got the letter.. confirm my row is only the next 10% billing. i think different rows have different stage of construction, as shown by the pictures posted earlier. as far as i remember, IJM tendered the job to 3 different contractors, so 3 contractors are doing their best to outdo each other now, with different rate of progress.. so i believe those who got billed 25% got an efficient contractor.. lol
Investment BANDAR RIMBAYU | CHIMES | PERRENIA | PERIWINKLE, RM11bil Landed DSL Township kickstart
Jun 5 2013, 09:46 PM
Quote
0.1970sec
0.30
7 queries
GZIP Disabled