Welcome Guest ( Log In | Register )

3 Pages  1 2 3 >Bottom

Outline · [ Standard ] · Linear+

 Irresponsible Contractor - Kejuruteraan Keris Emas, irresponsible and runaway

views
     
TSsilverong
post Sep 27 2011, 10:42 AM, updated 15y ago

Casual
***
Junior Member
344 posts

Joined: Mar 2010


Hi there,

Just a share story for my renovation which start on last year.

About Sept 2010, I had appointed Kejuruteraan Keris Emas to renovate my house in Puchong.
On Oct and Nov 2010, the work progress is quite fast and I'm quite happy with that. However, start from Dec 2010, the work all stop and hardly to find the contractor name Indra Haliz. Everytime once his pick up my call (sometime I had to use different phone number to call him), he will provide bunch of reasons, e.g. waiting for parts, workers runaway, his vendor still pending and bla bla bla...

On Feb/Mar 2011, I managed to get his family and he come to me said that he will continue the rest of work. Again, he just show few times and only done 90% of my landscaping (this is another story again within him and the guy who doing the landscaping, it is also unhappy), but later on also doesn't show up and pickup my calls. Has contact his family again, his family told that he said there already too much works on my house and lossing so much of $$, should not continue my works. I just $%^$^#^#$% and again his family also totally does not pick up the calls.

On Apr 2011, finally I have made a police report and reported to tribunal court.

Below is the items which haven't complete:
1. Autogate system does not deliver and install.
2. Kitchen table top and cabinet does not deliver and built/setup.
3. 1 toilet does not tiles (originally I didn't plan to change the tiles but he dismantled my tiles due to mistake)
4. all toilet accessories include the toilet bowl does not install and 1 toilet bowl installed in wrong toilet which the size if different.
5. number of downlights install less than per contract agreement stated.
6. Autogate door comes with cheap quality but not follow the design that I choose, but still charge my RM4k+ included the autogate system as per contract.
7. Air con points and some power points does not install.

On May/June 2011, I have appointed new contractor and below is the more finding and fixing:

1. Water leak on extended kitchen, required to redo the waterproof system.
2. Change the lamps in L-box from fluorescent lamp to T5 and redo the wiring.
3. The wiring mostly just loop and loop, some wiring redo only (recently found the sockets on dining room does not provide enough power)
4. Extended kitchen landscaping does not doing well, one side of the wall is just 110 degree but not 90 degree.

Below is the information regards Kejuruteraan Keris Emas and Contractor information:

Forum ID: AzimAdhwa
Kejuruteraan Keris Emas
ROB: SA0056842U
Name: Indra Haliz
Birthday: 21 Sept 1986
H/P: 019-3795792
Phone: 03-33746963
Email: kkerisemas@yahoo.com
Address: LOT 449, JALAN SUNGAI BERTIK, 41100 Klang, Selangor
CIMB Bank Acc: 12210009564057
Maybank Acc: 162544000249

Until now he still haven't return me the advance payment and also the defect works, but I still saw he is active in the forum, so now has wrote this topic and inform all the forumers to beware of this.

Thanks.


kelvyn
post Sep 27 2011, 11:15 AM

Look at all my stars!!
*******
Senior Member
3,173 posts

Joined: May 2007
Bro,

Sorry to hear of your renovation contractor nightmare.
Why don't you put them up in this thread for other to decide for themselves and not get con by these people.

Bad Contractors
weikee
post Sep 27 2011, 11:26 AM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
Only pay by job done. Initial work maybe 10% to 15% is good to make the ball rolling.
ssshk
post Sep 27 2011, 01:21 PM

Getting Started
**
Junior Member
75 posts

Joined: Sep 2008
sorry to hear that.. how is your court case now? did he show up in the court?
@Adele
post Sep 27 2011, 01:53 PM

Regular
******
Senior Member
1,042 posts

Joined: Feb 2011
bro very sorry on ur predicament. It sucks and is a nightmare..fyi. I believe.he is still quoting for jobs..
TSsilverong
post Sep 27 2011, 03:30 PM

Casual
***
Junior Member
344 posts

Joined: Mar 2010


to kelvyn: thanks bro, i just copy and paste to the Bad Contractors list.

to weikee: yup.. should do it like tht previously.. but since it happens.. let it past

to ssshk: nope.. he didn't.

to @adele: yup.. i saw it and in few forums.. so plan to inform everyone.


