Outline ·
[ Standard ] ·
Linear+
Denai Alam, A Place To Belong
|
numbertwo
|
Jul 26 2012, 03:06 PM
|
|
I will need cctv in the house for sure.. one that has integrated email alert in the event of an intrusion happens... DA is an open concept design, eventhough with FL's so called 'single entry' concept I would like to see who is standing right infront of my main door now or even before the gate.. These CCTV lets you define the area which u think u want them to trigger an email to u... rough estimate, 2K for 3-4 high res. cameras with a 500GB central console..
|
|
|
|
|
|
numbertwo
|
Jul 26 2012, 03:17 PM
|
|
hmm...i wasn't sure i was told it is a Single Entry, or 'CAN BE TURNED into Single Entry'.. Darn if it is not ALREADY a single entry. When u said main road, is that the main road of DA or the FL's phase?
|
|
|
|
|
|
numbertwo
|
Jul 26 2012, 04:31 PM
|
|
Welcome..somehow b4 moving in I can already feel the harmony in this township...cheers all!
|
|
|
|
|
|
numbertwo
|
Jul 28 2012, 11:18 AM
|
|
QUOTE(feezar25 @ Jul 28 2012, 10:23 AM) when the people say the house size is 25"x75" for example..does that mean the 75" is including the porch?..I always thought its not included..that's the perimeter of the land you own..  from your gate till the perimeter fencing at the back i believe.
|
|
|
|
|
|
numbertwo
|
Jul 31 2012, 11:21 AM
|
|
Oh no, yes! A registered post arrived today from SD... I guess it's time for VP..
|
|
|
|
|
|
numbertwo
|
Jul 31 2012, 01:56 PM
|
|
QUOTE(SSS @ Jul 31 2012, 01:35 PM) Congrats!  by the way, is your unit phase 2? Yup..
|
|
|
|
|
|
numbertwo
|
Aug 1 2012, 10:23 AM
|
|
QUOTE(Riz Quattro @ Aug 1 2012, 10:12 AM) Yup, Got my letter yesterday as well. But I think its gonna be a few days for the financier to disburse the final amount before they sales office can issue the letter for us to collect the keys. Funny they only give give 14 days to get it all sorted out before absolving liability on the handover. yes, I found it strange too why only 14 days from the date of the letter.. .sounds to short isn't it.. I don't remember such a short notice from my previous purchases...
|
|
|
|
|
|
numbertwo
|
Aug 5 2012, 10:12 AM
|
|
QUOTE(Xai-V-iaX @ Aug 5 2012, 02:11 AM) I heard that the earlier phases got as much as RM65k as delay compensation from SD.....  Holly.....why don't they delay th P2 too lol...i can wait lol!
|
|
|
|
|
|
numbertwo
|
Aug 8 2012, 08:58 AM
|
|
QUOTE(xdaliv @ Aug 8 2012, 12:44 AM) Going to inspect my house tomorrow! Will be bringing personal QS and contractor. lets see what they say. Do update us again after the inspection? My bank has yet to disburse the final payment, so I guess DA won't let me sign the VP yet huh?
|
|
|
|
|
|
numbertwo
|
Aug 8 2012, 12:18 PM
|
|
For Fern lane II, a 2sty with land size > 2200sqf cost abt RM778K onwards... I'm not sure if this applies to Fern I too... Added on August 8, 2012, 12:25 pmQUOTE(Xai-V-iaX @ Aug 8 2012, 11:42 AM) Saw a posting for Fern Lane 22 x 105 going for RM950K. Any of our member's unit? Fern Lanea similar unit 22x100 cost a lot lesser here here... lol This post has been edited by numbertwo: Aug 8 2012, 12:25 PM
|
|
|
|
|
|
numbertwo
|
Aug 15 2012, 12:42 PM
|
|
Yea..wishing all neighbours who are celebrating Raya Selamat Hari Raya Aidilfitri!
|
|
|
|
|
|
numbertwo
|
Aug 23 2012, 04:53 PM
|
|
QUOTE(soph @ Aug 23 2012, 04:43 PM) Phase 1....havent collected my keys though. Will be collecting this weekend, any pointers what to look out for? Hi, welcome to the community! DA told me to wait for their clearance letter b4 calling them to arrange for collection... Is the the same thing for you?
|
|
|
|
|
|
numbertwo
|
Aug 23 2012, 05:05 PM
|
|
QUOTE(Xai-V-iaX @ Aug 23 2012, 05:00 PM) When are you planning to move in?  err..get the keys first bro...will think abt the 'moving' part later..
|
|
|
|
|
|
numbertwo
|
Aug 27 2012, 01:49 PM
|
|
I heard that klang has plenty of gangster contractors who warn outside contractors for getting jobs in their territories, does that happen in DA?
|
|
|
|
|
|
numbertwo
|
Aug 28 2012, 09:30 AM
|
|
I believe so long as the original architect drawing of our house, perimeter of the build-up area remains intact then we are OK.. Otherwise it has to get approval kot..
|
|
|
|
|
|
numbertwo
|
Sep 4 2012, 01:28 PM
|
|
There is a reason why in general perception the sand bricks are cheapo.. The price difference already determine its quality unfortunately... I don't believe sand brick is used in low cost apartment simply becoz it is harder to break, and I can hardly see any decent developer using clay bricks for those budget properties..
|
|
|
|
|
|
numbertwo
|
Sep 6 2012, 02:11 PM
|
|
just collected the key... why would SD gives me a foldable gate without the autogate system!?
|
|
|
|
|
|
numbertwo
|
Sep 6 2012, 02:58 PM
|
|
QUOTE(Xai-V-iaX @ Sep 6 2012, 02:45 PM) The fold-able gate has its con, the surface where the stainless steel (i hope it is s.s!) bar laid on the ground must be 99.9% flat, otherwise the motor will get koyak easily when the surface is not 100% flat and it has to use extra force to push the gate out....
|
|
|
|
|
|
numbertwo
|
Sep 6 2012, 03:06 PM
|
|
ekeke..i plan to use man-power, natural resources-manual push for the time being lol.
No idea yet xai.. hvn't got a time to think abt what I shud do on the house yet..hmm.
|
|
|
|
|
|
numbertwo
|
Sep 6 2012, 03:22 PM
|
|
the turf, roof top was a let down this morning!! I tot SD sold me the idea where I can play my remote control 4wd there!! And now it has been fenced up by that grill, even from the masterbed room...errrk!
|
|
|
|
|