QUOTE(jonc88 @ Dec 19 2012, 10:42 AM)
Yes, rebar is the correct word. If I'm not wrong, the Cheras section of contracts was actually released first?
Yes.The V5 and V6 contracts were awarded in January 2012. Both of these are in Cheras area.
Ultimate Sg Buloh-Kajang MRT construction thread
|
|
Dec 21 2012, 01:14 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Jan 5 2013, 03:38 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Jalan Cheras (5/1/2013)
![]() ![]() This post has been edited by Kampung2005: Mar 8 2013, 11:19 PM |
|
|
Jan 7 2013, 05:51 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Cheras-Kajang highway (7/1/2013)
![]() ![]() ![]() ![]() This post has been edited by Kampung2005: Mar 8 2013, 11:14 PM |
|
|
Jan 15 2013, 02:21 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Official progress update from MRT Corp website
January 2013 http://www.mymrt.com.my/projectUpdatesInfo.html Project map ![]() Northern - Elevated (1) SUNGAI BULOH DEPOT Vast worksite: Part of the former Rubber Research Institute land in Sungai Buloh being cleared for the main MRT depot ![]() (2) KOTA DAMANSARA Construction proceeding: Spun pile installation in progress near the future Kota Damansara MRT station. ![]() (3) SEKSYEN 16 Scenic: Aerial view of construction work going on along the strip of land between the Civil Service Golf Club and the Sprint Highway. ![]() (4) SEKSYEN 16 Tedious: Two workers hard at work construction a caission pile which are dug manually. ![]() |
|
|
Jan 15 2013, 02:27 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
10,912 posts Joined: Feb 2006 |
|
|
|
Jan 15 2013, 02:33 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Central - Underground
http://www.mymrt.com.my/projectUpdatesInfo.html (5) SEMANTAN PORTAL Transition point: Aerial view of the Semantan Portal where the MRT alignment moves from being elevated to underground. ![]() (6) KL SENTRAL Strengthening structures: Steel reinforcement bars being lowered into a trench for the construction of KL Sentral station’s diaphragm wall. ![]() (7) PASAR SENI Future station: The former Klang Bus Station, Plaza Warisan and Bangunan UO site will be the location of the future Pasar Seni MRT station. This station will be fully integrated with the existing Pasar Seni MRT station, seen here at the far end of the site. ![]() (8) MERDEKA Efficient digger: A machine called a vertical grabber digs trenches as deep as 30m for the construction of diaphragm walls at Merdeka station. ![]() (9) BUKIT BINTANG Diversion: Jalan Bukit Bintang is diverted to the front of Bukit Bintang Plaza and Yayasan Selangor to enable construction work for the Bukit Bintang underground MRT station. ![]() (10) PASAR RAKYAT Future link: Aerial view of the MRT station construction work in the middle of the future Tun Razak Exchange. ![]() (11) COCHRANE Deep excavation: The tunnel boring machine launch shaft being prepared at Cochrane where four tunnel boring machines will be launched. ![]() (12) MALURI Busy worksite: The worksite for the Maluri underground station is situated along the busy Jalan Cheras. ![]() |
|
|
Jan 15 2013, 02:49 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,676 posts Joined: Jan 2003 From: KL |
great project..cant wait for it
|
|
|
Jan 15 2013, 03:07 PM
|
![]() ![]() ![]()
Junior Member
388 posts Joined: Oct 2008 |
i like the progress
|
|
|
Jan 24 2013, 12:37 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Photos taken by sam79 (SSC Malaysia)
Bandar Kajang Station Site ![]() 20130123_162057 by suff79, on Flickr ![]() 20130123_162038 by suff79, on Flickr ![]() 20130123_162001 by suff79, on Flickr ![]() 20130123_162143 by suff79, on Flickr ![]() 20130123_162148 by suff79, on Flickr ![]() 20130123_162102 by suff79, on Flickr ![]() 20130123_161821 by suff79, on Flickr ![]() 20130123_161846 by suff79, on Flickr ![]() 20130123_161850 by suff79, on Flickr |
|
|
Jan 25 2013, 12:31 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Sprint Expressway
25/1/2013 ![]() This post has been edited by Kampung2005: Mar 8 2013, 11:09 PM |
|
|
Jan 26 2013, 08:23 AM
|
![]()
Newbie
0 posts Joined: Oct 2012 |
Finally seeing some progress that is visible along phase 1 of the project. Will be exciting once the viaducts are laid and stations start to go up.
|
|
|
Feb 17 2013, 02:21 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
17/2/2013
![]() This post has been edited by Kampung2005: Mar 8 2013, 11:06 PM |
|
|
Feb 17 2013, 02:25 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,058 posts Joined: Mar 2011 From: Today: 9:03 AM |
![]() Why don't they just contact me I'll just use this method to clear the rocks there. Few days we can finish the job already. |
|
|
Feb 18 2013, 08:16 PM
|
![]() ![]() ![]()
Junior Member
368 posts Joined: Oct 2012 From: Penang |
later people complain make so much noise, vibration. In Penang there was a hillside development and they use explosive and people always complain.
|
|
|
Feb 24 2013, 12:46 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Sprint Expressway (24/2/2013)
![]() ![]() ![]() This post has been edited by Kampung2005: Mar 8 2013, 11:03 PM |
|
|
Feb 24 2013, 12:53 PM
|
![]()
Junior Member
21 posts Joined: Jan 2012 |
|
|
|
Feb 24 2013, 01:05 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,494 posts Joined: Feb 2009 From: Kuala Lumpur Dataran Merdeka |
kampung , u went all place and take these photos ?
|
|
|
Mar 4 2013, 11:13 AM
|
![]() ![]() ![]()
Junior Member
376 posts Joined: Nov 2006 |
|
|
|
Mar 4 2013, 11:20 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,701 posts Joined: Oct 2010 From: Under your bed |
abang.. kenot see la. your potobuket expired d ah ?
|
|
|
Mar 4 2013, 11:22 AM
|
![]() ![]()
Junior Member
152 posts Joined: Oct 2006 |
kampung, cannot see your picture.
|
| Bump Topic Add ReplyOptions New Topic |
| Change to: | 0.0263sec
1.01
6 queries
GZIP Disabled
Time is now: 18th December 2025 - 11:43 AM |