QUOTE(jepakazoid_82 @ May 15 2013, 10:09 PM)
In the initial stage, Line 2 was proposed for Ampang to Port Klang. It would cover those areas not covered by KTM Komuter. But somehow, after the feasibility study done by SPAD, it was changed to the current alignment. It is hard for me to see the current alignment is feasible while the proposed one is not. They decided to drag a spur line from KJ LRT to Shah Alam or maybe Port Klang. How is that feasible? Investment [CONNECTIVITY] KVMRT 2 SG BULOH-PUTRAJAYA LINE, And also news about Circle Line
Aug 15 2013, 09:53 AM

Quote
0.0301sec
0.92
6 queries
GZIP Disabled