> Ultimate LRT extension construction update thread!, Ara Damansara, USJ, Puchong!

views
     
stimix
post Sep 24 2012, 02:26 PM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



QUOTE(gjohn @ Sep 24 2012, 10:37 AM)
puchong still the same??
not much work done>
*
Kinrara side till Giant progressing well. and almost like what Kampung posted for USJ19 area. After Giant, started piling and can see abit liao till Shell. But from IOI Mall onwards.. seems like all works stagnant cry.gif
stimix
post Sep 24 2012, 02:41 PM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



QUOTE(davkong @ Sep 24 2012, 02:36 PM)
Stimix, what will happen if the track stop till Kinrara side only? Can it still run?
*
Shoud be OK lor.. probably stop at the last stn beside Giant Kinrara. MRCB really...haizzh @#%$^& mad.gif

Anyway, Pasarana should hv imposed some form of penalty on late completion.. see how fast lor...I can see lotsa tracks piled up beside IOI Malls but no viaducts at all doh.gif
stimix
post Sep 24 2012, 02:52 PM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



QUOTE(davkong @ Sep 24 2012, 02:48 PM)
I think in this case MRCB can claim extension of time from Prasarana, because they can say the delay is due to events out of their control, which is the refusal of the school to grant permission to work near their compound. Which brings to another point: who should be responsible to secure all right to work? Prasarana or the contractor?
*
Darn wth them holding ransom on the school when that school just a small portion of the overall Stn 6 till 13 @##%%$
stimix
post Oct 12 2012, 08:32 PM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



MRCB really....%%$#@#& dunno what to say.. still satu tiang pun tarak
stimix
post Oct 12 2012, 08:53 PM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



QUOTE(alan_kong84 @ Oct 12 2012, 08:34 PM)
how bout the sunway group at USJ le...
*
Posted earlier pages.. Also as good as what in Kinrara and started later than MRCB mad.gif
stimix
post Oct 13 2012, 05:07 PM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



QUOTE(young coconut @ Oct 12 2012, 09:01 PM)
sometimes the delay is not solely caused by the contractors. it might be caused by other parties e.g land acquisition, authority approval, etc.

btw, everyday i pass the construction area in front of ara damansara near NKVE subang exit (package awarded to TRC). bad traffic jam
*
The only problem facing MRCB in Puchong is just that Indian School beside the U-Turn flyover & Indian temple. Otherwise elsewhere there are no excuse for them to delay the construction. The school problem is not whole of Puchong vmad.gif
stimix
post Oct 14 2012, 12:34 PM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



QUOTE(Kampung2005 @ Oct 13 2012, 05:51 PM)
I hope MRCB should at least start building STN 6 first.
*
This was the condition of stn 6 neside IOI Mall when I took this 2 wks ago...You can see the viduct lines at the red circle... but no Tiang at all sad.gif

user posted image
stimix
post Oct 25 2012, 05:49 PM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



QUOTE(ANNIYAN_X @ Oct 25 2012, 05:47 PM)
yup i too think should 2013..as maybe thy complete sri petaling --> kinnrara first..... then start ioi-puchong prima... if dua dua jalan sekali..i think the road will jam/headache for road user  goin towards bukit jalil from puchong... so thy complete one stretch first...
*
Sri Petaling to Kinrar is not by MRCB but Binapuri. MRCB is the one delaying just bcos the Indian school dunwan to give them access.. One school problem causing delay in the overall project..funni hmm.gif
stimix
post Nov 1 2012, 03:42 PM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



QUOTE(ANNIYAN_X @ Nov 1 2012, 10:12 AM)
i think already start but we just can see because of the blue fencing..i got a glimpse.. the track pillars already started to built, iin oi station can see 1 pillar but only the steel frame is up, others just the steel frame foundation is being built....
*
The one beside Tesco Puchomg & Indian temple right? That activities by laying the support drain & electrical pipes also started long time ago in II side and I even saw they started this months ago opposite wisma tracktor. Thereafter they just laid it wth soil in both IOI Mall & Wisma Tracktor ...Therafter.. no pillars at all

Check my old post in May this year located opposite Traktor - Also looks like piling & also laying of drain pipes & electrical pipes.. therafter nothing:

QUOTE(stimix @ May 21 2012, 10:43 AM)

Stn 9 - Tractor/Puteri MArt - Piling atlast started..but this is really narrow.. changes of stn in the middle of road - High?
user posted image
*
This post has been edited by stimix: Nov 1 2012, 03:46 PM
stimix
post Nov 9 2012, 08:50 PM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



Yeah at last the pillars at the stn 6 IOI mall started liao.. still slow compare to others

user posted image
stimix
post Nov 10 2012, 03:19 PM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



