QUOTE(Krools @ Aug 12 2014, 11:39 AM)
FIT COMMENCEMENT DATE 29/09/2014
*
FiTCD means the date when your system is already installed and ready for TNB to come and Test & Commission the PV system if it passes the tests. Only then the PV system is connected to the TNB grid.
arjunaidi
post Aug 12 2014, 04:09 PM

Getting Started
**
Junior Member
150 posts

Joined: Jul 2012
I successfully applied for capacity expansion of 1.0 kWp to add to my present 2.45 kWp capacity. This info is captured in SEDA capacity listing. 1.0 kW= 4 pieces of 250W panels. that's all the usable space i got on my roof.

Installation is scheduled 09 Sep 2014.


Attached thumbnail(s)
Attached Image
arjunaidi
post Aug 12 2014, 04:35 PM

Getting Started
**
Junior Member
150 posts

Joined: Jul 2012
QUOTE(Krools @ Aug 12 2014, 04:17 PM)
I just received a call n confirmation email that my system will be install next Friday, 22 August...

hehehe already fill up cuti form...
*
don't forget to apply leave on T&C date. You want to be present to sign acceptance that your PV system meter is ready to count the money TNB ought to pay you :-)

oh..take lotsa photos and show it here, just like in the wrist watch forums they like to share their new watches :-)

This post has been edited by arjunaidi: Aug 12 2014, 04:37 PM
arjunaidi
post Aug 12 2014, 05:15 PM

Getting Started
**
Junior Member
150 posts

Joined: Jul 2012
QUOTE(Krools @ Aug 12 2014, 05:04 PM)
Noted bro...

thanks for the headup...

but i shy shy to show my house la haha
*
show panels, inverter only meh :-)
arjunaidi
post Aug 13 2014, 03:34 PM

Getting Started
**
Junior Member
150 posts

Joined: Jul 2012
QUOTE(Screwu829 @ Aug 13 2014, 01:21 PM)
Free therapy from passing by bro arjunaidis place? Cool bro.
*
ahhh...it's therapeutic for me to know that I have received RM4,000+ from TNB since commissioning in July 2013 :-)

not bad for a small 2.45kWp system..


Attached thumbnail(s)
Attached Image
arjunaidi
post Aug 14 2014, 05:13 PM

Getting Started
**
Junior Member
150 posts

Joined: Jul 2012
QUOTE(shagalot @ Aug 14 2014, 04:31 PM)
Your capacity expansion follow current rate or your original rate?
*
the additional capacity follows 2014 rate, i.e. RM1.0184 basic+ RM0.2153 bonus rate = RM1.2337 per kWh (10% degression over 2013.

the existing capacity follows 2013 rate, i.e. RM1.1316 basic+ RM0.2392 bonus rate = RM1.3708 per kWh.

My SI will install the new capacity as a new system, separate fro the existing PV system. The 1kWp system will have 4 panels connected to a new inverter and these are connected to a new Renewable Energy meter.

Therefore, I will have 2 RE meters, one recording the output from the existing 2.45 kWp system and another RE meter recording the output from the new 1 kWp system. I will receive two sets of Payment Advice each montj.

i will document this solar capacity expansion episode when it happens.
arjunaidi
post Aug 19 2014, 05:17 PM

Getting Started
**
Junior Member
150 posts

Joined: Jul 2012
Hello. There is a website for sharing info on solar matters at www.sunnyplaces.com

follow me there :-)
arjunaidi
post Aug 19 2014, 05:18 PM

Getting Started
**
Junior Member
150 posts

Joined: Jul 2012
Hello. There is a website for sharing info on solar matters at www.sunnyplaces.com

follow me there :-)


Attached thumbnail(s)
Attached Image
arjunaidi
post Aug 20 2014, 05:38 PM

Getting Started
**
Junior Member
150 posts

Joined: Jul 2012
Hello,

I have a business associate looking for a Technical Sales Engineer. Write to me with your resume. Confidentiality assured.

arjunaidi@gmail.com
arjunaidi
post Dec 12 2014, 12:14 PM

Getting Started
**
Junior Member
150 posts

Joined: Jul 2012
Hello all,

May I know how many days have lapsed since the Testing & Commissioning date and payment of the Solar FiT to your account?

It seems that TNB is having some problem with the first Payment Advice which resulted in cancellation of the Payment Advice.

Onec they iron out that problem, you can expect the payment within 21 calendar days.


arjunaidi
post Jan 28 2015, 12:32 AM

Getting Started
**
Junior Member
150 posts

Joined: Jul 2012
QUOTE(acidrock2464 @ Dec 17 2014, 12:23 PM)
Hi, just got my 4kwp T&C at 4 Dec. Don't have any monitoring system, so I just look at the TNB RE meter. Currently now at 153 kW. Do I read it right? And normally how long do u guys wait from T&C to your 1st payment?
*
Hi here acidrock. congrats on successful commissioning. Yes, you are correct reading the TNB METER at 153 kWh .

