ Feb 18 2016, 04:56 PM)
Hello. Need some advise. I've collected the keys to my new house but I noticed a significant different on the actual layout (with dimension) compare with on S&P - there are more horizontal and vertical pillars in the unit. Think the developer short change me.
*
how big it vary?
TSiwubpreve
post Feb 18 2016, 06:40 PM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(5p3ak @ Feb 18 2016, 06:36 PM)
Which type of flooring is most resistant to scratches/wear? Wanna change my house floor from linoleum type to something more resistant.
*
carpet? sure resistant to scratch biggrin.gif
TSiwubpreve
post Feb 18 2016, 07:15 PM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(5p3ak @ Feb 18 2016, 06:56 PM)
Dust leh hard to clean if something spills? unsure.gif
*
need vacuum lo. use dyson should be fine smile.gif
TSiwubpreve
post Feb 18 2016, 11:33 PM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(mineral @ Feb 18 2016, 11:04 PM)
Apologise for the drawing. It's something as attached. I'm still trying to get the actual layout from the developer
*
u "horizontal pillar" is this is it?
user posted image

this is called beam. well S&P won't show this beam but it is normally there 1 la. the beam is wider and wall is less wider that's why u see that. developer didn't cheat u. smile.gif
TSiwubpreve
post Feb 19 2016, 06:45 AM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(mineral @ Feb 19 2016, 12:08 AM)
Hmm IC. How bout the extra pillar on the top right bout 1x1 feet?
*
that pillar hide in wall already since it's corner?
TSiwubpreve
post Feb 19 2016, 10:35 AM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(mineral @ Feb 19 2016, 09:51 AM)
It's exposed and taken up some space that suppose to cater for the kitchen cabinet. Headache le. Many thanks for your explaination
*
ur picture no show expose o. got real picture?
TSiwubpreve
post Feb 19 2016, 04:26 PM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(Perbaman @ Feb 19 2016, 03:37 PM)
i think the pillar/column is 1'x1', whereas the wall is 150mm, so maybe got half foot exposed column at the corner.
if you can "unsee" the beam drawn, can imagine there's a 'kink' at the corner
*
oic. should draw out the "kink" ma sweat.gif
TSiwubpreve
post Feb 20 2016, 03:10 PM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(dps404 @ Feb 19 2016, 05:46 PM)
any idea why my screeding + hardener works  crack like no tomorrow after a month or so?

normally how do you guys rectify this problem?
*
need to redo bro. by hack off and rescreed again.

there could be many factor, like inappropriate mixture of cement sand water, poor workmanship, or weather
TSiwubpreve
post Feb 20 2016, 03:10 PM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(-SMK- @ Feb 20 2016, 12:58 PM)
my first floor house floor parquet is coming off. i have built in furniture in my rooms

what i can do to solve this? is there any solution other than change the whole floor parquet?
*
parquet stick back lo. sweat.gif
TSiwubpreve
post Feb 22 2016, 10:10 AM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(mt24 @ Feb 22 2016, 09:14 AM)
If my lantai bocor, orang bawah rumah ceiling got some watery stain, should i redo the proofing,retiling or any other cost savvy method to repair the leak?
*
u need bro. after dlp right? but not necessary need redo waterproofing and tiling. discuss v owner below, do the pressure grouting on the leaking spot will do from owner ceiling.
TSiwubpreve
post Feb 23 2016, 12:45 PM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(Julianc @ Feb 23 2016, 10:52 AM)
what IT solutions does construction industry need?
what is the painpoints related to IT?
*
yes. a lot. heard of bim?
TSiwubpreve
post Feb 24 2016, 12:25 PM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(zenix @ Feb 24 2016, 09:46 AM)
would making a concrete base with electric, water, communications connections for a 40ft container home be expensive?
*
expensive as in PE endorsement, local authority approval and etc.