QUOTE(dps404 @ Feb 15 2014, 12:18 PM)
Thanks for your photo
Ultimate Sg Buloh-Kajang MRT construction thread
Ultimate Sg Buloh-Kajang MRT construction thread
|
|
Feb 15 2014, 12:26 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Feb 15 2014, 12:33 PM
|
![]() ![]() ![]() ![]()
Senior Member
596 posts Joined: Sep 2013 |
|
|
|
Feb 16 2014, 12:29 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
https://www.facebook.com/MRTMalaysia/photos...?type=1&theater
Excavation on-going beneath the metro decking at the future Maluri MRT Station worksite. ![]() |
|
|
Feb 16 2014, 01:18 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,422 posts Joined: Jan 2003 From: 192.168.0.100 |
no story about the pipe burst nearby the curve?
|
|
|
Feb 16 2014, 09:41 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(namh @ Feb 16 2014, 01:18 AM) https://www.facebook.com/MRTMalaysia?flying...ster=ts&fref=tsQUOTE BURST WATER PIPE AT PERSIARAN SURIAN (UPDATE) Kuala Lumpur, 15 February 2014 (6.00pm): Mass Rapid Transit Corporation Sdn Bhd (MRT Corp) wishes to provide further updates to the incident where a 900mm water pipe was damaged during MRT Project construction work. As at 6.00pm today, traffic flow along Persiaran Surian and Jalan PJU 7/8, which were partially flooded from water flowing out from the damaged pipe, has returned to normal after flood water had completely receded. The MRT Project Work Package Contractor for this section, Mudajaya Corporation Bhd with the help of the Fire and Rescue Services Department, managed to pump all water away into an existing stormwater pit nearby. The roads were reopened after cleaning work was completed at about 3.00pm today. Repair works for the damaged pipe has commenced and is being carried out by Syabas. It is understood that Syabas will issue a statement on the estimated time needed for the repair and the areas affected by the closure of the water pipe. Preliminary investigations revealed that the damage to the pipe may have been caused by sheet piling activity being carried out for utility relocation to make way for the construction of an MRT pier. Detailed investigations by MRT Corp, the Project Delivery Partner MMC Gamuda KVMRT (PDP) Sdn Bhd and Mudajaya Corporation Bhd will continue to determine the cause of the incident. At 10.15am today, construction work for the MRT Project had resulted in a 900mm water pipe at Persiaran Surian being damaged and caused the intersection of Persiaran Surian and Jalan PJU 7/8 near the IPC Shopping Centre in Mutiara Damansara to be flooded. Syabas was immediately notifed of the incident and they managed to turn off the pipe to stop the water from flowing out of the damaged pipe. MRT Corp apologises for the incident and for the inconvenience caused. All efforts are being taken at this moment to ensure that the situation returns to normal as quickly as possible. This post has been edited by Kampung2005: Feb 16 2014, 09:43 PM |
|
|
Feb 16 2014, 09:42 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
https://www.facebook.com/MRTMalaysia?flyingspaghettimonster=ts&fref=ts
Construction of the platform for the future Cochrane MRT Station progressing well. ![]() |
|
|
Feb 17 2014, 06:31 PM
|
![]()
Newbie
0 posts Joined: Oct 2012 |
Dunno about anyone else, but I think the Section 16 station looks a little weird in design. Too many columns there making it look messy.
|
|
|
Feb 17 2014, 06:37 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,648 posts Joined: Mar 2011 From: Jalan Tijani |
|
|
|
Feb 17 2014, 10:53 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
https://www.facebook.com/photo.php?fbid=619...elevant_count=1
Footprint of former Klang Bus Station and UO Superstore: This will be the Pasar Seni Station - underground ![]() |
|
|
Feb 17 2014, 11:04 PM
|
![]() ![]()
Junior Member
186 posts Joined: Aug 2007 |
progress too slow at LDP, whenever I go to work, all cars have to cramp in between lanes from 2 lanes to 1 lane before flyover... How disappoint their progress it may take another year to complete from LDP crossover to 1 utama. I dont see any pillar construction opposite 1 utama yet.....
