QUOTE(sbs @ Feb 10 2014, 12:21 PM)
must be about same level with jln cheras . already 3 layer there, mrr2, jln cheras and roundabout below, superb engineering to contsruct the mrt track in between..btw when the work start expect super duper jam there.
just lower the gantry down.... nice thread... but why at /K/
This post has been edited by xproc: Feb 20 2014, 09:22 PM
Feb 20 2014, 08:46 PM

Quote
0.0283sec
0.78
7 queries
GZIP Disabled