 Renovation Secret & Tips Revealed, Secret&Tips contractor wont tell you

views
     
mojoez
post Apr 10 2012, 07:05 PM

New Member
*
Junior Member
17 posts

Joined: Apr 2012
QUOTE(tomjason @ Apr 2 2012, 03:44 PM)

Other tips;

3. If you raise your floor like mine (i raise 1 feet above), please fill with sand (as we know sand not 'takung water'). If possible do not fill with tanah or sampah sarap, usually contractor want save money, cause sand is expensive. Usually 'tanah' will 'mendap' as time goes, then there is gap between floor. Before concrete, let your sand fully 'mendap' by rain water or pipe water. Then after the sand mendap, then re fill any gap, then you can concrete after your sand is stabil.

Another reason not to use tanah or sampah2...is to avoid any water takung below your concrete.



Hi Tom, you mentioned not to use "sampah sarap", I would assume that we cannot use the "sampah" from a hacked wall? I initially plan to use the "sampah" from a hacked wall as the base for the raise floor.

By the way, can you PM me the formula as well?

Thanks.
Octopuz
post Apr 10 2012, 07:33 PM

Getting Started
**
Junior Member
61 posts

Joined: Jun 2006
Hi Tom,need the formula too.. just got my keys
exkaizen
post Apr 10 2012, 07:47 PM

An Area No Kishi !!!
******
Senior Member
1,555 posts

Joined: Aug 2005
From: Oslo, Norway
Hi Tom, pm me the formula as well.. tq
cavynz
post Apr 11 2012, 11:09 AM

Casual
***
Junior Member
367 posts

Joined: Nov 2005
Very informative thread smile.gif Bro, can you PM me your formula as well ? Gonna start my house reno soon. Thanks
Pegasus88
post Apr 11 2012, 06:22 PM

Enthusiast
*****
Senior Member
725 posts

Joined: Mar 2011
From: MIRI


hey TS nice thread ! mind to provide me information about your GI steel roof trust ? is that known as C-chanel (dono how to spell)...and also information about the orange pipe...is that water pipe or for drainage only ? who are selling these things ?
iraz
post Apr 11 2012, 09:27 PM

New Member
*
Junior Member
21 posts

Joined: Jul 2011
Tuan,

Boleh PM me the formula.

Terimakasih
Pegasus88
post Apr 11 2012, 09:37 PM

Enthusiast
*****
Senior Member
725 posts

Joined: Mar 2011
From: MIRI


QUOTE(tomjason @ Apr 2 2012, 03:44 PM)
TQ nicky...biggrin.gif PMed already to you and craftknots.
Other tips;

someone ask me, the sample of BS steel, below is the sample my house steel, size 12, if you have chances to see size of CQ steel is smaller and 'lembik'..

for beam, better to make is a little bit bigger, mind is rather small.
[attachmentid=2769198]
another tips:

1. before concrete the floor, please put the construction plastic before concrete, many do not know the main reason to put the plastic. The main reason to put the plastic to avoid the water from concrete to dry to fast to soil and causing the concrete premature dry and can cause your floor concrete brittle or crack or. Many think that the main reason to put plastic is to avoid water vapor, this as secondary reason.

2. The best method to concrete floor is as my pic below, the BS BRC net steel (the jaring steel) is tie to the beam that exposed, these will make your floor concrete super strong..smile.gif..see my pic below. Please use BS BRC net size 7 or 8, especially for upper storey. If for single storey house BS BRC net steel size 6 pun ok lah.

3. If you raise your floor like mine (i raise 1 feet above), please fill with sand (as we know sand not 'takung water'). If possible do not fill with tanah or sampah sarap, usually contractor want save money, cause sand is expensive. Usually 'tanah' will 'mendap' as time goes, then there is gap between floor. Before concrete, let your sand fully 'mendap' by rain water or pipe water. Then after the sand mendap, then re fill any gap, then you can concrete after your sand is stabil.

Another reason not to use tanah or sampah2...is to avoid any water takung below your concrete.



[attachmentid=2769206]

TQ
*
isit possible to request the contractor to tie rebar in concrete slab instead of net steel ? or put both ?
prop99
post Apr 12 2012, 08:53 PM

Casual
***
Junior Member
332 posts

Joined: Oct 2011
PM me also bro Tom.
shinrei
post Apr 12 2012, 11:22 PM

Getting Started
**
Junior Member
249 posts

Joined: Apr 2006
From: K.L


Me too! Getting ready to renovate soon my condo..
TStomjason
post Apr 13 2012, 08:27 AM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(mojoez @ Apr 10 2012, 07:05 PM)
Hi Tom, you mentioned not to use "sampah sarap", I would assume that we cannot use the "sampah" from a hacked wall? I initially plan to use the "sampah" from a hacked wall as the base for the raise floor.

By the way, can you PM me the formula as well?

Thanks.
*
PMed you and others that have requested for the formula.


If the sampah from hack wall, its ok. donot have sampah as paper bag cement and wood, these wood will attract termite..also if you fill it with 'sampah' or soil from others place, be caferefull as soil from others places can have termite inside..we never know, beside the side effect i mention before that means you bring termite to your area...cause contractor like to fill with soil as its cheap..


