i would like to ask if the house is already 20 years, is it advisable to change the roof or repaint the roof?

is it nowadays roof is not as good as the old days roof?
*
if your roof not in bad condition such as cracking etc, better repaint. For repaint old roof tile, to make your paint last longer advisable to remove the fungus on the roof tile first before (the fungus can be remove by spray water jet) repaint else the new paint will not stick long enough on the roof tile due to fungus. It depend on the fungus on your roof tile..if not so bad then can repaint without removing it.

Yes old roof tile is much better than today roof tile..

good luck.


Added on April 16, 2012, 10:25 am
QUOTE(redwindz @ Apr 15 2012, 02:05 AM)
Hi, Tomjason. I'm planning to renovate my house (fencing wall, kitchen, wall tile, floor tile,roof) and would like to learn more. Care to PM me the formula? Thanks
*
PMed you and others..


Added on April 16, 2012, 10:25 am
QUOTE(er650 @ Apr 13 2012, 05:41 PM)
wahh.. bro tomj, so many kaki request yr formula aredi, i so paiseh... anyway do u mind pm it to me too? .. he he thank you in advance... thumbs up to u
*
TQ..PMed you and others.


----------------------------------------------------------------------------------------------------------------------------------------------------------------------------

My common toilet pic...just DIY install my water heater on last saturday...

Attached Image

My Joven i70P at common toilet.....my master bedroom still not install yet cause quite busy now...
Attached Image

Below is my shower head..notice the flow of water from the shower head is good...all my toilet without using pump...i hv already mention tip before in the thread...how to have your plumbing without pump...the most important is the pipe size and combination of pipe size..

Attached Image

http://forum.lowyat.net/topic/2271767

------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Tips:

Kitchen Hood :

For me, i dont like to clean the oil on the grill of the hood, i not promoting any brand, try find hood that had auto clean function. With auto clean, i just pour the mixture of water and cleanser into the hood reservoir than push button clean, the system will auto clean and residue will go out into glass compartment. i love my hood so much.

This post has been edited by tomjason: Apr 24 2012, 01:24 PM


Attached thumbnail(s)
Attached Image
TStomjason
post Apr 16 2012, 10:37 AM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(tunemusic @ Apr 16 2012, 10:31 AM)
If repaint the roof of 20*25...roughly how much is the charges without paint?
Those paint used to paint roof...how much do they cost roughly?
*
For 20x25 If you hire indon worker..one worker can do it in one day (cost RM80)...but if you want to remove the fungus..at least 2 or 3 days for one worker.

Let say Nippon roof paint cost around RM90-RM100 (one year ago price). for your house you need 2 tins.

TQ
TStomjason
post Apr 16 2012, 02:14 PM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(tunemusic @ Apr 16 2012, 02:05 PM)
any good wooden door supplier/shop to recommend?
*
Door shop at Poh Yep Kinrara..a lot of choice and reasonable price.


Added on April 16, 2012, 2:15 pm
QUOTE(benjinfw @ Apr 16 2012, 01:32 PM)
Hi tomjason,
im planning to extent my kitchen together with level 1 (20'x10').
Could you share with me on your formula?
thanks
*
PMed you already.


This post has been edited by tomjason: Apr 16 2012, 02:15 PM
TStomjason
post Apr 16 2012, 03:20 PM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(tunemusic @ Apr 16 2012, 02:37 PM)
Is it advisable to get from those hardware shop?  sweat.gif  they also have grade A, B, C rite?
And the prices would be lower than those reputable supplier....
*
nope...not really...i hv checked...this door supplier is quite cheap....if you go to door supplier , they will measure for you and installed by their expertise..and the door is using spray and not hand painting....

below is my back door from Poh Yep

Attached Image

This door cost me RM688 inclusive all. Merpauh wood.

My reno , i order all from Poh Yep..4 nyatoh and one merpauh.