weikee
post Sep 27 2011, 03:44 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
You mean this one

http://forum.lowyat.net/topic/1287668/+100
Jo_da48
post Sep 27 2011, 03:47 PM

Regular
******
Senior Member
1,529 posts

Joined: Feb 2011
From: PJ


bad guy....how many people kena con by him. Guess he prefer ease jobssss


kelvyn
post Sep 27 2011, 03:51 PM

Look at all my stars!!
*******
Senior Member
3,173 posts

Joined: May 2007
QUOTE(weikee @ Sep 27 2011, 04:44 PM)
hahaha... He listed himself as Good Contractor woh... That was quite cunning hmm.gif
kamion
post Sep 27 2011, 04:05 PM

Casual
***
Junior Member
327 posts

Joined: Feb 2011
What a nightmare! Sorry to hear of your problems, silverong. sad.gif
SUSahter
post Sep 27 2011, 04:34 PM

Getting Started
**
Junior Member
266 posts

Joined: Jul 2008
asked for quotation from this fella but didn't reply, may be too small for him to cheat on me .....
weikee
post Sep 27 2011, 04:36 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
QUOTE(kelvyn @ Sep 27 2011, 03:51 PM)
hahaha... He listed himself as Good Contractor woh... That was quite cunning hmm.gif
*
His own measurement mah.
buzzle25
post Sep 27 2011, 04:37 PM

Getting Started
**
Junior Member
114 posts

Joined: Jul 2011
QUOTE(ahter @ Sep 27 2011, 04:34 PM)
asked for quotation from this fella but didn't reply, may be too small for him to cheat on me .....
*
can also consider as blessing in disguise tongue.gif
wrb7878
post Sep 27 2011, 04:45 PM

Enthusiast
*****
Senior Member
843 posts

Joined: Oct 2008


wow...finally he cant cari makan here any more.
he got come to my house quote me b4. luckly he din come back to me the quotation...

but i may not give my work to him...cos he is look young...around 25-30 only.

This post has been edited by wrb7878: Sep 27 2011, 04:45 PM
wrb7878
post Sep 27 2011, 04:54 PM

Enthusiast
*****
Senior Member
843 posts

Joined: Oct 2008


This is what his PM:

Dec 6 2010, 09:18 PM
now i'm in tmn putra prima at puchong..seksyen 25 completed..

if u want visit my last project at PV12 or Laman Seri Business Centre at Seksyen 13 Shah Alam (office)..

Mar 1 2011, 05:35 AM
a little busy for this month..
actually for April I'm free for others work/renovation..
all settle in March..
normally to get your key and S&P Agreement it takes time..it's ok
just update to me when u are ready
thanks...


Added on September 27, 2011, 4:57 pmSo TS, the tmn putra prima at puchong is refer to your unit?
according to him he complete on DEC 2010.....


Added on September 27, 2011, 5:03 pmi just notice TS put his birthday 21 Sept 1986...means he is just 25 ONLY.

This post has been edited by wrb7878: Sep 27 2011, 05:03 PM
Neoh1979
post Sep 27 2011, 08:47 PM

Regular
******
Senior Member
1,811 posts

Joined: Feb 2011
Dam I hate con-tractor...it's such bad experience
to house owner...all those headache n Somemore
run away
Jo_da48
post Sep 27 2011, 09:00 PM

Regular
******
Senior Member
1,529 posts

Joined: Feb 2011
From: PJ


How could track if he rename the ID / email address on here?

kelvyn
post Sep 27 2011, 09:18 PM

Look at all my stars!!
*******
Senior Member
3,173 posts

Joined: May 2007
He could always register another ID, new email address, contact no., etc. However a person's face can never change.
So, putting up his photo will help others.
wrb7878
post Sep 27 2011, 10:04 PM

Enthusiast
*****
Senior Member
843 posts

Joined: Oct 2008


QUOTE(kelvyn @ Sep 27 2011, 09:18 PM)
He could always register another ID, new email address, contact no., etc. However a person's face can never change.
So, putting up his photo will help others.
*
Ask him to put his previous project, he did ask me to visit PV12 condo on his past project.
he come to quote me end up din give me quotation.
kelvyn
post Sep 27 2011, 10:10 PM

Look at all my stars!!
*******
Senior Member
3,173 posts

Joined: May 2007
QUOTE(wrb7878 @ Sep 27 2011, 11:04 PM)
Ask him to put his previous project, he did ask me to visit PV12 condo on his past project.
he come to quote me end up din give me quotation.
*
Probably you did not look like a big "water fish", that's why didn't quote you. biggrin.gif

3 Pages  1 2 3 >Top
 

Change to:
| Lo-Fi Version
0.0213sec    0.65    5 queries    GZIP Disabled
Time is now: 13th December 2025 - 11:14 PM