Welcome Guest ( Log In | Register )

3 Pages  1 2 3 >Bottom

Outline · [ Standard ] · Linear+

 MRT to Cyberjaya?

views
     
TSmascot_lim
post Apr 8 2013, 03:12 PM, updated 13y ago

Look at all my stars!!
*******
Senior Member
2,249 posts

Joined: Apr 2013


Any confirmation plan from government to extend the MRT to Cyberjaya?
SUStikaram
post Apr 8 2013, 03:15 PM

10k Club
********
All Stars
10,722 posts

Joined: Nov 2011
QUOTE(mascot_lim @ Apr 8 2013, 04:12 PM)
Any confirmation plan from government to extend the MRT to Cyberjaya?
*
pls check this domain website.

http://www.skyscrapercity.com/showthread.p...315795&page=114


http://www.skyscrapercity.com/showthread.p...102128&page=215

This post has been edited by tikaram: Apr 8 2013, 03:16 PM
Raffy
post Apr 9 2013, 08:10 PM

Getting Started
**
Junior Member
291 posts

Joined: Aug 2011


maybe putrajaya also?
spydermind
post Apr 9 2013, 11:35 PM

Regular
******
Senior Member
1,166 posts

Joined: Dec 2010
in the realier plan, there is none.
accetera
post Apr 9 2013, 11:46 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


As I mentioned there, there is a plan. Still study.

Because Subang/Shah Alam ppl shud be given priority or not? Go there or go Cyber?
twincharger07
post Apr 10 2013, 12:21 AM

Look at all my stars!!
*******
Senior Member
4,788 posts

Joined: Feb 2011
QUOTE(mascot_lim @ Apr 8 2013, 03:12 PM)
Any confirmation plan from government to extend the MRT to Cyberjaya?
*
As of i now, there is no concrete confirmation on Cyber MRT..

However Map Guru HCS speculate that line to Putra/Cyber will be line 3, but line 3 only ends at Putrajaya ERL station.. He speculated that feeder bus will be used to ferry passengers from station to the rest of destination.. Maybe no MRT station at door step of some commercial area in Cyber..

user posted image
spydermind
post Apr 10 2013, 12:37 AM

Regular
******
Senior Member
1,166 posts

Joined: Dec 2010
although i dont like it...but i still dont think it will have MRT in Cyber within the first 3 lines , by the way, expect at least 6-8 years for that to be realized.
ecin
post Apr 10 2013, 10:24 AM

location
*******
Senior Member
5,857 posts

Joined: Dec 2010
QUOTE(spydermind @ Apr 10 2013, 12:37 AM)
although i dont like it...but i still dont think it will have MRT in Cyber within the first 3 lines , by the way, expect at least 6-8 years for that to be realized.
*
+1
37 Exposures
post Apr 10 2013, 10:35 AM

Regular
******
Senior Member
1,593 posts

Joined: Jul 2012
Why want to build MRT instead of LRT to increase the cost of construction? Not necessary to do that..
twincharger07
post Apr 10 2013, 10:42 AM

Look at all my stars!!
*******
Senior Member
4,788 posts

Joined: Feb 2011
QUOTE(37 Exposures @ Apr 10 2013, 10:35 AM)
Why want to build MRT instead of LRT to increase the cost of construction? Not necessary to do that..
*
bro, how much different between building MRT and LRT? hmm.gif
TSmascot_lim
post Apr 10 2013, 11:58 AM

Look at all my stars!!
*******
Senior Member
2,249 posts

Joined: Apr 2013


QUOTE(37 Exposures @ Apr 10 2013, 10:35 AM)
Why want to build MRT instead of LRT to increase the cost of construction? Not necessary to do that..
*
Yeah, i think that is not much difference for the construction cost compare in between LRT and MRT.....unless they goes underground, which i don't think is possible and feasible to have underground MRT/LRT project in cyberjaya....
37 Exposures
post Apr 10 2013, 01:00 PM

Regular
******
Senior Member
1,593 posts

Joined: Jul 2012
QUOTE(mascot_lim @ Apr 10 2013, 11:58 AM)
Yeah, i think that is not much difference for the construction cost compare in between LRT and MRT.....unless they goes underground, which i don't think is possible and feasible to have underground MRT/LRT project in cyberjaya....
*
Construction cost for floor carpark or basement carpark which one more costly?

Construction cost of MRT such as drilling, retaining wall..more costly than LRT

This post has been edited by 37 Exposures: Apr 10 2013, 06:04 PM
HELLO HELLO
post Apr 10 2013, 02:12 PM

Look at all my stars!!
*******
Senior Member
5,436 posts

Joined: Jan 2011
QUOTE(37 Exposures @ Apr 10 2013, 10:35 AM)
Why want to build MRT instead of LRT to increase the cost of construction? Not necessary to do that..
*
We need MRT more than LRT. MRT higher Capacity compare to LRT.
you can see almost everything from here:

http://www.spad.gov.my/sites/default/files...110913-v1.0.pdf

page 45 and page 46

mrt to cyberjaya/putrajaya is after 2020....still long long way to go.

fyi, some people always try to compare the cost of MRT with bullet train..totally different thing...1 of the different is MRT need many many stations.
bullet train need a few stations. example from penang to singapore in-between maybe only 4 to 5 stops/stations.

