> Ultimate Sg Buloh-Kajang MRT construction thread

views
     
TSKampung2005
post Feb 15 2014, 12:26 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(dps404 @ Feb 15 2014, 12:18 PM)
Lifting of TBM shield @ Pasar Rakyat Station
*
Thanks for your photo smile.gif Is it the same TBM which brokethrough on 9/1/2014 ?
dps404
post Feb 15 2014, 12:33 PM

On my way
****
Senior Member
596 posts

Joined: Sep 2013
QUOTE(Kampung2005 @ Feb 15 2014, 12:26 PM)
Thanks for your photo smile.gif Is it the same TBM which brokethrough on 9/1/2014 ?
*
yeap it is.

some of the gantries had already been lifted out too.
TSKampung2005
post Feb 16 2014, 12:29 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
https://www.facebook.com/MRTMalaysia/photos...?type=1&theater

Excavation on-going beneath the metro decking at the future Maluri MRT Station worksite.

user posted image
namh
post Feb 16 2014, 01:18 AM

Just a passerby
******
Senior Member
1,422 posts

Joined: Jan 2003
From: 192.168.0.100



no story about the pipe burst nearby the curve?
TSKampung2005
post Feb 16 2014, 09:41 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(namh @ Feb 16 2014, 01:18 AM)
no story about the pipe burst nearby the curve?
*
https://www.facebook.com/MRTMalaysia?flying...ster=ts&fref=ts

QUOTE
BURST WATER PIPE AT PERSIARAN SURIAN (UPDATE)
Kuala Lumpur, 15 February 2014 (6.00pm): Mass Rapid Transit Corporation Sdn Bhd (MRT Corp) wishes to provide further updates to the incident where a 900mm water pipe was damaged during MRT Project construction work.

As at 6.00pm today, traffic flow along Persiaran Surian and Jalan PJU 7/8, which were partially flooded from water flowing out from the damaged pipe, has returned to normal after flood water had completely receded.

The MRT Project Work Package Contractor for this section, Mudajaya Corporation Bhd with the help of the Fire and Rescue Services Department, managed to pump all water away into an existing stormwater pit nearby.

The roads were reopened after cleaning work was completed at about 3.00pm today.

Repair works for the damaged pipe has commenced and is being carried out by Syabas. It is understood that Syabas will issue a statement on the estimated time needed for the repair and the areas affected by the closure of the water pipe.

Preliminary investigations revealed that the damage to the pipe may have been caused by sheet piling activity being carried out for utility relocation to make way for the construction of an MRT pier.

Detailed investigations by MRT Corp, the Project Delivery Partner MMC Gamuda KVMRT (PDP) Sdn Bhd and Mudajaya Corporation Bhd will continue to determine the cause of the incident.

At 10.15am today, construction work for the MRT Project had resulted in a 900mm water pipe at Persiaran Surian being damaged and caused the intersection of Persiaran Surian and Jalan PJU 7/8 near the IPC Shopping Centre in Mutiara Damansara to be flooded.

Syabas was immediately notifed of the incident and they managed to turn off the pipe to stop the water from flowing out of the damaged pipe.

MRT Corp apologises for the incident and for the inconvenience caused. All efforts are being taken at this moment to ensure that the situation returns to normal as quickly as possible.


This post has been edited by Kampung2005: Feb 16 2014, 09:43 PM
TSKampung2005
post Feb 16 2014, 09:42 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
https://www.facebook.com/MRTMalaysia?flyingspaghettimonster=ts&fref=ts

Construction of the platform for the future Cochrane MRT Station progressing well.
user posted image
jonc88
post Feb 17 2014, 06:31 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Dunno about anyone else, but I think the Section 16 station looks a little weird in design. Too many columns there making it look messy.
5p3ak
post Feb 17 2014, 06:37 PM

CPE, FIG Certified Gymnastics Coach
*******
Senior Member
5,648 posts

Joined: Mar 2011
From: Jalan Tijani
QUOTE(dps404 @ Feb 15 2014, 12:18 PM)
» Click to show Spoiler - click again to hide... «

Lifting of TBM shield @ Pasar Rakyat Station
*
those cranes....

DAYUM!!! drool.gif
TSKampung2005
post Feb 17 2014, 10:53 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
https://www.facebook.com/photo.php?fbid=619...elevant_count=1

Footprint of former Klang Bus Station and UO Superstore: This will be the Pasar Seni Station - underground
user posted image
SUSGion
post Feb 17 2014, 11:04 PM

Getting Started
**
Junior Member
186 posts

Joined: Aug 2007
progress too slow at LDP, whenever I go to work, all cars have to cramp in between lanes from 2 lanes to 1 lane before flyover... How disappoint their progress it may take another year to complete from LDP crossover to 1 utama. I dont see any pillar construction opposite 1 utama yet.....
TSKampung2005
post Feb 19 2014, 10:33 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
https://www.facebook.com/mrtunderground?fref=ts

Inai 2( variable density tbm) was launched in Dec 2013 and is mining its way to Bukit Bintang. The pix shows the last and final installation of all the support gantries.

user posted image
TSKampung2005
post Feb 19 2014, 07:59 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Photo taken by dengilo

