Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed
46 Pages « < 41 42 43 44 45 > » Bottom

Outline · [ Standard ] · Linear+

 Central Residence - Phase 2

views
     
TSngaisteve1
post Mar 1 2014, 08:17 PM

Software Engineer
*******
Senior Member
6,779 posts

Joined: Dec 2005
From: Kuala Lumpur


QUOTE(Citydude @ Mar 1 2014, 06:08 PM)
Good question !

My new place at Gembira Residen, there r ample motor bikes special parking !
So it's shaded n under same roof as cars . Side by side motor cycle parking for big boys bikes parking !!
*
You moving out from midfield to gembira residen? biggrin.gif
TSngaisteve1
post Mar 1 2014, 08:18 PM

Software Engineer
*******
Senior Member
6,779 posts

Joined: Dec 2005
From: Kuala Lumpur


QUOTE(electroboy @ Mar 1 2014, 04:59 PM)
any of the owner here have a motorcycle? i'm planning to get a superbike, beside my weekday and weekend car that will use up the two parking space i got. did any of you asked, or know if there's additional parking space for motorcycle for residence?
*
so you rent out your car park?
TSngaisteve1
post Mar 1 2014, 09:29 PM

Software Engineer
*******
Senior Member
6,779 posts

Joined: Dec 2005
From: Kuala Lumpur


QUOTE(Citydude @ Mar 1 2014, 09:58 PM)
Just moved out !!!
Pengsan me...
The  rule not Allow our cars park in the porch car park n I got to park along side the compound side road to load things n becomes stressful as our things r put on side porch without anyone jaga while we go up n down lift to collect things etc

That's one of the many " rules" I don't like the place apart from the other car park rules etc
Tiring la. After 2 years stay !
Cannot tahan spiraling up n up that car park till reach 8A floor !
Eg Each level is 1A n 1B (2 floors already !)

Ha ha. Seeing stars going up n seeing moons when coming down !!
*
oh our central residence car park got this issue or not?
TSngaisteve1
post Mar 2 2014, 02:42 PM

Software Engineer
*******
Senior Member
6,779 posts

Joined: Dec 2005
From: Kuala Lumpur


QUOTE(Citydude @ Mar 1 2014, 11:51 PM)
The way I see today most tier car parks with high density sharing car park in one big block car park will have similiar problem !
Unless the blocks are few. N few units density .
If each block 400 plus x 3 = it's already 1200 plus car park !!
How to have one entire floor to house all cars
And so the tier levels will break into 1a, 1b levels
Etc after spiraling up the car parks n u got tandem car park, you must decide who gets in first n who gets out in the morning first !!
If u cannot compromise then prepare for quarrels .
Car parks who are tandem cannot rent out theirs extra one because the other rented guy will not want to tell you when he comes in or goes out n ask you to park your car later etc

Side by side car park - this layout you can rent out around rm 150-250 any time .
*
But this one 4 blocks spiral right? Okay wo can rent out RM150-250 per month? my apartment car park rent out only rm50
TSngaisteve1
post Mar 2 2014, 03:19 PM

Software Engineer
*******
Senior Member
6,779 posts

Joined: Dec 2005
From: Kuala Lumpur


QUOTE(Citydude @ Mar 2 2014, 04:05 PM)
Well who can rent out ?
If central turns to to be high class condo,
The car stay inside the condo is worth more than your condo- why not ?

If central turns out to be a normal luxury
Flats styles n infested with pimps - then sorry la. I can park any where along the road n no body cares !!

So 50 or 150 or 250 is up to mgt to brand the place .
If u compare residents with cheap flats worth rm 50k,
I guess no point to talk about car parks rental as everybody takes the bus n LRT n no need extra car park to park their precious 100k to 500k cars !!

Why not above 500k cars ?
Because anyone who owns a 500k will not bother to stay central but stay nearby 500 meters to KLCC Suria n in a 8million ringgit condo n park their 1.2 million Bentley car inside !!
*
Yeah maybe for them RM150-250 is nothing. But I think since most each unit got 2 car park already, then might not need extra car park except those family which got mother one car, father one car, son one car.
TSngaisteve1
post Mar 2 2014, 09:10 PM

Software Engineer
*******
Senior Member
6,779 posts

Joined: Dec 2005
From: Kuala Lumpur


QUOTE(Citydude @ Mar 2 2014, 08:49 PM)
Father son mother n daughter
Already 4 cars la
*
wa all children also got car biggrin.gif
TSngaisteve1
post Mar 3 2014, 10:28 AM

Software Engineer
*******
Senior Member
6,779 posts

Joined: Dec 2005
From: Kuala Lumpur


QUOTE(Citydude @ Mar 3 2014, 03:31 AM)
Glad u able to grow up faster n be prepare yourself to be strong man for future own family !

Parents these days keep pampering kids to teens to even adulthood without realising a house is just bricks mortar !!
The strong foundation of adulthood is good character to begin with and that require principles of living n principles of family principles disciplines . Even with money you can buy a big house or big car n keep showing off until no one bother anymore n after that - it's back to self again .

The meaning of life is strange but complicated by ourselves n made difficult because we live beyond ourselves. How to raise proper strong character children requires strong foundation parents .

Many parents think they want their kids get the best n to fulfill things they never had when they were kids that time . Their kids are their only way to fulfill their own past loss n fill it with perfection .
They use things to refill that life but don't spent the time to talk and nurture the children what's a better way of life n how to reach that objective .

It's getting worse these days when see a family sit in a round table coffee shop n all only play their smart phones without even talking to each other or smile to uplift the togetherness . Soon the parent will wafts apps his own son if he wants chow Keow teow or not
Ha ha. If we don't put a rule to stop playing phones during family get together !
Blame the father who started it all n let it happen to all his own family . ..

