Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

> Ultimate Sg Buloh-Kajang MRT construction thread

views
     
gjohn
post Aug 9 2012, 10:21 AM

Casual
***
Junior Member
388 posts

Joined: Oct 2008
quite fast the progress...hurm..
hope it all goes well
gjohn
post Jan 15 2013, 03:07 PM

Casual
***
Junior Member
388 posts

Joined: Oct 2008
i like the progress
gjohn
post Apr 1 2014, 10:19 AM

Casual
***
Junior Member
388 posts

Joined: Oct 2008
QUOTE(Kampung2005 @ Apr 1 2014, 06:55 AM)
February 2014 updates by MRT Corp

Source and link

http://mymrt.com.my/en/project-updates

INAI LAUNCH SHAFT

View of the Inai Lower Shaft where the temporary mortar fill is being hacked to enable the tunnel to be reached.
user posted image

View of the back tunnel of the Inai Upper Shaft, with the locomotive which is used to transport tunnel lining segments to the tunnel boring machine.
user posted image

View beneath the back-up gantries of the tunnel boring machine inside the completed section of the tunnel for southbound trains from Inai Shaft towards Bukit Bintang.
user posted image

View beneath the back-up gantries of the tunnel boring machine inside the completed section of the tunnel for southbound trains from Inai Shaft towards Bukit Bintang.
user posted image

The ventilation booster fan being installed in the Inai Upper Shaft. The fan will blow fresh air via the yellow tubing, seen here being lowered into the shaft, to the end of the tunnel.
user posted image

View of the back tunnel of the Inai Upper Shaft, with the locomotive which is used to transport tunnel lining segments to the tunnel boring machine.
user posted image

PASAR RAKYAT STATION

View of the northern end of the station box. As at the end of February, 84% of the station box, which is the deepest of seven underground stations, had been excavated.
user posted image

View of the southern end of the station box with the south-bound tunnel opening and the Cochrane 2 Tunnel Boring Machine being dismantled.
user posted image

Excavation work being carried out at the northern end of the station box. As at the end of February, 84% of the station box, which is the deepest of seven underground stations, had been excavated.
user posted image

Struts holding apart the retaining wall at the northern end of the station box.
user posted image
*
so the Pasara Rakyat Station/LRT station ..Pudu Sentral will be revitalised?or same as current??
gjohn
post Apr 1 2014, 02:20 PM

Casual
***
Junior Member
388 posts

Joined: Oct 2008
QUOTE(dps404 @ Apr 1 2014, 10:45 AM)
I believe you're referring to plaza rakyat?

don't think it's the same place.
*
oo...right..
maybe im wrong..huhuh
gjohn
post Apr 25 2014, 11:20 AM

Casual
***
Junior Member
388 posts

Joined: Oct 2008
whats the situation on the sinking soil in bukit bintang area??
any news..
gjohn
post Mar 5 2015, 05:24 PM

Casual
***
Junior Member
388 posts

Joined: Oct 2008
QUOTE(maelzx @ Jan 29 2015, 05:51 PM)
KAJANG MRT

[attachmentid=4322472]
21 JAN 2015

[attachmentid=4322474]
23 JAN 2015

[attachmentid=4322475]
27 JAN 2015

[attachmentid=4322476]
28 JAN 2015

[attachmentid=4322477]
29 JAN 2015
*
wow..

QUOTE(Kampung2005 @ Mar 5 2015, 05:19 PM)
4/3/2015

Around 1 Utama

user posted image

user posted image

user posted image

user posted image

user posted image
*
hurmmm

Bump Topic Add ReplyOptions New Topic
 

Change to:
| Lo-Fi Version
0.0157sec    0.84    7 queries    GZIP Disabled
Time is now: 18th December 2025 - 04:32 AM