Upon TNB making the first meter reading as notified by the Payment Advice, you can expect to get your payment banked into your account after 21 days of the date of the Payment Advice.

Pls let me know if you have not received the payment.

cheers,

arjunaidi

arjunaidi
post Mar 13 2015, 03:37 PM

Getting Started
**
Junior Member
150 posts

Joined: Jul 2012
My company did not get the 425 kW quota. grrr...i hate this balloting process, it is pure luck, =gambling. Nothing to do with my merits for technical skills, management capability etc.


Attached thumbnail(s)
Attached Image
arjunaidi
post May 13 2015, 12:24 PM

Getting Started
**
Junior Member
150 posts

Joined: Jul 2012
Hello all,

TNB RE's explanation for the delay in April FiT payment:
===================================
Utk makluman tuan, pada bulan april ’15, sistem tnb sedang dalam proses upgrade bagi pelaksanaan gst

Oleh itu invoice yang telah dicreate terpaksa direject

Pihak kawasan akan lakukan reading seperti jadual utk kawasan ini sekitar 15hb

Jeneration tuan utk april’15 akan dikira sekali dalam bulan mei 15 ini

Harap tuan boleh bersabar dan pihak kami mohon maaf atas kesulitan yang timbul

Sekian, tmksh

=====================
arjunaidi
post May 14 2015, 04:13 PM

Getting Started
**
Junior Member
150 posts

Joined: Jul 2012
shag, what do you mean "merge"?

I have two accounts, one for viewing my electricity consumption and one for viewing the solar power generation.
arjunaidi
post May 29 2015, 10:54 AM

Getting Started
**
Junior Member
150 posts

Joined: Jul 2012
QUOTE(GreenEnergy @ May 27 2015, 11:59 AM)
received it last week:-

my April payment advice RM1488.16

RM1488.16 /RM1.2089/ 30days/ 9kWp
=4.5928 hour/ day

last month yield a bit lower than MAR (5.0 hour/day)
*
greeneergy, that's a good yield. where is your location?

I get bteween 3.0 and 3.5 hours/day at Putrajaya.

arjunaidi
post Jun 3 2015, 11:10 AM

Getting Started
**
Junior Member
150 posts

Joined: Jul 2012
Interested to increase your installed capacity? I have done this successfully in 2014.

Now SEDA is making it official.
================================================

Putrajaya, SEDA Malaysia will be opening a special session to allow individual Feed-in Approval Holders of years 2011 up to 2013 an opportunity to increase their installed capacities up to the allowable maximum limit of 12 kW per address (limited to 2 addresses per individual). Details on the application procedure and related processes as well as documentation and timelines will be made available by Friday, 5th June 2015. Registered PV Service Providers are therefore advised to refrain from submitting any requests until then.


arjunaidi
post Jun 3 2015, 04:14 PM

Getting Started
**
Junior Member
150 posts

Joined: Jul 2012
QUOTE(shagalot @ Jun 3 2015, 11:21 AM)
With 2015 Tarif?
*
I have two separate solar circuits, two RE meters and one tariff at 2013 rate and one at 2014 rate. How cool is that? ;-)

arjunaidi
post Jun 4 2015, 10:24 AM

Getting Started
**
Junior Member
150 posts

Joined: Jul 2012
Icona,

the formula is

(monthly income from TNB)/FiT rate in RM per kWh/no of days/system capacity in kWh
arjunaidi
post Jun 5 2015, 03:18 PM

Getting Started
**
Junior Member
150 posts

Joined: Jul 2012
Friday, 5 June 2015

Putrajaya, SEDA Malaysia is opening a special session to allow Individual Feed-in Approval Holders of years 2011 up to 2013 an opportunity to increase their installed capacities up to the allowable maximum limit of 12 kW per address (limited to 2 addresses per individual).

To request for increase of installed capacity of Solar PV (Individual) FiAs, Individual Feed-in Approval Holders of years 2011 up to 2013 are required to submit your request using this "Request to Increase Capacity of Solar PV (Individual) FiA" Application Form. All requests must be submitted to SEDA Malaysia office not later than 30 June 2015. Detail procedure and related processes as well as documentation and timelines for this Request to Increase Installed Capacity is detailed in this Process Flow for Application to Increase Capacity document.

Registered PV Service Providers are advised to fully understand all the rules and requirements under the RE Act before submitting any request.



Sustainable Energy Development Authority Malaysia
arjunaidi
post Aug 24 2015, 05:23 PM

Getting Started
**
Junior Member
150 posts

Joined: Jul 2012
SEDA announces availability of Net Energy Metering from 2016

http://seda.gov.my/?omaneg=000101000000010...000&y=45&s=4984

8 Pages « < 5 6 7 8 >Top
 

Change to:
| Lo-Fi Version
0.0493sec    0.38    7 queries    GZIP Disabled
Time is now: 24th December 2025 - 06:58 AM