-------------------------------------------------------------------------------------------------------------------------------------------------------------------

Wiring Cable tips:


Below is the recommended wiring size:


Socket 2.5 mm
Air cond 2.5 mm
water heater 2.5 mm
Oven 4 mm (This is important)
DB to DB 16 mm
Lamp 1.5 mm

TQ

This post has been edited by tomjason: Apr 16 2012, 03:58 PM
TStomjason
post Apr 16 2012, 04:29 PM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(craftsnknots @ Apr 16 2012, 03:20 PM)
Tomjason, I just got another 2 contractor's quote since the last quotation which i shared with you cut throats. Do you mind to see see for me?
*
if within range of my calculation it ok....ok..you can share....


Added on April 16, 2012, 4:30 pm
QUOTE(VoteForPedro @ Apr 16 2012, 04:18 PM)
bro, need your formula as well. PM me ya. thanks!!
*
PMed you

This post has been edited by tomjason: Apr 16 2012, 04:30 PM
TStomjason
post Apr 19 2012, 12:16 PM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(ck6 @ Apr 18 2012, 05:54 PM)
Hi tomjason,

appreciate you pm me the secret formula too?

will start reno for my new house soon...
dont know how to start, needs advise n inputs
need help from all the sifu here.....
Thanks a lot.
*
PMed you
TStomjason
post Apr 19 2012, 12:26 PM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(scorpio80 @ Apr 19 2012, 12:16 PM)
hi tomjason

please pm me your secret formula...
plan to renovate my house...
thanks in advance & very appreciate..
*
PMed you
TStomjason
post Apr 19 2012, 03:20 PM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
tip:


Use this type of water trap (water outlet) for toilet, if you want beautiful instead normal water outlet.It is local made and the based for tile is from Stainless steel.

Attached Image


------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Hopefully with my knowledge,tips and formula sharing will benefits forumers for their renovation.

Adiouss


TStomjason
post Apr 24 2012, 11:36 AM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(meezan @ Apr 19 2012, 09:06 PM)
hi tom

your sharing info is really useful,how about toilet wastage, is that ok to use upvc one. What is the best brand for upvc you can recommended for me..tq
*
for toilet wastage, it still can use the white Upvc one..but request for Sirim approved (thick one).....but the best is upvc orange SIRIM for under ground....but expensive a little bit...but i would emphasis on this orange Upvc SIRIM else..if still want to use upvc white..please use Sirim approved (thicker).


Added on April 24, 2012, 11:36 am
QUOTE(Jars7818 @ Apr 21 2012, 05:17 PM)
Hello Bro Tomjason

Thank you for all your advice. Its really been enlightening. Can you PM me the formula too? Thank you
*
PMed you and others.


Added on April 24, 2012, 11:38 am
QUOTE(mav_850 @ Apr 22 2012, 11:17 PM)
semua orang mahukan formula... tom please post the formula here.. so we all can see... i also curious want to see.. biggrin.gif hehehe
*
PMed you and others...

i would rather send via PM..since there is also contractor is this forum that want cari makan.

This post has been edited by tomjason: Apr 24 2012, 11:39 AM
TStomjason
post Apr 24 2012, 01:43 PM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(HanzoRacing @ Apr 24 2012, 11:46 AM)
I going to start my house renovation soon. Can u pls PM me ur formula? It will be a great help to me

Thanks!
*
PMed you already.


---------------------------------------------------------------------------------------------------------------------------


Tips:


Selection of stop cock is also important to have good water volume. Many do not know this, even to some contractor. Select stop cock that can allow good water volume. Before buy the stop cock, turn on the stop cock tap and inspect that the 'hole' is big enough. Some stop cock, when turn on the tap, the 'hole' inside is small causing small water volume pass thru. Try find brand such as "VIP' that have good water volume. It doesnt matter what brand is as long it has good 'hole' inside, i just give example as i m using VIP brand.

This also apply to water tap, some water tap has small 'hole' causing water volume less. Check first the water tap before buy.

