quite fast the progress...hurm..
hope it all goes well
Ultimate Sg Buloh-Kajang MRT construction thread
Ultimate Sg Buloh-Kajang MRT construction thread
|
|
Aug 9 2012, 10:21 AM
Return to original view | Post
#1
|
![]() ![]() ![]()
Junior Member
388 posts Joined: Oct 2008 |
quite fast the progress...hurm..
hope it all goes well |
|
|
Jan 15 2013, 03:07 PM
Return to original view | Post
#2
|
![]() ![]() ![]()
Junior Member
388 posts Joined: Oct 2008 |
i like the progress
|
|
|
Apr 1 2014, 10:19 AM
Return to original view | Post
#3
|
![]() ![]() ![]()
Junior Member
388 posts Joined: Oct 2008 |
QUOTE(Kampung2005 @ Apr 1 2014, 06:55 AM) February 2014 updates by MRT Corp so the Pasara Rakyat Station/LRT station ..Pudu Sentral will be revitalised?or same as current??Source and link http://mymrt.com.my/en/project-updates INAI LAUNCH SHAFT View of the Inai Lower Shaft where the temporary mortar fill is being hacked to enable the tunnel to be reached. ![]() View of the back tunnel of the Inai Upper Shaft, with the locomotive which is used to transport tunnel lining segments to the tunnel boring machine. ![]() View beneath the back-up gantries of the tunnel boring machine inside the completed section of the tunnel for southbound trains from Inai Shaft towards Bukit Bintang. ![]() View beneath the back-up gantries of the tunnel boring machine inside the completed section of the tunnel for southbound trains from Inai Shaft towards Bukit Bintang. ![]() The ventilation booster fan being installed in the Inai Upper Shaft. The fan will blow fresh air via the yellow tubing, seen here being lowered into the shaft, to the end of the tunnel. ![]() View of the back tunnel of the Inai Upper Shaft, with the locomotive which is used to transport tunnel lining segments to the tunnel boring machine. ![]() PASAR RAKYAT STATION View of the northern end of the station box. As at the end of February, 84% of the station box, which is the deepest of seven underground stations, had been excavated. ![]() View of the southern end of the station box with the south-bound tunnel opening and the Cochrane 2 Tunnel Boring Machine being dismantled. ![]() Excavation work being carried out at the northern end of the station box. As at the end of February, 84% of the station box, which is the deepest of seven underground stations, had been excavated. ![]() Struts holding apart the retaining wall at the northern end of the station box. ![]() |
|
|
Apr 1 2014, 02:20 PM
Return to original view | Post
#4
|
![]() ![]() ![]()
Junior Member
388 posts Joined: Oct 2008 |
|
|
|
Apr 25 2014, 11:20 AM
Return to original view | Post
#5
|
![]() ![]() ![]()
Junior Member
388 posts Joined: Oct 2008 |
whats the situation on the sinking soil in bukit bintang area??
any news.. |
|
|
Mar 5 2015, 05:24 PM
Return to original view | Post
#6
|
![]() ![]() ![]()
Junior Member
388 posts Joined: Oct 2008 |
|
| Bump Topic Add ReplyOptions New Topic |
| Change to: | 0.0157sec
0.84
7 queries
GZIP Disabled
Time is now: 18th December 2025 - 04:32 AM |