Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 Mah Sing Group to launch new M Residence@Rawang, from the star

views
     
kekura
post Feb 25 2014, 02:02 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2003
8mbps is also less likely, because the limitation must be less than 1.51km from nearest TM exchange. M Residence quite deep inside, >2km from Anggun.
kekura
post Mar 31 2014, 11:14 AM

Casual
***
Junior Member
322 posts

Joined: Jan 2003
Phase 1 22x80 is cheaper by about 50k compared to Phase 4 22x80 both facing field. Phase 1 complete earlier so can save more on interest.


kekura
post Apr 4 2014, 02:17 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2003
QUOTE(kekura @ Jan 16 2014, 02:04 PM)
I saw a land clearing just across M Residence/M Avenue. The land does not belong to Mah Sing. Does anyone know about this?
*
This is the land I mentioned about. Opposite M-Residence grand entrance/M-Avenue, the other side of Jalan Tasik Puteri. This picture is taken last February. Still no notice what is being built. But this land location seems strategic for petrol station...

Attached Image
kekura
post Apr 21 2014, 04:24 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2003
Yesterday's visit:

2 units SemiD still available - 1 corner unit, 1 facing T junction. Price has reached above 1mil.

Last rows of Phase 4 22x80 DSL had been opened, so many units especially facing field still available. Price now is 750k. Its getting harder to sell at this price.

Wow... so expensive for DSL at this location. It better be good. How can they increase price when the infrastructure still not complete. Recently appeared in Chinese newspaper saying although the flyover at toll junction has been opened (partially), the road is still badly jammed due to bottleneck.

kekura
post Apr 22 2014, 01:05 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2003
QUOTE(Hello_kitty 89 @ Apr 21 2014, 09:12 PM)
Phase 4, 22 x 80 DSL selling RM 750k? What is the rebate / discount?
*
Still 5%.
kekura
post May 8 2014, 10:17 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2003
Phase 1 got 22x80. The price was 600k after discount oct last year. I think tmm is right, plus all misc fees 650k is not making profit. Perhaps those are leftover unit direct from developer, not subsale.

This post has been edited by kekura: May 8 2014, 10:24 PM
kekura
post May 12 2014, 12:16 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2003
QUOTE(xenite @ May 12 2014, 11:20 AM)
hi all,

just a quick question, is mresidence a concept house type?
i heard from my friends that concept house cannot do external renovation, is that true?
*
I know that external renovation is extremely limited for strata title. But MR1 is individual title.
kekura
post Jun 5 2014, 04:40 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2003
that compensation need to pay back to mah sing for bank delay on releasing progressive payment.

mine phase 4 already 65% completed but bank so far release only 25%. Already past due date for many months, if calculated i'll need to pay more than 10k penalty... sad.gif(
kekura
post Jun 6 2014, 09:13 AM

Casual
***
Junior Member
322 posts

Joined: Jan 2003
QUOTE(koigh @ Jun 5 2014, 09:10 PM)
Ur loan which bank?
Mine hong leong, so far so good, on time
*
RHB. But bank said is because the lawyer did not give them instruction to pay yet. Checked with the lawyer, they said need to verify claims first before can release instruction. So nothing can be done, just sit back and watch.
kekura
post Jun 16 2014, 02:04 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2003
QUOTE(jason_chee @ Feb 25 2014, 06:16 PM)
no Unifi available in Rawang yet. I've been waiting for the past 2 years. I'm using 2MB Streamyx and recently being offered 4MB but i rejected cos i heard it's not that stable.
*
I think unifi will reach rawang very soon. First offered will be KPJ Rawang.

KPJ hospital installs Telekom Malaysia's patient hospitality suite - See more at: http://www.computerworld.com.my/resource/a...h.uNoj7r2j.dpuf

kekura
post Jul 1 2014, 03:26 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2003
previously, the sales did mention to me that residents need to use access card to enter gate...
kekura
post Jul 3 2014, 09:44 AM

Casual
***
Junior Member
322 posts

Joined: Jan 2003
latest land clearing around M Residence. Too bad not able to get the other half (further left side).

Attached Image
kekura
post Jul 4 2014, 12:16 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2003
QUOTE(jason_chee @ Jul 4 2014, 11:48 AM)
that north landbank also belong to MS. perhaps commercial / apartment development. I suspect Apartment Development. anyone has any insider news?
*
sales said it's for apartment development. maybe Mah Sing want to make like Southville apartments. but rawang has no market for condo/apartment...
kekura
post Jul 8 2014, 02:13 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2003
Google Earth > Historical Image.

share if you see other interesting things.
kekura
post Jul 15 2014, 06:09 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2003
QUOTE(koigh @ Jul 15 2014, 02:15 PM)
Very disappointed with them....they made the guard house bigger to attract sales only...below is today update....we should complain again
*
this is weird. they are willing to spend more $$$ just to break the guard house.
kekura
post Aug 12 2014, 05:19 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2003
QUOTE(hankie90 @ Aug 12 2014, 03:42 PM)
Is the plan of constructing THE TWO shopping mall finalized? or its just a proposal? whistling.gif
*
If drive through PLUS towards north pass the Rawang exit, can see the big signboard on the right "The TWO location is here" or something like that. The site is being cleared I think the work has started.
kekura
post Aug 18 2014, 09:21 AM

Casual
***
Junior Member
322 posts

Joined: Jan 2003
QUOTE(bennycfw @ Aug 17 2014, 07:21 PM)
Phase 1 Layout Plan as per attachment

*
looks like only the outer road (Jalan MR 1/9, 1/8) are 50 feet while other roads (Jalan MR1/11 and others) are 40 feet. Same like Ph2.


how about ph4.. can share please?
kekura
post Aug 21 2014, 06:02 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2003
QUOTE(venz @ Aug 19 2014, 10:38 AM)
Anyone can verify on this? Guard house is not built yet for phase 1?
*
I think this is limitation for non-strata title. The guard house cannot be simply built. Same like why brick fenced is not allowed for non-strata residential.

Take example, Kinrara Residences (also by Mah Sing) is split into 2 - one under strata, one under individual. Under strata got guard house, but under individual no guard house...

kekura
post Sep 4 2014, 12:48 PM

Casual
***
Junior Member
322 posts

Joined: Jan 2003
got picture of the slope?
kekura
post Sep 6 2014, 11:03 AM

Casual
***
Junior Member
322 posts

Joined: Jan 2003
QUOTE(37 Exposures @ Sep 5 2014, 07:39 PM)
Try it today, very tight security, they are not allow me to go in! Congrat, guys!
*
Security better be good. Its critical to the residents.

Recent cases at Bandar Tasik Puteri, many cars window broken to steal smartag. At country homes, toyota owners got hijacked and stolen on the move. Nearby jalan kundang, motor riders stop vehicles to rob. At rawang town, shops break ins nonstop, even aircond compressors stolen at the outside walls...

3 Pages < 1 2 3 >Top
 

Change to:
| Lo-Fi Version
0.0752sec    0.60    7 queries    GZIP Disabled
Time is now: 4th December 2025 - 01:18 PM