This post has been edited by tomjason: Apr 25 2012, 11:55 AM
TStomjason
post Apr 25 2012, 08:13 AM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(Mel2 @ Apr 24 2012, 06:48 PM)
i bet, most of those who requested the formula are contractors... haha ... laugh.gif

so suddenly so many ppl bought new house and wanted to renovate...dont u think so?
for me, i'll stick to reading the reno tips u gave, dont need yr formula yet cos...i dont have new house to renovate at the moment... biggrin.gif
*
TQ bro....TQ for reading my thread..... smile.gif

ya maybe u r right ......there could be as u r mention.... shocking.gif



-----------------------------------------------------------------------------------------------------

Tip:

1. Pic below is my backdoor grill...notice below pane....the wood pane below...but actually it is not wood..it is Aluminium with special coated...so today tip..if your grill or gate that especially exposed to rain and sun...better use these Aluminium compared to wood..as it is long lasting, anti-rust, no need to repaint.

Attached Image

2. For grill (that expose to rain) and gate . I would advised to coat is with Galvanized before paint. The galvanized will prevent your gate from rust and your gate will long lasting.

This post has been edited by tomjason: Apr 25 2012, 09:15 AM
TStomjason
post Apr 26 2012, 10:02 AM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(mav_850 @ Apr 26 2012, 12:45 AM)
me also contract (but not) tor yet hehehe  laugh.gif
no la... i do anything job lol.. wood working, roofing, plumbing, cement works... but not boss  blush.gif

you got the experiences... how to managed it (by your house case..)... worth to learned it...
i got experiences... how to do things...  icon_rolleyes.gif
*
TQ bro...

sorry actually wrong typing..i mean that contractor cannot cari makan... biggrin.gif
TStomjason
post May 2 2012, 07:59 AM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
PMed all that requested.


---------------------------------------------------------------------------------------------------------------------------

My DIY on JS Yale sink.

Attached Image


I would not advised forumer to buy this Yale from JS unless your contractors are expert enough to break the tap hole. The tap hole for Yale is very difficult to do and will cause your sink break.



This post has been edited by tomjason: May 3 2012, 10:24 AM
TStomjason
post May 3 2012, 10:20 AM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
hi,

I would like to inform that the tips has come to the end, i hv few more others tips....to inform that i will delete all the tips and all the formula within 1,2 days. Please read thru and captured what ever you want.

Regards

Tom
TStomjason
post May 3 2012, 12:14 PM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(craftsnknots @ May 3 2012, 11:39 AM)
Why delete? It was so great!. Anyway, i want to ask, for my back extension, can the contractor just use a backhoe to push in the bkau pile or must he use and A frame with a load?

Because all the contractors doing my area just use the backhoe but I was told these are not useful and they should use a an 'A' Frame with a load.

he quoted me RM8500 for back ext 22x5 with 36 wood pile and concrete roof with 54 wood pile for RM1,400
*
hi,

now you getting the right quotation...compared to your previous contractor quotation smile.gif ..or you are using same contractor?...... can you elaborate a bit "concrete roof with 54 wood pile for RM1,400"...the piling is only for pillar..the roof slab is tie to the pillar...the concrete roof nee not piling....

ok for the backhoe or not...usually using backhoe is easy job for contractor...using backhoe for bakau piling is usually if your land is soft..easy for backhoe to push the bakau..if you land is hard or if your land full with stone, then difficult for the backhoe...the other drawback for backhoe..please ensure the the road, fence etc are not damage by the back hoe..especially your neighbour fence...

using A frame is good but a bit difficult for contractor...the A frame is use if your land is hard and if you are piling using concrete piling and not bakau...

the choice is yours and depend on your house situation..

