Welcome Guest ( Log In | Register )

45 Pages « < 12 13 14 15 16 > » Bottom

Outline · [ Standard ] · Linear+

> Ultimate Sg Buloh-Kajang MRT construction thread

views
     
jonc88
post Apr 27 2013, 10:44 AM

New Member
*
Newbie
0 posts

Joined: Oct 2012


user posted image
https://fbcdn-sphotos-b-a.akamaihd.net/hpho...647764843_n.jpg

user posted image
https://fbcdn-sphotos-f-a.akamaihd.net/hpho...087717269_n.jpg

user posted image
https://fbcdn-sphotos-d-a.akamaihd.net/hpho...346398980_n.jpg

user posted image
https://fbcdn-sphotos-f-a.akamaihd.net/hpho...319281678_n.jpg

user posted image
https://fbcdn-sphotos-h-a.akamaihd.net/hpho...808567669_n.jpg

user posted image
https://fbcdn-sphotos-c-a.akamaihd.net/hpho...426456974_n.jpg

user posted image
https://fbcdn-sphotos-b-a.akamaihd.net/hpho...252713353_n.jpg

^^ Nice colour for the cutterhead. Not sure which machine this is. The orange and white one that has been assembled in Cochrane is machine S-774.

user posted image
https://fbcdn-sphotos-c-a.akamaihd.net/hpho...805961513_n.jpg

This post has been edited by jonc88: Apr 27 2013, 11:05 AM
TSKampung2005
post Apr 27 2013, 06:27 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
1 Utama (27/4/2013)

user posted image

user posted image
TSKampung2005
post Apr 29 2013, 02:01 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Bukit Bintang (28/4/2013)

user posted image

user posted image

user posted image
ycs
post Apr 29 2013, 09:11 AM

MEMBER
*******
Senior Member
4,232 posts

Joined: Jan 2003
From: Selangor



have the drilling started? will they update daily on the location of drill head?

want to avoid those areas in case sinkhole!
jonc88
post Apr 30 2013, 09:53 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Need help translating if possible: s-774 กำลังจะเดินทาง s-776 อยู่ในขั้นตอนการประกอบ

user posted image
https://fbcdn-sphotos-g-a.akamaihd.net/hpho...308989186_n.jpg

So it appears that the next machine from Cochrane towards Pasar Rakyat is S-776.

user posted image
https://fbcdn-sphotos-c-a.akamaihd.net/hpho...212406738_n.jpg

Source: https://www.facebook.com/profile.php?id=100...location=stream
cnvery
post May 1 2013, 12:43 AM

Regular
******
Senior Member
1,831 posts

Joined: Dec 2009

wow

tunneling will begin soon
TSKampung2005
post May 9 2013, 04:44 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
April 2013 update from MRT Corp

http://www.mymrt.com.my/en/project-updates

Elevated section

SUNGAI BULOH DEPOT

user posted image

SUNGAI BULOH CENTRALISED LABOUR QUARTERS

user posted image

RUBBER RESEARCH INSTITUTE (V1)

user posted image

user posted image

PERSIARAN SURIAN, KOTA DAMANSARA (V2)

user posted image

DAMANSARA-PUCHONG HIGHWAY, TAMAN TUN DR ISMAIL

user posted image

JALAN DAMANSARA, TAMAN TUN DR ISMAIL

user posted image

KGPA

user posted image

SPRINT HIGHWAY, MAAROF INTERCHANGE

user posted image
[Ancient]-XinG-
post May 9 2013, 04:46 PM

20k VIP club
*******
Senior Member
5,752 posts

Joined: Jan 2012
QUOTE(Kampung2005 @ Jul 31 2011, 12:22 AM)
Date : 29/7/2011
*
bila siap ? 2020 ?
TSKampung2005
post May 9 2013, 04:52 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
April 2013 update from MRT Corp

http://www.mymrt.com.my/en/project-updates

Elevated section

SRI SABAH FLATS, CHERAS

user posted image

TAMAN MIDAH

user posted image

TAMAN MIDAH (TESCO)

user posted image

BANDAR TUN HUSSEIN ONN

user posted image

user posted image

CHERAS-KAJANG HIGHWAY, CHERAS BATU SEBELAS

user posted image

CHERAS-KAJANG HIGHWAY, SUNGAI BALAK

user posted image

KAJANG DEPOT AND CENTRALISED LABOUR QUARTERS

user posted image

JALAN REKO, KAJANG

user posted image
TSKampung2005
post May 9 2013, 04:53 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(Ancient-XinG- @ May 9 2013, 04:46 PM)
bila siap ? 2020 ?
*
2016 and 2017.