So it's good that both young husband n wife
Slot it out n not compare their little house with their rich Fren condo . Better compare the happiness u r able to share with your appreciative wife kids than showing off to strangers u never know !

At least - the kids grow up to appreciate daddy who brings
Money home n soon a nicer home when things get better
Etc that's what I call " reaching home "
A bed can bring sleep to some n no sleep for those rich men who r troubled by money too
*
Yeah, think maybe due to house is getting more and more expensive, most singles nowadays rather spend more to buy better/nicer car than saving up for a roof first. Not sure they want to show off or not but maybe also because they wanna 'enjoy' now first as they can use the car everyday. It is not easy to have both better/nicer car and at the same time good house for average income people. Talking about this, I drive Viva only biggrin.gif
TSngaisteve1
post Mar 6 2014, 11:42 AM

Software Engineer
*******
Senior Member
6,779 posts

Joined: Dec 2005
From: Kuala Lumpur


If SOHO unable to complete by end of this year, so we got 8% PA is it?
TSngaisteve1
post Mar 6 2014, 01:54 PM

Software Engineer
*******
Senior Member
6,779 posts

Joined: Dec 2005
From: Kuala Lumpur


QUOTE(jastan @ Mar 6 2014, 01:18 PM)
you still need to see your S&P stamping date. According to the agreement is 3 years from your S&P stamping date. For those who sign the S&P early, they can ask for LAD claim.
*
LAD stands for? Think mine is until end of this year
TSngaisteve1
post Mar 6 2014, 02:54 PM

Software Engineer
*******
Senior Member
6,779 posts

Joined: Dec 2005
From: Kuala Lumpur


QUOTE(Citydude @ Mar 6 2014, 03:49 PM)
Actually a lot time taken from complete build up n waiting time for the rest of things to PASS
DRAINS to landscape to installation of public n utilities
This take up almost 4-6 months as seen in many developments .
If just see a fully constructed building - it's not so demanding of time as those are in house timeline .

Time taken is time taken by outside people eg from electricity to water to drains approval by other authorities beyond developer control eg CF
*
wa tik tik tak tak also 6 months
TSngaisteve1
post Mar 6 2014, 03:19 PM

Software Engineer
*******
Senior Member
6,779 posts

Joined: Dec 2005
From: Kuala Lumpur


I think Yuk Tung will try not to delay to maintain their good reputation all these while
TSngaisteve1
post Mar 6 2014, 04:38 PM

Software Engineer
*******
Senior Member
6,779 posts

Joined: Dec 2005
From: Kuala Lumpur


wonder when they will get interior design blueprint from us, from those who want to have their own interior design/renovation
TSngaisteve1
post Mar 7 2014, 11:10 AM

Software Engineer
*******
Senior Member
6,779 posts

Joined: Dec 2005
From: Kuala Lumpur


QUOTE(jastan @ Mar 6 2014, 05:40 PM)
liquid ascertained damages

The late penalty
*
Thanks Jastan icon_rolleyes.gif
TSngaisteve1
post Mar 11 2014, 04:43 PM

Software Engineer
*******
Senior Member
6,779 posts

Joined: Dec 2005
From: Kuala Lumpur


Any new floor completed? biggrin.gif
TSngaisteve1
post Mar 13 2014, 03:02 PM

Software Engineer
*******
Senior Member
6,779 posts

Joined: Dec 2005
From: Kuala Lumpur


QUOTE(jastan @ Mar 13 2014, 11:04 AM)
Ladies & Gentlemen,

This morning, I saw that they are starting on level 15. Last update was 1 Mar 2014. Their progress are on track and able to finished 1 floor within 2 weeks. So far so good.
*
wa 15 floor already? thumbup.gif
TSngaisteve1
post Mar 17 2014, 10:52 AM

Software Engineer
*******
Senior Member
6,779 posts

Joined: Dec 2005
From: Kuala Lumpur


Hopefully the recent haze won't affect the development schedule much. Feel for those working in construction.

This post has been edited by ngaisteve1: Mar 17 2014, 10:53 AM
TSngaisteve1
post Mar 18 2014, 03:55 PM

Software Engineer
*******
Senior Member
6,779 posts

Joined: Dec 2005
From: Kuala Lumpur


slow and steady is better ma biggrin.gif
TSngaisteve1
post Mar 18 2014, 04:51 PM

Software Engineer
*******
Senior Member
6,779 posts

Joined: Dec 2005
From: Kuala Lumpur


QUOTE(jastan @ Mar 18 2014, 05:31 PM)
Slow doesn't mean Steady.

Fast doesn't mean Not Steady.

Have to understand the real situation. Don't generalized.
*
Yeah true also icon_rolleyes.gif

Actually the Leafz started earlier than Central Residence how long? 3 months?
TSngaisteve1
post Mar 24 2014, 05:14 PM

Software Engineer
*******
Senior Member
6,779 posts

Joined: Dec 2005
From: Kuala Lumpur


CityDude, shouldn't be a problem la to rent out at RM1600-1800 icon_rolleyes.gif
TSngaisteve1
post Mar 24 2014, 06:22 PM

Software Engineer
*******
Senior Member
6,779 posts

Joined: Dec 2005
From: Kuala Lumpur


QUOTE(Citydude @ Mar 24 2014, 06:35 PM)
Who told u can rent so high price for a 731sq ft
Place ?
*
Once completed then will know la biggrin.gif icon_rolleyes.gif

46 Pages « < 41 42 43 44 45 > » Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0618sec    0.35    7 queries    GZIP Disabled
Time is now: 10th December 2025 - 11:41 PM