This post has been edited by tomjason: May 3 2012, 12:16 PM
TStomjason
post May 3 2012, 01:46 PM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(craftsnknots @ May 3 2012, 12:38 PM)
No this is a new contractor. The other cut-throat contractor i asked him to go fly kite already..haha

This new contractor only put
1) To extend wet kitchen to single storey 22x5 c/w 36pcs of wood pile and cement work RM8500
2) To concrete roof c/w 54pcs wood pile RM1,400
3) to supply and install 2 lenght of water pipe at wet kitchen RM500
4) To supply and install 1 unit of 3-1/2 x 6 new aluminium window at wet kitchen RM750 (he said glass thickness 5mm)
5) Labour charge to lay new wall tile w/o tiles at size 570 = RM2,565 (so its RM4.5psf)
6) labour charge to lay new floor tile w/o tiles at size 150 = RM900 (so its RM6, i think this is expensive, but i've seen his work..very nice..but still exp)
7) To supply security door at wet kicthen RM1400 ( i think exp)
9) Labour charge to concrete table top at size 21ft long w/o tile RM1,785 (RM85pfl)
10) To concrete fence at size 95'long c/w 2'ft 1 pcs wood pile, to supply and install of column c/w 3 pcs of wood pile at car porch = RM11,400
he said the fence, every 2 ft, he will put 1 pile and every column he will put 3 pile
11) To modify 2 units of column (gate post) at size 2ft c/w 10pcs of wood pile  = RM2,000 ( He said each side he put 5 pile and this is concrete gate post for RM1,000 each side)
12)to supply and install 3 length of water pipe at car porch = RM750 (is this exp? its from neighbour side to the opposite garden side (cornerlot) I thought only RM150 each
13) To coverup drain at car porch = RM450..this is because i move the gate post so outside that drain need to cover with a concrete slab and need to hack the pavement since i move gate post..

For plaster ceiling he charge RM2.5 psf and for step (light box) he charge RM13psf

He told me if wanna use A frame he had to increase price coz expensive and he said actually waste money


Added on May 3, 2012, 12:39 pmThe roof pile i think he means that because I want concrete roof he need to add piling to the ground so total 90 wood pile
*
--------------------------------------------------------------------------------
Hi,


This is my comment.....

1. To extend wet kitchen to single storey 22x5 c/w 36pcs of wood pile and cement work RM8500.

Reasonable.

2. To concrete roof c/w 54pcs wood pile RM1,400.
Ok i understand. RM1,400 / 54 = RM25 per piece include work. Reasonable. In this case, next time if you want to add double storey, just add the upper floor, cause you have strong pilling. If you intended to add second floor, extend the pillar a bit about 1 or to feet to the upper slab, so that easier in future to add second floor. I hope you understand what i meant...if want elaborate inform me.
3. Item 3. reasonable. DO NOT USE ABS pipe. Get PVC pipe Class 6 or 7 or stainless steel SS pipe (SS pipe expensive a bit ). Min use pipe size 3/4 inches.
4. Reasonable. Make sure color glass, white glass is cheap glass. And make sure aluminium frame is coated (eg chocolate color).
5. Item 5 , ok. But make sure the price include cement, glue etc.
6. Item 6, ok. Maybe your tile is 2x2 fts.
7. Item 7, from my suvery,ok. But check how thick the door.
9. Item 9, ok..if come with tile,cement&labor.
10. Item 10, expensive. Want elaboration, your fence is 95 ft long? and thus this price include car porch?
11. Item 11, if can get discount, better..smile.gif
12. Item 12. ok lah, if can get discount much better smile.gif but DO NOT USE ABS pipe.
13. Item 13, how long you want to cover up the drain?

For plaster ceilling, price ok....ceilling thickness at least min thickness is at least 9 mm, do go less than that.

if you 'sayang' your tile better do the ceilling first then tile excerpt for bathroom and kitchen area with tile. Hope you understand what i mean.

As i meantion b4, A frame , difficult for contractor, using backhoe is cheap...but if backhoe make sure the backhoe dont damage the road or fence etc...

This post has been edited by tomjason: May 3 2012, 01:50 PM
TStomjason
post May 3 2012, 02:31 PM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(craftsnknots @ May 3 2012, 02:01 PM)
tongue.gif Thank you! Thank You!

Concrete table no tiles..just concrete and labour..I ask him to make it 2.6inches thick coz too thick like very ugly...was thinking if i want kitchen cabinet guy to do dunno granite slab only without concrete can tahan or not..otherwise I just concrete and tile it..cheap

My floor tile for bath is 2x1 only so RM6 i tot expensive..but he say chinese guy..

