QUOTE(Jusooh @ Oct 29 2012, 11:40 AM)
Great, I am from Phase 1 also. Planning to do the utilities deposit payment this week as well. Hopefully the bank releases the final disbursement soon...Denai Alam, A Place To Belong
Denai Alam, A Place To Belong
|
|
Oct 29 2012, 11:41 AM
Return to original view | Post
#41
|
![]() ![]()
Junior Member
96 posts Joined: Apr 2008 |
|
|
|
|
|
|
Nov 8 2012, 11:07 AM
Return to original view | Post
#42
|
![]() ![]()
Junior Member
96 posts Joined: Apr 2008 |
|
|
|
Nov 10 2012, 01:00 PM
Return to original view | Post
#43
|
![]() ![]()
Junior Member
96 posts Joined: Apr 2008 |
QUOTE(rebecks @ Nov 8 2012, 11:07 AM) Just got back from collecting my keys. Overall seems OK. However, here are some of the issues I have found within the space of 1.5 hours at the house: 1. Tile gaps 2. Some hollow tiles 3. Dirty walls [small patches], need a coat of paint 4. Two door locks were not useable 5. Water mark on outside top floor plaster ceiling 6. Some uneven paints, walls There is electricity but no water yet [water meter installed]. The house comes with a Grundfos CM3-5PC pump, Inovar laminated floorings and Kimgress tiles to name a few. Will revisit the house again tomorrow for another round of checks... This post has been edited by rebecks: Nov 10 2012, 01:06 PM |
|
|
Nov 10 2012, 09:31 PM
Return to original view | Post
#44
|
![]() ![]()
Junior Member
96 posts Joined: Apr 2008 |
QUOTE(feezar25 @ Nov 10 2012, 07:20 PM) Sorry for my noob q. What are the grade of this material? Are they high end product or cheapo ones? Just trying to understand what are U implying..thanks Not too sure on the grade of tiles and laminated flooring. But the pump is one of the popular ones recommended in the forum... |
| Change to: | 0.0477sec
0.77
7 queries
GZIP Disabled
Time is now: 13th December 2025 - 12:46 PM |