QUOTE(Glcotan @ Sep 22 2013, 07:34 AM)
yes, was in fair, perhaps released unitsThis post has been edited by ecin: Sep 22 2013, 03:02 PM
Investment Maxim Residences @ Cheras KL
|
|
Sep 22 2013, 03:02 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,857 posts Joined: Dec 2010 |
|
|
|
|
|
|
Sep 23 2013, 12:12 PM
|
![]() ![]() ![]() ![]()
Senior Member
574 posts Joined: Aug 2011 |
QUOTE(ecin @ Sep 22 2013, 03:02 PM) Some buyers have some misunderstanding or wrong pereptions that this project is within walking distance to MRT station.but with 400psf, it still looks like a steal for early buyers............ ecin boss, what's the selling price for those dropped units? |
|
|
Sep 23 2013, 12:16 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,857 posts Joined: Dec 2010 |
QUOTE(keneeth111 @ Sep 23 2013, 12:12 PM) Some buyers have some misunderstanding or wrong pereptions that this project is within walking distance to MRT station. 450psf if I remember correctly .. 12.5% already, very goodbut with 400psf, it still looks like a steal for early buyers............ ecin boss, what's the selling price for those dropped units? P/S: I'll be out from this thread till no date, kena shoot if not |
|
|
Sep 23 2013, 02:23 PM
|
![]() ![]() ![]() ![]()
Senior Member
650 posts Joined: Jan 2003 |
It's actually within walking distance in the future. Have to walk through accolade, tunnel/pedestrian bridge then phoenix plaza and cross the highway.
Estimate 15-25 minutes when all the amenities are available |
|
|
Sep 23 2013, 02:30 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,612 posts Joined: Jan 2009 |
QUOTE(iamWill @ Sep 23 2013, 02:23 PM) It's actually within walking distance in the future. Have to walk through accolade, tunnel/pedestrian bridge then phoenix plaza and cross the highway. it is called treacherous walk....and upslope sumore. Estimate 15-25 minutes when all the amenities are available |
|
|
Sep 23 2013, 02:57 PM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
986 posts Joined: Jul 2006 From: Naboo |
|
|
|
|
|
|
Sep 23 2013, 03:01 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,612 posts Joined: Jan 2009 |
QUOTE(babana @ Sep 23 2013, 02:57 PM) well, that is if the proposed link bridge on the 5th floor doesnt materialise. in terms of it eventuating...only time will tell As of now, we can hear commitment to build linkbridge from Level 5 to Accolade. Anything beyond that is not confirmed or known......I will try to foresee it will come...imagine many people using that road for walking and no safe pedestrian walking paths.... Who foot the bill? Local council or developer??? |
|
|
Sep 23 2013, 11:37 PM
|
![]() ![]() ![]() ![]()
Senior Member
650 posts Joined: Jan 2003 |
|
|
|
Sep 23 2013, 11:43 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,612 posts Joined: Jan 2009 |
|
|
|
Sep 23 2013, 11:59 PM
|
![]() ![]() ![]() ![]()
Senior Member
650 posts Joined: Jan 2003 |
|
|
|
Sep 24 2013, 09:00 AM
|
![]() ![]()
Junior Member
220 posts Joined: Jun 2013 |
|
|
|
Sep 24 2013, 02:54 PM
|
![]() ![]() ![]() ![]()
Senior Member
650 posts Joined: Jan 2003 |
i went to the site itself. the engineer/contractor is kind enough to let me see the blueprint.
mini version of blueprint: click expand on the top right http://www.tenggarateguh.com/current-chera...;prettyPhoto/0/ |
|
|
Sep 24 2013, 09:10 PM
|
![]() ![]() ![]()
Junior Member
320 posts Joined: Aug 2010 |
QUOTE(iamWill @ Sep 24 2013, 03:54 PM) i went to the site itself. the engineer/contractor is kind enough to let me see the blueprint. Link not found...mini version of blueprint: click expand on the top right http://www.tenggarateguh.com/current-chera...;prettyPhoto/0/ |
|
|
|
|
|
Sep 24 2013, 09:33 PM
|
![]() ![]() ![]() ![]()
Senior Member
650 posts Joined: Jan 2003 |
http://www.tenggarateguh.com/current-chera...ntre-point.html
click on any of the "site plan" and "expand the image" on top right |
|
|
Sep 24 2013, 11:26 PM
|
![]() ![]()
Junior Member
171 posts Joined: May 2011 |
QUOTE(keneeth111 @ Sep 23 2013, 12:12 PM) Some buyers have some misunderstanding or wrong pereptions that this project is within walking distance to MRT station. Heard early buyer got lower than 400psf especially for those unit above size of 1k sfbut with 400psf, it still looks like a steal for early buyers............ ecin boss, what's the selling price for those dropped units? |
|
|
Sep 26 2013, 11:06 AM
|
![]()
Newbie
4 posts Joined: Sep 2013 |
If compare Maxim and Montena which 1 better, please advice and give some opinion. Thanks
|
|
|
Sep 26 2013, 12:14 PM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
986 posts Joined: Jul 2006 From: Naboo |
QUOTE(iamWill @ Sep 24 2013, 09:33 PM) http://www.tenggarateguh.com/current-chera...ntre-point.html eh, there's a proposed development of service apartments on the site as well? anyone has any news on this?click on any of the "site plan" and "expand the image" on top right |
|
|
Sep 27 2013, 10:46 AM
|
![]() ![]()
Junior Member
77 posts Joined: Sep 2013 |
|
|
|
Sep 27 2013, 12:34 PM
|
![]() ![]()
Junior Member
171 posts Joined: May 2011 |
|
|
|
Sep 27 2013, 01:28 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
6,549 posts Joined: Jan 2003 |
|
| Change to: | 0.0377sec
0.68
6 queries
GZIP Disabled
Time is now: 19th December 2025 - 09:39 PM |