The fence coz it is corner..so it is actually 75ft long (from porch to the back garden side)+ the back about 8ft + neighbour side about 9ft + in front (next to gate post) 3ft ..so 1 ft about RM120..i tot should be like RM90 to RM100

the pipes he showed me black poly pipe.its black pipe with a thin blue lining he said now all bend and gripped/kepit..something like that..

The gate post he said each side RM1,000..actually my opposite neighbour..same size everything he charge him RM1,200..he said already discounted for me...because it is concrete..I asked him why some only RM850 he said coz RM850 is brickwork not concrete gate post,..
Btw, for electrical he sub to ppl then he charge me aircon point RM180 per point then RM400 to conceal 1.0HP air con copper pipe for 0.61mm with 4 col wiring and water pipe c/w plastering for limit 10'.

Rm450 if it is 1.5HP,
RM500 if it is 2.0HP and RM600 if it is 2.5HP.

Is this like super expensive? air con point is already RM180. He said because he use 0.61mm copper piping not those soft ones
*
---------------------------------------------------------------------------------------------------------------
yes ur right, too thick not very nice table top.....yes..if you want tahan..better concrete...unless dry kitchen...if for wet kitchen better concrete and tile...do no use solid surface..easily scratch unless dry kitchen. But the choice is yours...

you must know the game of the contractor...biggrin.gif.....to be a good contractor..he must good at game of psychology.....biggrin.gif......
some work they give you cheap but then he mark up at different work...so at the end, some work cheap but some work expensive...but you must observe the quality and the total overall cost as i mention in my formula..does the overall cost exceed my formula or not...if less you are save....smile.gif ......Another game of contractor is, they will observe the knowledge or the house owner, if the house owner do not know about that particular work..they will mark up the price..biggrin.gif.....

for the gate pillar..the reason he gave is concrete pillar..ok..can accept the reason...biggrin.gif....

for pipe ..he use poly pipe..the black pipe is poly..the blue lining is Sirim approved.....he use the new type of gripped for poly..not normal screw type..the gripped or clamp is strong compared to normal screw...poly usually for outside house...if concealed inside the house..my opinion is still 'nipis'...i donot say cannot be use...but usually concealed in the wall usually pvc.....but the choice is yours.... ask the contractor what the price different he quote for poly and pvc...

aircond RM180..ok,,check the of the air cond wiring 2.5 mm?..for copper pipe..depend of the length of the copper pipe...what is the length of your copper pipe...usually if concealed they charge extra...


for your fence...for my opinion is still expensive....why he need to pile every 2 ft..i think no need....just ensure every 10 ft i concrete pillar with piling and concrete beam column at below between pillar........ask the contractor....option...if you do not want pile every 2 ft..what is the cost different....

This post has been edited by tomjason: May 3 2012, 02:34 PM
TStomjason
post May 3 2012, 02:51 PM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(apisgogo @ May 2 2012, 10:10 PM)
Wau great stuff!

Going to start reno for my apartment soon (totally clueless!). Appreciate if you could pm me your formula.

In your opinion, which work to start first? (for completed unit apartment) plaster ceiling? Grilling? or electrical? or bathroom?

Thanks! smile.gif
*
-------------------------------------------------------------------

Hi bro,

this is my sequence....and con be consider tips..biggrin.gif....

my sequences....

if comes with no tiles....bathroom, electrical,plaster ceilling and grill.....



TStomjason
post May 3 2012, 04:03 PM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(craftsnknots @ May 3 2012, 03:00 PM)
For lighting point i asked for 2.5mm wire (local duwan china) he charge RM55 each, 13A point is RM95 each..he said each point he pull from MCB and every point max 3 plug point. but for Kitchen he said oven , fridge and where i wanna boil water he wont loop..