Progress already 14%.

Tunneling will start this month.
TSKampung2005
post May 9 2013, 05:09 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
April 2013 update from MRT Corp

http://www.mymrt.com.my/en/project-updates

Underground section

SEMANTAN PORTAL

user posted image

KL SENTRAL MRT STATION

user posted image

PASAR SENI MRT STATION

user posted image

user posted image

MERDEKA

user posted image

BUKIT BINTANG MRT STATION

user posted image

user posted image

INAI LAUNCH SHAFT

user posted image

PASAR RAKYAT

user posted image

TSKampung2005
post May 9 2013, 05:09 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
COCHRANE

user posted image

MALURI MRT STATION

user posted image
maelzx
post May 9 2013, 05:19 PM

isha.my
*****
Senior Member
860 posts

Joined: Jan 2003
From: Kayangan
QUOTE(Kampung2005 @ Apr 5 2013, 01:47 PM)
KAJANG (JALAN REKO)

user posted image
*
This Jalan Reko.

I notice all the rumah kedai all vacant already and they start demolish. But what happen to the Masjid there ? I did not see any sign its going to be demolish ... So the Masjid going to stay?
TSKampung2005
post May 9 2013, 05:20 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(maelzx @ May 9 2013, 05:19 PM)
This Jalan Reko.

I notice all the rumah kedai all vacant already and they start demolish. But what happen to the Masjid there ? I did not see any sign its going to be demolish ... So the Masjid going to stay?
*
The mosque shall remain as it is.

Only the shophouses are being demolished.

This post has been edited by Kampung2005: May 9 2013, 05:20 PM
yinchet
post May 9 2013, 05:29 PM

If you wish for peace, prepare for war
Group Icon
Elite
1,157 posts

Joined: Jul 2008
From: Petaling Jaya

QUOTE(Kampung2005 @ May 9 2013, 05:20 PM)
The mosque shall remain as it is.

Only the shophouses are being demolished.
*
Is these confirm train design?
user posted image
TSKampung2005
post May 9 2013, 05:30 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(yinchet @ May 9 2013, 05:29 PM)
Is these confirm train design?
user posted image
*
Shape is confirmed according to MRT Corp biggrin.gif
yinchet
post May 9 2013, 05:32 PM

If you wish for peace, prepare for war
Group Icon
Elite
1,157 posts

Joined: Jul 2008
From: Petaling Jaya

QUOTE(Kampung2005 @ May 9 2013, 05:30 PM)
Shape is confirmed according to MRT Corp  biggrin.gif
*
so the design is not final yet?
I hope they going for wood theme

This post has been edited by yinchet: May 9 2013, 05:39 PM
hsienming
post May 9 2013, 05:34 PM

Homer
*****
Senior Member
963 posts

Joined: Apr 2007
From: Springfield


kamoung your job so nice always get to take pictures of the progress of MRT if you need an assistant let me know I can help u take pictures as well biggrin.gif
khelben
post May 9 2013, 05:39 PM

I love my mum & dad
*******
Senior Member
6,056 posts

Joined: Jan 2003
From: Suldanessellar



All these constructions are probably the cause of our frequent floods lately.

Not saying we shouldn't have MRTs or LRT extensions, but is there no way to improve the drainage?

Even for house/apartment/condo etc constructions the workers just throw all the stuff into the drain.
TSKampung2005
post May 10 2013, 02:04 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Photos are all taken by sam79 (SSC Malaysia)

user posted image
20130508_160039 by suff79, on Flickr
user posted image
20130508_160031 by suff79, on Flickr
user posted image
20130508_160035 by suff79, on Flickr

45 Pages « < 12 13 14 15 16 > » 
Bump Topic Add ReplyOptions New Topic
 

Change to:
| Lo-Fi Version
0.0281sec    0.29    6 queries    GZIP Disabled
Time is now: 15th December 2025 - 03:56 AM