QUOTE(unig @ Nov 9 2012, 11:21 PM)
Those LRT structures at Puchong.... not scared sink ar later since Puchong is one big ex-mining hole hehe
*
If sked sink... ppl got references elsewhere in Klang Valley liao since Puchong still new.. all houses less than 20 yrs.. can refer to longer established ex-mining land & also ex-lakes regions such as the whole of Pandan Jaya in KL.. all timus Tanah wan and already >30 yrs.. Those houses & flats there still stayed strong on top of Tanah timbus biggrin.gif
stimix
post Nov 18 2012, 09:14 AM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



Taken Yesterday.. Progress near USJ19 mall

user posted image
stimix
post Nov 18 2012, 09:34 AM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



U dun ka-kacau-cau... Puchong till IOI Mall also gooding liao... and IOI mall also started already..can see batangs liao
stimix
post Nov 25 2012, 11:29 PM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



All taken Yesterday & Today.

Kinrara - near Mercedes SC...The cornering track rail support laid -24/11
user posted image

Kinrara- heading towards Zest 9 24/11:
user posted image

Special visit to Kg Muhibbah - Entry via Bkt Kuchai/Tmn Perindutrian OUG- View from far @ the narrow flyover on top of Kesas:
user posted image

Kg Muhibbah beside Stn 2- uo close:
user posted image

Surprisingly before that Kg Muhhibah side rail.. The Bkt OUG side still without rail track:
user posted image



stimix
post Nov 25 2012, 11:35 PM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



QUOTE(Kampung2005 @ Nov 25 2012, 11:32 PM)
Nice progress!

How's Puchong?
*
Got 2 batangs up to the summit liao beside IOI Mall brows.gif But din take any picture.. Works on more batangs also started in carpark area of IOI Mall, Beside Tesco & just b4 that Indian school.. Elsewhere... Nothing.. sad.gif
stimix
post Nov 25 2012, 11:43 PM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



QUOTE(Kampung2005 @ Nov 25 2012, 11:37 PM)
I hope the school issue can be sorted out as soon as possible.

Really not a single work started beyond that area?  hmm.gif
*
There is some works opposite Wisma Tractor but still soil survey wth all the big rocks..There is also something going on beside rakan muda complex but can't really see bcos this site covered up.

Elseweher- Puchiong Perdan- not even single thing there. But opposite the river from Kg Sri Aman i.e Putra Height side, I can see soil testing works started liao
stimix
post Dec 5 2012, 08:58 PM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



The soil survey works opposite side of Klang River opposite Kg Sri Aman Puchong.. i.e on Putra Height side (Kg Bkt Lancong)

user posted image

Actual loacation:
http://wikimapia.org/#lat=2.995349&lon=101...47&z=18&l=0&m=b
stimix
post Dec 5 2012, 09:16 PM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



QUOTE(JinXXX @ Dec 5 2012, 09:12 PM)
can;t see anything looks like.. ahhh nothing there... lol

thanks for sharing..
*
Kampung area for sure can't really see anything.. BTW, not far from the side I took this picture, suppose to be the stn 12 in the middle of the kampong!
stimix
post Dec 6 2012, 08:58 AM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



Yeah. Stn 12 already been postponed/stopped after heavy protest from kampung folks...good also as..no one can imagine a LRT stn in the middle of not so densely populated kampung haha.

Anyway...as per the photo, lotsa activities on the other side of the river (Sunway) compare to No activities at all after stn 7 onwards on Puchong side
stimix
post Dec 6 2012, 12:08 PM

Dunno
Group Icon
Moderator
3,542 posts

Joined: Jan 2003
From: Puchong, Selangor



QUOTE(ANNIYAN_X @ Dec 6 2012, 11:34 AM)
in can be either way.. the populations can increase in kampung..let say in future thy development any malays reversed land there into a condo/watsoever(only imaginations, low density luxury condo in middle of serene kampung enviroment,kekekeke),sure all they bumi's will buy there mah..... maybe thts the goverment future plan...anyway the kampung folks heavily  reject the lrt..i guess/sure they same old folks will come and use station 11/10..... so will add crowd to that 2 stations..mst probably will station 11... looking the station currently built in puchong...each station can almost walking distance to the residential place.. if station 12 is built..all kampung folks can use station 12...puchong prima residendent can use station 11. puchong perdana residents can use station 10... so no over crowd,illegal parking will reduce, coz all can walk to the stations.....i think they should built it... just like MRT..although some place got heavy protest..still teh project is ON... sometimes TRANSFORMATION comes with some sacrifice's too........ hope the plan on station 12 wil become reality... others tasek prima/putra prima/taman mas can choose with ever nearer..
*
I am hoping they will extend the rail track across the river and doubled up as small road connecting Putra Height & Puchong brows.gif ...Toll free to USJ side rclxms.gif