Air con he said the price he quote if for 10ft and below include plastering so call concealed..anything more he will charge by feet. Actually i am wondering if conceal and when the pipe has condensate...the condensate will seep into the plaster and then my paint will start to 'pop' haha...but new renovation all conceal...

This contractor he tell me his quote is a little higher because he use all the good stuff..not like another contractor if i want cheap they will say can then they sendiri reduce the piling and wire size and all use ABS or PVC..He said poly for outside

For fence because next to my house is a road already and quite alot of ppl use the road..so he said like heavy vehicle passby all the time maybe afetr 10, 15yrs the fence will senget...and sometimes if heavy lorry passby (coz there's construction nearby) I can feel the vibration a little..So he said every 2 ft 1 pile as a reinforcement..I think this i can accept but RM120 exp to me...I ask him to re-quote with your input just now he said he will crack his head and call me again..haha
*
---------------------------------------------------------------------------------------------------------

My advised do not believed 100 % what contractor when give reason...smile.gif...


"For lighting point i asked for 2.5mm wire (local duwan china) he charge RM55 each, 13A point is RM95 each..he said each point he pull from MCB and every point max 3 plug point. but for Kitchen he said oven , fridge and where i wanna boil water he wont loop.."

My comment:

He is right that do not loop heater, ovem and fridge....my advised...do not use china made wire..dangerous...if he is good contractor he wont suggest you that...go for Sirim approved wire.. abit expnsive..but for your safety...the price he gave is cheap cause china made wire...


"Air con he said the price he quote if for 10ft and below include plastering so call concealed..anything more he will charge by feet. Actually i am wondering if conceal and when the pipe has condensate...the condensate will seep into the plaster and then my paint will start to 'pop' haha...but new renovation all conceal..."

My comment:

u r right..for concealed aircond piping..be sure the insulation is good and properly done....


my experinced with ABS, i hv created thread about ABS..find it..ABS easily break and leak and cannot tahan acid...

for fence, as you also notice the price is too high...for 95 ft....you can get around RM5000-RM6000. But Rm11500.... rclxub.gif



for me renovation is not small matter...take example as what i hv experienced with my ex contractor.....do not 'gopoh2' finding...contractor...if you feel...you dont like his quotation and cannot nego..there are a lot of other good contractor......one more things..i do not like contractor that cannot negotiate and always get angry....you image..you hv not confirm the work and still nego..he started angry..what will happend when already confirm with him..and later you want to change this and that..sure he will get angry...biggrin.gif...

this is just my comments..do not angry with me...biggrin.gif.....

just my 2 cent opinion....

This post has been edited by tomjason: May 3 2012, 04:13 PM
TStomjason
post May 3 2012, 04:58 PM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(craftsnknots @ May 3 2012, 04:33 PM)
Some misunderstanding d...The wires he is not using china (I also requested not to have china made).

For ABS, I read the thread already I also told this contractor I duwan ABS and he said his price is not ABS coz he also thinks ABS is not good

Fence i think let him re-quote again..this uncle so far better than the first one i shared with you. At least he was very patient when i asked him how he construct the fence and ext and tiling and wiring..Not like the first horrible contractor..everything say because its good but duwan to explain.

If this current one is good, i plan to let him do it for me
*
Ok...overall..your contractor gave reasonable price and material also quality one..the piling is also good....only the fence quotation is a bit expnsive...i think maybe due to the extra piling for every 2 fts..what he suggested is good to make your fence strong, if you are willing to pay extra....

when he mention to you that ABS is not good...then he is experience contractor...biggrin.gif

if he patience and explain everthing...then he is good contractor....biggrin.gif

hopefully my comment and advised already save you $$$ from the first contractor...also now your knowledge about construction is very goooood. improved 200% compare before this......biggrin.gif ...

tell me you if confirm with him..inform me the progress... biggrin.gif

This post has been edited by tomjason: May 3 2012, 05:04 PM

16 Pages « < 2 3 4 5 6 > » Top
 

Change to:
| Lo-Fi Version
0.0413sec    0.59    7 queries    GZIP Disabled
Time is now: 4th December 2025 - 03:10 AM