 Duet Residence @ Bandar Kinrara

views
     
HappyChillax
post Jul 13 2017, 02:43 PM

New Member
*
Newbie
2 posts

Joined: Jul 2017
Latest update, they have obtained CCC, and started for inspection and key collection.


This post has been edited by HappyChillax: Jul 14 2017, 06:40 PM
aurora97
post Jul 26 2017, 02:23 PM

八方來財
*******
Senior Member
3,790 posts

Joined: Aug 2007



Helped a friend to do defect liability.

All I can say… omg.

natman
post Jul 26 2017, 09:31 PM

Look at all my stars!!
*******
Senior Member
2,908 posts

Joined: Aug 2011
QUOTE(aurora97 @ Jul 26 2017, 02:23 PM)
Helped a friend to do defect liability.

All I can say… omg.
*

any photo to share ?
SUSempatTan
post Jul 26 2017, 09:47 PM

Regular
******
Senior Member
1,678 posts

Joined: Mar 2016


QUOTE(aurora97 @ Jul 26 2017, 02:23 PM)
Helped a friend to do defect liability.

All I can say… omg.
*
Ooohh...
aurora97
post Jul 27 2017, 10:27 AM

八方來財
*******
Senior Member
3,790 posts

Joined: Aug 2007



QUOTE(natman @ Jul 26 2017, 09:31 PM)
any photo to share  ?
*
I didn’t take any pictures that day, was so tired and besides it was partly done.

I started defect liability inspection at 4pm, ended about 7pm. Had to do a rush job because my friend’s entire family was there. They thought defect liability checks are short and quick. Boy they were in for a surprise. Haha… I even conscripted my friend’s children to help out.

Am not an expert in construction matters but I can roughly identify them from previous experience.

Areas I check that day include:
1. Foyer
2. Dining Area
3. Living Area
4. Dry Kitchen
5. Balcony 1
6. Master bedroom
7. Master bedroom toilet
8. Balcony 2
9. Bedroom 2.
10. common toilet

Remaining
10. Bedroom 1
11. Wet Kitchen
12. Storeroom
13. Yard.

summerssh
post Jul 30 2017, 08:20 PM

New Member
*
Newbie
2 posts

Joined: Oct 2007
QUOTE(aurora97 @ Jul 27 2017, 10:27 AM)
I didn’t take any pictures that day, was so tired and besides it was partly done.

I started defect liability inspection at 4pm, ended about 7pm. Had to do a rush job because my friend’s entire family was there. They thought defect liability checks are short and quick. Boy they were in for a surprise. Haha… I even conscripted my friend’s children to help out.

Am not an expert in construction matters but I can roughly identify them from previous experience.

Areas I check that day include:
1. Foyer
2. Dining Area
3. Living Area
4. Dry Kitchen
5. Balcony 1
6. Master bedroom
7. Master bedroom toilet
8. Balcony 2
9. Bedroom 2.
10. common toilet

Remaining
10. Bedroom 1
11. Wet Kitchen
12. Storeroom
13. Yard.
*
Aurora97, I went to c and it's omg too. Jus wonder hav you realize the toilet design is weird and also the toilet door size? It's smaller than standard size!!
aurora97
post Jul 31 2017, 12:05 PM

八方來財
*******
Senior Member
3,790 posts

Joined: Aug 2007



QUOTE(summerssh @ Jul 30 2017, 08:20 PM)
Aurora97, I went to c and it's omg too. Jus wonder hav you realize the toilet design is weird and also the toilet door size? It's smaller than standard size!!
*
I don’t know whether the toilet is smaller than usual and the toilet door size is abnormal or otherwise.

In any case, there is a provision in the Sales and Purchase Agreement that deal with this (NOTE: APOLOGIES in advance, am using the old Schedule H (2002) but I think this provision is unchanged)

Position and area of Parcel 13.
» Click to show Spoiler - click again to hide... «


I suggest that after you have done your defect rectification, you immediate request for a copy of the building plan, more specifically for your unit. You will than need to measure your unit to see if its similar to the building plan.

aurora97
post Aug 7 2017, 01:43 PM

八方來財
*******
Senior Member
3,790 posts

Joined: Aug 2007



Hi All, some of the defects i have discovered. Not sure if they are or not, I will let the developer explain to owner.

The wooden floor, kitchen cabinet, free items given by developer and small toilet excluded from this checking because owner has other plans. Meanwhile, my 2 cents worth, the wooden flooring is badly done and wear and tear has really took its toll. The gaps and split ends are huge headache.

Consolation?
1. the wall is quite flat.
2. the door frames are solid except when you reach the base of the frames, i think they covered it with plaster and they made a hash out of it.
3. overall the house is quite bright and well lit but the kitchen, small toilet and yard quite dark.

Did not see common area, so no comments.

This post has been edited by aurora97: Aug 7 2017, 01:49 PM


Attached thumbnail(s)
Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image
KL HellBoy
post Aug 7 2017, 04:28 PM

Getting Started
**
Junior Member
70 posts

Joined: Apr 2014
QUOTE(aurora97 @ Aug 7 2017, 01:43 PM)
Hi All, some of the defects i have discovered. Not sure if they are or not, I will let the developer explain to owner.

The wooden floor, kitchen cabinet, free items given by developer and small toilet excluded from this checking because owner has other plans. Meanwhile, my 2 cents worth, the wooden flooring is badly done and wear and tear has really took its toll. The gaps and split ends are huge headache.

Consolation?
1. the wall is quite flat.
2. the door frames are solid except when you reach the base of the frames, i think they covered it with plaster and they made a hash out of it.
3. overall the house is quite bright and well lit but the kitchen, small toilet and yard quite dark.