This post has been edited by HELLO HELLO: Apr 10 2013, 02:22 PM
37 Exposures
post Apr 10 2013, 05:34 PM

Regular
******
Senior Member
1,593 posts

Joined: Jul 2012
QUOTE(HELLO HELLO @ Apr 10 2013, 02:12 PM)
We need MRT more than LRT. MRT higher Capacity compare to LRT.
you can see almost everything from here:

http://www.spad.gov.my/sites/default/files...110913-v1.0.pdf

page 45 and page 46

mrt to cyberjaya/putrajaya is after 2020....still long long way to go.

fyi, some people always try to compare the cost of MRT with bullet train..totally different thing...1 of the different is MRT need many many stations.
bullet train need a few stations. example from penang to singapore in-between maybe only 4 to 5 stops/stations.
*
Personally think that next MRT project will be in Penang Island or JB instead of CBJ..these two places need MRT more than CBJ
accetera
post Apr 10 2013, 05:57 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


MRT is needed... Malaysia is now regretting that it built the Kelana Jaya Line on a LRT instead of MRT.

In the future traffic growth, KJ Line cannot be expanded anymore. Sad. Short sighted.
TSmascot_lim
post Apr 10 2013, 05:57 PM

Look at all my stars!!
*******
Senior Member
2,249 posts

Joined: Apr 2013


QUOTE(HELLO HELLO @ Apr 10 2013, 02:12 PM)
We need MRT more than LRT. MRT higher Capacity compare to LRT.
you can see almost everything from here:

http://www.spad.gov.my/sites/default/files...110913-v1.0.pdf

page 45 and page 46

mrt to cyberjaya/putrajaya is after 2020....still long long way to go.

fyi, some people always try to compare the cost of MRT with bullet train..totally different thing...1 of the different is MRT need many many stations.
bullet train need a few stations. example from penang to singapore in-between maybe only 4 to 5 stops/stations.
*
Wau, after 2020? in this case, since I was working in Pee Jay, then i think is a bit hard for me to travel from Cyberjaya to Pee Jay, as too tiring and quite jam LDP.... blush.gif blush.gif blush.gif cry.gif cry.gif cry.gif
TSmascot_lim
post Apr 10 2013, 06:50 PM

Look at all my stars!!
*******
Senior Member
2,249 posts

Joined: Apr 2013


QUOTE(37 Exposures @ Apr 10 2013, 05:34 PM)
Personally think that next MRT project will be in Penang Island or JB instead of CBJ..these two places need MRT more than CBJ
*
Yeah, in fact, i think MRT is more feasible to be implemented in Penang, instead of constructing Monorail in Penang, which is not feasible at all, due to a numbers of factors too....
TSmascot_lim
post Apr 10 2013, 06:52 PM

Look at all my stars!!
*******
Senior Member
2,249 posts

Joined: Apr 2013


QUOTE(accetera @ Apr 10 2013, 05:57 PM)
MRT is needed... Malaysia is now regretting that it built the Kelana Jaya Line on a LRT instead of MRT.

In the future traffic growth, KJ Line cannot be expanded anymore. Sad. Short sighted.
*
What to do bro? this is how our government working now...They are short-sighted and incapable, and yet, they will never admit for their mistake.....

Hope this time all Malaysians can use their rights to cast a better formation of government for the sake of Malaysian brilliant future....
twincharger07
post Apr 10 2013, 07:34 PM

Look at all my stars!!
*******
Senior Member
4,788 posts

Joined: Feb 2011
QUOTE(37 Exposures @ Apr 10 2013, 01:00 PM)
Construction cost for floor carpark or basement carpark which one more costly?

Construction cost of MRT such as drilling, retaining wall..more costly than LRT
*
i agree with Accetera,, we should hav MRT in the 1st place,,,
The LRT extension for Ampang n Kelana line is just the next best solution,,
for new line, MRT is the way to go, n glad they took the step
propertybbb
post Apr 10 2013, 08:12 PM

Look at all my stars!!
*******
Senior Member
2,663 posts

Joined: Feb 2013
Cyber already has erl....st to kl sentral..why need mrt? Within ciber u hav dedicated shuttle bus or feeder bus system..no jam whoa

This post has been edited by propertybbb: Apr 10 2013, 08:15 PM

3 Pages  1 2 3 >Top
 

Change to:
| Lo-Fi Version
0.0192sec    0.22    5 queries    GZIP Disabled
Time is now: 9th December 2025 - 05:35 AM