|
|
|
Feb 19 2014, 10:33 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
https://www.facebook.com/mrtunderground?fref=ts
Inai 2( variable density tbm) was launched in Dec 2013 and is mining its way to Bukit Bintang. The pix shows the last and final installation of all the support gantries. ![]() |
|
|
Feb 19 2014, 07:59 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Feb 20 2014, 08:46 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,470 posts Joined: Sep 2007 From: Kuala Lumpur |
QUOTE(sbs @ Feb 10 2014, 12:21 PM) must be about same level with jln cheras . already 3 layer there, mrr2, jln cheras and roundabout below, superb engineering to contsruct the mrt track in between..btw when the work start expect super duper jam there. just lower the gantry down.... nice thread... but why at /K/ This post has been edited by xproc: Feb 20 2014, 09:22 PM |
|
|
Feb 20 2014, 09:47 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Mar 1 2014, 08:36 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Mar 6 2014, 10:45 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
https://www.facebook.com/MRTMalaysia
View of the completed section of the tunnel for southbound trains from Inai Shaft towards Bukit Bintang. ![]() |
|
|
Mar 10 2014, 11:24 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
https://www.facebook.com/MRTMalaysia?fref=ts
Preparation works for the relaunch of the Tunnel Boring Machine which will excavate the tunnel from KL Sentral MRT Station to Pasar Seni MRT Station. ![]() |
|
|
Mar 13 2014, 05:50 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
https://m.facebook.com/media/set/?set=a.233...57132047&type=1
MRT achieved another milestone on the completion of the First Kilometre Elevated Guideway. The First Kilometre Guideway starts from Taman Industri Sg.Buloh Station located in RRI (Rubber Research Institute) ending just before the 65m special span across Jln Sg.Buloh (heading towards Kota Damansara. The elevated guideway via a launching girder was completed in end Jan 2014, after four challenging months of ground coordination with station works. – Photo by MMC- GAMUDA ![]() Three portal frames located at Maarof Interchange / SPRINT Highway has been completed as part of the construction of the future MRT Pusat Bandar Damansara Station. Comprehensive traffic management plan is currently being implemented to minimise inconvenience at this busy location as preparation is underway to launch the segmental box girders to form the elevated guideway and construction of the station building in 2014. ![]() The preparatory works for the excavation of a new underpass at the junction of Persiaran Surian and Persiaran Mahagony is advancing well. The monsoon drain (on the left of picture, along the grass) have been successfully realigned to accommodate the construction of new traffic lanes at Persiaran Surian as MRT piers and Dataran Sunway Station will be built in the road median. ![]() The construction of MRT Seksyen 16 Park n Ride Station is progressing well along SPRINT Highway. On-going works on portal frames, pile cap rebar and formwork for station and piers. ![]() Catering to MRT Sungai Buloh – Kajang Line and future MRT Line 2, the construction of Sungai Buloh Depot’s stabling yard and rolling stock building is moving smoothly. ![]() |
|
|
Mar 14 2014, 11:47 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
January 2013 update by MRT Corp
http://mymrt.com.my/en/project-updates#prettyPhoto SUNGAI BULOH KTM STATION MRT pier construction near the north end of the line. ![]() Overall view of the Sungai Buloh Station Multistorey Park and Ride site. ![]() Construction work for the Sungai Buloh Station Multistorey Park and Ride in progress. ![]() JALAN SUNGAI BULOH-SUBANG, KAMPUNG BARU SUNGAI BULOH MRT pier construction near Kampung Baru Sungai Buloh. ![]() MRT station and pier construction near Kampung Baru Sungai Buloh. ![]() |
|
|
Mar 14 2014, 11:53 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
January 2013 update by MRT Corp
http://mymrt.com.my/en/project-updates#prettyPhoto SUNGAI BULOH DEPOT Waterproofing material being installed in the Rolling Stock Workshop. ![]() Fixing of steel bars for the pedestal at a pit being carried out inside the Rolling Stock Workshop. ![]() Installation of the steel frame for the bogie turntable in progress inside the Rolling Stock Workshop. ![]() View of the rolling stock building (right) and part of the covered stabling yard (left) ![]() View of sub-ballast work in front of the covered train stabling area. The Rolling Stock Building is located to the left of the stabling yard. ![]() Survey work being carried out on the train delivery slab. ![]() JALAN SUNGAI BULOH-SUBANG Launch gantry constructing the MRT elevated guideway near the entrance to the Sungai Buloh Depot. As at the end of January, a total of 22 spans of the MRT guideway had been constructed by two launch gantries under Package V1. ![]() Launch gantry constructing the MRT elevated guideway. As at the end of January, a total of 22 spans of the MRT guideway had been constructed by two launch gantries under Package V1. ![]() Completed MRT elevated guideway (right) near the entrance to the Sungai Buloh Depot. As at the end of January, a total of 22 spans of the MRT guideway had been constructed by two launch gantries under Package V1. ![]() Aerial view of the future MRT station, provisionally called Kota Damansara. ![]() |