Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed
14 Pages « < 4 5 6 7 8 > » Bottom

Outline · [ Standard ] · Linear+

Investment SETIA ECOHILL (VERSION 9), Inspiring Eco Township in Semenyih

views
     
treehill
post Aug 6 2014, 07:56 PM

Look at all my stars!!
*******
Senior Member
2,587 posts

Joined: Jul 2009


QUOTE(wen xuan @ Aug 6 2014, 05:35 PM)
RM0.00[SEH]Free MyFM 16th Bday bash concert tickets at Ecohill Welcome Centre. 2 tickets per unit perchased; 1st come 1st served while stocks last.0387242255
*
You went to take again?
treehill
post Aug 7 2014, 08:32 AM

Look at all my stars!!
*******
Senior Member
2,587 posts

Joined: Jul 2009


QUOTE(samkps @ Aug 6 2014, 11:03 PM)
Hehehe, FOC ticket for sure is those free seating one, dun think entitle for VIP seat though...  tongue.gif  tongue.gif
*
Then I got already. No need to go collect again 😜
treehill
post Aug 7 2014, 08:34 AM

Look at all my stars!!
*******
Senior Member
2,587 posts

Joined: Jul 2009


Btw, I think we wouldnt know the final outcome for precicnt 1 on the secuity aspect till VP. Guard house and fencing will sure on but still up to approval from authority. Apart from that the extra stuff that i asked about like boomgate or access card we wouldnt know till VP. Hopefully we can get all those... For those who brought the terrace house.
treehill
post Aug 10 2014, 06:22 AM

Look at all my stars!!
*******
Senior Member
2,587 posts

Joined: Jul 2009


QUOTE(wen xuan @ Aug 7 2014, 02:25 PM)
Don't know wor....may be last time within this 10km radius not yet develop gua, no such much residential project nearby.....in future don't know will it  bring up the smelt issue or not? hmm.gif I oso just realize about this factory since I purchase a unit in  Ecohill....haha.....more care about future staying environment ma... laugh.gif
*
Xuan jer, if in aircon room i think shld be ok and will not have smell gua biggrin.gif
Anyway, just hope those smell wont blow till SEH there.
treehill
post Aug 13 2014, 08:07 PM

Look at all my stars!!
*******
Senior Member
2,587 posts

Joined: Jul 2009


Today passed by lekas and can see some units from precicnt 3. Really quite near to lekas highway and is just like beside it only. Not sure they will put up a wall which is sound proof. Also, didnt realize that the small bridge to the super link side already done. Again quite near to lekas highway sweat.gif

Btw Bro Sam the Ecohill Lekas highway exit issit the exit for Bangi and Semenyih 1? Exit number 2102? If yes then is really near and really can save time and petrol compare to jln semenyih although need to pay RM1.10. smile.gif
treehill
post Aug 13 2014, 11:18 PM

Look at all my stars!!
*******
Senior Member
2,587 posts

Joined: Jul 2009


QUOTE(vislai @ Aug 13 2014, 09:52 PM)
Agreed.
if we look at the map from the masterplan, the house at precint 3 still got a gap between the units and lekas highway, but in reality, we can see it is really near, unlikely having the distance shown in the map.  hmm.gif
*
Yup, it is very near and the house can see clearly even when I was driving the opposite late (direction to kajang/semenyih). It shld be same situation for suoer llink If small road is not so bad but this 1 is highway. More cars will use this lekas once EM is ready. Anyway, from the master plan there will be trees planted to cover the houses. I uess that will take some time to grow too smile.gif
treehill
post Aug 13 2014, 11:19 PM

Look at all my stars!!
*******
Senior Member
2,587 posts

Joined: Jul 2009


QUOTE(wen xuan @ Aug 13 2014, 10:28 PM)
Yup. That's the one for Semenyih exit... biggrin.gif
*
Then the Lekas-Ecohill exit is very near. Really worth to pay RM1.10. Hopefully next year toll wont increase. sweat.gif
treehill
post Aug 14 2014, 11:03 PM

Look at all my stars!!
*******
Senior Member
2,587 posts

Joined: Jul 2009


QUOTE(samkps @ Aug 14 2014, 06:46 PM)
Bro treehill... Pistia units are up as well, no need to wait long...  rclxms.gif  rclxms.gif  rclxms.gif
*
Yeah, quite happy with the progress alhough is not my unit tongue.gif
Anyway, the progress pic from SEH website is quite clear. Cant wait to see the final product since pistia dont ewally havw a show unit.

Btw, i think most of the type they try to complete 1 full unit with painting and even alarm system installed. Could it be that they are using that to baseline for other units or is for SEH team to verify the work or for the buyers to get a chance to have a look at it first? Not familiar with Sp setia houses... Anyone can advise? icon_question.gif
treehill
post Aug 14 2014, 11:04 PM

Look at all my stars!!
*******
Senior Member
2,587 posts

Joined: Jul 2009


QUOTE(samkps @ Aug 14 2014, 11:00 PM)
Bro vislai.. sure have.. your unit is Errana?

