a crew memeber of the joint inspection team patiently awaiting for acknowledgement after a power point was tested positive for electricity supply.
draining away water from a pail after all taps were tested positive for water supply. the pail is used to contain the running water from the taps so as to avoid wetting the bathroom, yard and kitchen floor areas.
as far as the unit interior is concerned, i opine that the workmanship cum finishing is definitely a notch above TZ that i had taken delivery of vp a year ago. joint inspection was assisted by the maintenance guys as well. the main con, jasmurni has put up an office at R2-9-10. brio could have been better had the main con paid more attention to painting (especially those units on 16th floor n above) n sps had chosen a more solid main door. defects liability period is a surprising 36 months.
view from master bedroom
'lake' view from balcony
the golden mile during rush hour [313mm]
koi kinrara, atmosfera (one of sbv's competitors some 3 yrs ago. not sure now coz soon it will be blocked by zefer hill) [425mm]
aerial view of sky bar [150mm]
closer view of pfcc. how u wish that u could just cross over to bdr puteri n the msc-certified pfcc anytime. indeed its so near yet so far.