Did not see common area, so no comments.
*
Big window panels, nice view
summerssh
post Aug 7 2017, 05:06 PM

New Member
*
Newbie
2 posts

Joined: Oct 2007
QUOTE(aurora97 @ Jul 31 2017, 12:05 PM)
I don’t know whether the toilet is smaller than usual and the toilet door size is abnormal or otherwise.

In any case, there is a provision in the Sales and Purchase Agreement that deal with this (NOTE: APOLOGIES in advance, am using the old Schedule H (2002) but I think this provision is unchanged)

Position and area of Parcel 13.
» Click to show Spoiler - click again to hide... «


I suggest that after you have done your defect rectification, you immediate request for a copy of the building plan, more specifically for your unit. You will than need to measure your unit to see if its similar to the building plan.
*
Thanks for your info.. I hav write in to claim for LAD of delay while waiting my defects to be fixed. Hopefully my defects will be fix well.
aurora97
post Aug 7 2017, 05:37 PM

八方來財
*******
Senior Member
3,790 posts

Joined: Aug 2007



QUOTE(summerssh @ Aug 7 2017, 05:06 PM)
Thanks for your info.. I hav write in to claim for LAD of delay while waiting my defects to be fixed. Hopefully my defects will be fix well.
*
Here you go LAD letter i drafted for my friend. Is copied from House Buyer Association Web Site with some slight modifications.

» Click to show Spoiler - click again to hide... «


Calculation of LAD:-

To calculate LAD, your SPA state that the condo need to be completed 36 months from SPA date.

Basically, it is End of 36 months calculated up to VP date. (approximately 600+ days overdue)

» Click to show Spoiler - click again to hide... «



aurora97
post Aug 7 2017, 06:03 PM

八方來財
*******
Senior Member
3,790 posts

Joined: Aug 2007



QUOTE(KL HellBoy @ Aug 7 2017, 04:28 PM)
Big window panels, nice view
*
The view is nice, almost 180 degree view of Bandar Kinrara (to the rear u have the forest reserve, you have terrace houses on both flanks, semi-D/bungalows in front and the golf course etc…).

Also, noteworthy is the security feature of the condo is pretty good, if they gone the extra-mile to do it up properly, it would have been the best condo in Kinrara. Can see the developer made some effort but alas…


KL HellBoy
post Aug 7 2017, 06:55 PM

Getting Started
**
Junior Member
70 posts

Joined: Apr 2014
QUOTE(aurora97 @ Aug 7 2017, 06:03 PM)
The view is nice, almost 180 degree view of Bandar Kinrara (to the rear u have the forest reserve, you have terrace houses on both flanks, semi-D/bungalows in front and the golf course etc…).

Also, noteworthy is the security feature of the condo is pretty good, if they gone the extra-mile to do it up properly, it would have been the best condo in Kinrara. Can see the developer made some effort but alas…
*
Can share why VP delayed for so long? It looked completed many months ago
aurora97
post Aug 7 2017, 07:57 PM

八方來財
*******
Senior Member
3,790 posts

Joined: Aug 2007



QUOTE(KL HellBoy @ Aug 7 2017, 06:55 PM)
Can share why VP delayed for so long? It looked completed many months ago
*
My guess is as good as yours. smile.gif
natman
post Aug 7 2017, 09:28 PM

Look at all my stars!!
*******
Senior Member
2,908 posts

Joined: Aug 2011
QUOTE(aurora97 @ Aug 7 2017, 05:37 PM)
Here you go LAD letter i drafted for my friend. Is copied from House Buyer Association Web Site with some slight modifications.

» Click to show Spoiler - click again to hide... «


Calculation of LAD:-

To calculate LAD, your SPA state that the condo need to be completed 36 months from SPA date.

Basically, it is End of 36 months calculated up to VP date. (approximately 600+ days overdue)

» Click to show Spoiler - click again to hide... «

*
Seriously 600 days ?wow !
JonathanIB
post Aug 9 2017, 06:47 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


Really? So long? 600 days OMG
8th Street Home Makeover
post Aug 9 2017, 07:45 PM

New Member
*
Newbie
5 posts

Joined: Aug 2017
Received a request for Painting and furnishing services From an owner here

He wants us To also check the units for defects.

Hope not Too many in his unit So My work can Move decently fast


Sueshas2017
post Aug 28 2017, 03:55 PM

New Member
*
Newbie
2 posts

Joined: Aug 2017
QUOTE(MrProperty.me @ Aug 28 2011, 07:51 PM)

Duet Residence a new residential project in Bandar Kinrara (between BK6 Hening and Melodi) will be selling at RM450psf. Any room for it to go beyond RM500 in 1-2 years time? Or will it need longer time to hit that? 

http://mrproperty.me/wp-content/uploads/2011/08/1.jpg 
*


sad.gif any new update for duet residence? anyone?
Sueshas2017
post Aug 28 2017, 03:57 PM

New Member
*
Newbie
2 posts

Joined: Aug 2017
QUOTE(JonathanIB @ Jun 28 2017, 10:38 AM)
I passby there
Completed but yet handover
*
I tried calling the developer but unable to reach....any idea on the latest updates on duet residence Block B?
Please update if anyone have latest updates.
thank you.

This post has been edited by Sueshas2017: Aug 28 2017, 03:58 PM
1282009
post Jan 1 2018, 02:21 AM

Look at all my stars!!
*******
Senior Member
4,230 posts

Joined: Jan 2009
QUOTE(JonathanIB @ Aug 9 2017, 06:47 PM)
Really? So long? 600 days OMG
*
I almost bought a unit here last time during its pre launching.. sad.gif