RRI Sungai Buloh

user posted imageuser posted imageuser posted imageuser posted image
user posted image
xproc
post Feb 20 2014, 08:46 PM

free for all
*******
Senior Member
4,470 posts

Joined: Sep 2007
From: Kuala Lumpur


QUOTE(sbs @ Feb 10 2014, 12:21 PM)
must be about same level with jln cheras . already 3 layer there, mrr2, jln cheras and roundabout below, superb engineering to contsruct the mrt track in between..btw when the work start expect super duper jam there.
*
just lower the gantry down....

nice thread... but why at /K/

This post has been edited by xproc: Feb 20 2014, 09:22 PM
TSKampung2005
post Feb 20 2014, 09:47 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(xproc @ Feb 20 2014, 08:46 PM)
just lower the gantry down....

nice thread... but why at /K/
*
That's because /k has the highest traffic wink.gif
TSKampung2005
post Mar 1 2014, 08:36 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Seksyen 16 station (28/2/2014)

Photos by dengilo

user posted image

user posted image

user posted image
TSKampung2005
post Mar 6 2014, 10:45 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
https://www.facebook.com/MRTMalaysia

View of the completed section of the tunnel for southbound trains from Inai Shaft towards Bukit Bintang.

user posted image
TSKampung2005
post Mar 10 2014, 11:24 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
https://www.facebook.com/MRTMalaysia?fref=ts

Preparation works for the relaunch of the Tunnel Boring Machine which will excavate the tunnel from KL Sentral MRT Station to Pasar Seni MRT Station.

user posted image
TSKampung2005
post Mar 13 2014, 05:50 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
https://m.facebook.com/media/set/?set=a.233...57132047&type=1

MRT achieved another milestone on the completion of the First Kilometre Elevated Guideway. The First Kilometre Guideway starts from Taman Industri Sg.Buloh Station located in RRI (Rubber Research Institute) ending just before the 65m special span across Jln Sg.Buloh (heading towards Kota Damansara. The elevated guideway via a launching girder was completed in end Jan 2014, after four challenging months of ground coordination with station works. – Photo by MMC- GAMUDA

user posted image

Three portal frames located at Maarof Interchange / SPRINT Highway has been completed as part of the construction of the future MRT Pusat Bandar Damansara Station. Comprehensive traffic management plan is currently being implemented to minimise inconvenience at this busy location as preparation is underway to launch the segmental box girders to form the elevated guideway and construction of the station building in 2014.

user posted image

The preparatory works for the excavation of a new underpass at the junction of Persiaran Surian and Persiaran Mahagony is advancing well. The monsoon drain (on the left of picture, along the grass) have been successfully realigned to accommodate the construction of new traffic lanes at Persiaran Surian as MRT piers and Dataran Sunway Station will be built in the road median.

user posted image

The construction of MRT Seksyen 16 Park n Ride Station is progressing well along SPRINT Highway. On-going works on portal frames, pile cap rebar and formwork for station and piers.

user posted image

Catering to MRT Sungai Buloh – Kajang Line and future MRT Line 2, the construction of Sungai Buloh Depot’s stabling yard and rolling stock building is moving smoothly.

user posted image


TSKampung2005
post Mar 14 2014, 11:47 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
January 2013 update by MRT Corp

http://mymrt.com.my/en/project-updates#prettyPhoto

SUNGAI BULOH KTM STATION

MRT pier construction near the north end of the line.
user posted image

Overall view of the Sungai Buloh Station Multistorey Park and Ride site.
user posted image

Construction work for the Sungai Buloh Station Multistorey Park and Ride in progress.
user posted image

JALAN SUNGAI BULOH-SUBANG, KAMPUNG BARU SUNGAI BULOH

MRT pier construction near Kampung Baru Sungai Buloh.
user posted image

MRT station and pier construction near Kampung Baru Sungai Buloh.
user posted image
TSKampung2005
post Mar 14 2014, 11:53 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
January 2013 update by MRT Corp

http://mymrt.com.my/en/project-updates#prettyPhoto

SUNGAI BULOH DEPOT

Waterproofing material being installed in the Rolling Stock Workshop.
user posted image

Fixing of steel bars for the pedestal at a pit being carried out inside the Rolling Stock Workshop.
user posted image

Installation of the steel frame for the bogie turntable in progress inside the Rolling Stock Workshop.
user posted image

View of the rolling stock building (right) and part of the covered stabling yard (left)
user posted image

View of sub-ballast work in front of the covered train stabling area. The Rolling Stock Building is located to the left of the stabling yard.
user posted image

Survey work being carried out on the train delivery slab.
user posted image

JALAN SUNGAI BULOH-SUBANG

Launch gantry constructing the MRT elevated guideway near the entrance to the Sungai Buloh Depot. As at the end of January, a total of 22 spans of the MRT guideway had been constructed by two launch gantries under Package V1.
user posted image

Launch gantry constructing the MRT elevated guideway. As at the end of January, a total of 22 spans of the MRT guideway had been constructed by two launch gantries under Package V1.
user posted image

Completed MRT elevated guideway (right) near the entrance to the Sungai Buloh Depot. As at the end of January, a total of 22 spans of the MRT guideway had been constructed by two launch gantries under Package V1.
user posted image

Aerial view of the future MRT station, provisionally called Kota Damansara.
user posted image