Added on April 13, 2012, 8:31 am
QUOTE(Pegasus88 @ Apr 11 2012, 06:22 PM)
hey TS nice thread ! mind to provide me information about your GI steel roof trust ? is that known as C-chanel (dono how to spell)...and also information about the orange pipe...is that water pipe or for drainage only ? who are selling these things ?
*
TQ bro.

the GI truss have two type , the C type shape (cost around RM32 per piece )and the V type (cost around RM12)shape....these prices one year ago...the hardware shall know..for the orange pipe..it UPVC Sirim approved type expensive cost about RM77 per pipe, the price one year ago. All these can be found at hardware shop selling material construction.


Added on April 13, 2012, 8:32 am
QUOTE(Pegasus88 @ Apr 11 2012, 09:37 PM)
isit possible to request the contractor to tie rebar in concrete slab instead of net steel ? or put both ?
*
using rebar instead BRC net steel for your floor is the best....but it is costly and timing cause, need worker to tie the individual rebar...


today tips:


1. attach picture below is my DIY for the kitchen sink pipe outlet. This is the correct way to install the kitchen sink outlet pipe. Please use this type of elbow (using screw) so that when your outlet pipe is blockage with food wastage , you can easily unscrew the elbow and clear the blockage with wire or 'wire ring' that you can buy from hardware shop.


2. From the pic below also, to avoid your food wastage pipe from blockage, use my tips, use at least upvc pipe size 3" or 4" at the last end to man hole, this way your do not have food wastage blockage is future. My design , from the sink, i use upvc sirim approve (thick) size 11/2 ", then goes to upvc pipe size 2", and at last goes under ground upvc pipe size 3" to man hole. Please study the pic in detail.

[Tomjason already deleted the photo attached. Sorry ]...PM me if you want the photo


want more clarification, inform me.


--------------------------------------------------------------------------------------------------------------------------------------

3. For electrical, i would advise to have seperate DB for your house if you are doing reno, such as one DB at living room, one DB at kitchen or one DB at upstair. In this way you can easy manage and easy to troubleshoot in future.

4. If you are doing reno, i would advised you to install power socket and light inside your upper ceilling, And the ceilling power socket and light have switch control from down stair.


want more clarification, inform me.

This post has been edited by tomjason: May 14 2012, 09:43 AM
Omar5782
post Apr 13 2012, 02:27 PM

New Member
*
Junior Member
6 posts

Joined: Apr 2012


Dear Tom
Boleh PM saya formula nya.

Thanks
TStomjason
post Apr 13 2012, 02:43 PM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(Omar5782 @ Apr 13 2012, 02:27 PM)
Dear Tom
Boleh PM saya formula nya.

Thanks
*
PMed already.

Omar5782
post Apr 13 2012, 03:04 PM

New Member
*
Junior Member
6 posts

Joined: Apr 2012


Thanks Tom
How about tile laying pricing

Reagrds
TStomjason
post Apr 13 2012, 03:07 PM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(Omar5782 @ Apr 13 2012, 03:04 PM)
Thanks Tom
How about tile laying pricing

Reagrds
*
for tile:

For tile 1x1, the upah is RM2 sq ft. If include cement etc then RM4 sq ft.
For tile 2x2, the upah only RM2.5 sq ft, mean per tile upah only RM10. If include cement etc around RM18-RM20 per tile.

abusuffian
post Apr 13 2012, 03:46 PM

Getting Started
**
Junior Member
75 posts

Joined: Oct 2005


Bos,

I also need the formula, please..
TStomjason
post Apr 13 2012, 04:00 PM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(abusuffian @ Apr 13 2012, 03:46 PM)
Bos,

I also need the formula, please..
*
PMed already

er650
post Apr 13 2012, 05:41 PM

New Member
*
Junior Member
8 posts

Joined: Jan 2010
wahh.. bro tomj, so many kaki request yr formula aredi, i so paiseh... anyway do u mind pm it to me too? .. he he thank you in advance... thumbs up to u

aspacothr
post Apr 13 2012, 06:06 PM

New Member
*
Newbie
2 posts

Joined: Aug 2011
Hi tomjason, can u also pm me the formula? Thnks in advance!
tunemusic
post Apr 15 2012, 01:27 AM

New Member
*
Junior Member
24 posts

Joined: Apr 2012
i would like to ask if the house is already 20 years, is it advisable to change the roof or repaint the roof?

is it nowadays roof is not as good as the old days roof?
redwindz
post Apr 15 2012, 02:05 AM

Getting Started
**
Junior Member
54 posts

Joined: Dec 2009


QUOTE(tomjason @ Feb 17 2012, 02:51 PM)
just to share...actually most contractor use formula to calculate the estimation of you renovation..else..how can they can give quotation between 2,3 days...if somebody want to know the formula..do PM me..

TQ..
after the selection of the steel iron, observe also for the sand type they use...the best sand for renovation is from 'mine/lombong'..usually the mine sand is white in color....the.....second is from river..or we call pasir sungai....normally river sand in yellowish or redish in color.....for pasir sungai or river sand..make sure that the river sand is 'wash' type...else....there is mud inside the sand..causing your concrete not strong enough....


for brick selection....if you got budget..use red brick 'tanah merah'....this brick is good and strong..it also..make your house cooler..compared to sand brick....for sand brick..the price..last time is about 0.23 sen ...else..the red brick is about 0.37 sen..price already gone up...for the red brick..the fully bake brick is good...how to recognized this brick?...there is some black color or line on the brick....
*
Hi, Tomjason. I'm planning to renovate my house (fencing wall, kitchen, wall tile, floor tile,roof) and would like to learn more. Care to PM me the formula? Thanks