Errana seems like progress very fast too..  rclxms.gif  rclxms.gif
*
Errana ks the fastest but overall precicnt speed is better which is superb! rclxms.gif
treehill
post Aug 14 2014, 11:05 PM

Look at all my stars!!
*******
Senior Member
2,587 posts

Joined: Jul 2009


QUOTE(samkps @ Aug 14 2014, 11:03 PM)
Plavia units...  thumbup.gif  thumbup.gif
*
TKJ punya! 2 biji somemore tongue.gif
treehill
post Aug 14 2014, 11:17 PM

Look at all my stars!!
*******
Senior Member
2,587 posts

Joined: Jul 2009


QUOTE(samkps @ Aug 14 2014, 11:15 PM)
Lol... please bear with me, SEH people taking the picture 20m away from the houses, I taking on the PARC, maybe 500m to 1km away.. So the picture quality not that good. I am using low resolution as well, easier for me to manipulate the files since the picture only merely ~ 1mb per piece..  tongue.gif  tongue.gif
*
Bro, I do appreciate it. Actually your pic consider very good already. I used my gf camera also similar quality and only managed to zoom that far sweat.gif
treehill
post Aug 14 2014, 11:18 PM

Look at all my stars!!
*******
Senior Member
2,587 posts

Joined: Jul 2009


QUOTE(vislai @ Aug 14 2014, 11:16 PM)
hrm...i noticed that the horizontal height of the house are getting lower towards our camera direction. The lands are not flat and the houses come with different height? Not Cantik laa like that... blush.gif
*
Maybe angle problem?
treehill
post Aug 15 2014, 08:03 AM

Look at all my stars!!
*******
Senior Member
2,587 posts

Joined: Jul 2009


QUOTE(vislai @ Aug 14 2014, 11:20 PM)
hrm...unlikely...angle problem wont cause this type of effect ler...height wo...
*
Then I not sure already tongue.gif
If Teng Siew is here maybe he can advice smile.gif
treehill
post Aug 15 2014, 08:06 AM

Look at all my stars!!
*******
Senior Member
2,587 posts

Joined: Jul 2009


QUOTE(robert82 @ Aug 15 2014, 02:05 AM)
wah, progressing fast, luckily reno money also progressing well too tongue.gif
*
Bro, you good lo... Me still long way to go. Still, I cant wait to see the completes unit coz mine dont have the show unit. Eager to see how it looks like in real thing.
treehill
post Aug 15 2014, 08:33 AM

Look at all my stars!!
*******
Senior Member
2,587 posts

Joined: Jul 2009


QUOTE(cutealex @ Aug 15 2014, 08:11 AM)
No worry....will be done soon...
*
Bro, any idea why they completed a single unit first for all the types? Is or their own referrence or is for SP SETIA to verify the quality?
treehill
post Aug 15 2014, 08:56 AM

Look at all my stars!!
*******
Senior Member
2,587 posts

Joined: Jul 2009


QUOTE(TT18 @ Aug 15 2014, 08:41 AM)
LOL ! Sure enuf or not ? Afterwards, people said cement naik, GST incoming, etc......habis liao  tongue.gif
On the serious side, perhaps can save a bit because exterior reno not allowed at SEH, right ?
*
For precinct 2 and 3 no renovation allowed. Precinct 1 no problem. Like u said, can save some money also since cant change anything from outside and cant extend too
treehill
post Aug 15 2014, 04:43 PM

Look at all my stars!!
*******
Senior Member
2,587 posts

Joined: Jul 2009


QUOTE(samkps @ Aug 15 2014, 04:10 PM)
Jom, makan buah...  rclxms.gif  rclxms.gif
*
Definitely going smile.gif
treehill
post Aug 16 2014, 07:18 AM

Look at all my stars!!
*******
Senior Member
2,587 posts

Joined: Jul 2009


QUOTE(Jasoncat @ Aug 15 2014, 06:32 PM)
BU around 2k? If translates to RM200+ psf, fair (great) deal smile.gif
*
Bro, 408K is pallida and is around 1.5K+ for the BU. Still the price is very reasonable.

Btw, why last time didnt consider SEH? Starting price for clustered semi-D only RM738K and with DIBS also. I think the BU is around 2.1K and land size is 36x78.

This post has been edited by treehill: Aug 16 2014, 07:21 AM
treehill
post Aug 16 2014, 09:53 AM

Look at all my stars!!
*******
Senior Member
2,587 posts

Joined: Jul 2009


QUOTE(calvinkschong @ Aug 16 2014, 09:51 AM)
Hi Sam, how about photos of Aquatilis?  notworthy.gif
*
Bro, while waiting for update from Sam gor maybe u can see the progress from the SEH website. It was put up on 11/08.
treehill
post Aug 16 2014, 07:06 PM

Look at all my stars!!
*******
Senior Member
2,587 posts

Joined: Jul 2009


QUOTE(samkps @ Aug 16 2014, 01:38 PM)
A little refresh..

SEH township is launched on 11/10/2013. No soft-launch or pre-launch or whatsoever for public units.

400 DSL + 300 Cluster/SemiD being snatched up within 3-4 hours.

This is the progress for about 10 months after launching.  thumbup.gif  thumbup.gif  thumbup.gif

So far, dun see any sign of slowing down even though LKS already left SPS. Overall, I believe LKS also wish SEH can be a great success too, as his 1089 acres of township development is just merely less than 500m from SEH. rclxms.gif  rclxms.gif  rclxms.gif
*
I 2nd to that. LKS already planned the 3 townships together so impossible they will let it fail. rclxms.gif

14 Pages « < 4 5 6 7 8 > » Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0634sec    0.35    7 queries    GZIP Disabled
Time is now: 6th December 2025 - 05:16 AM