QUOTE(aurora97 @ Jul 27 2017, 10:27 AM)
I didn’t take any pictures that day, was so tired and besides it was partly done.
I started defect liability inspection at 4pm, ended about 7pm. Had to do a rush job because my friend’s entire family was there. They thought defect liability checks are short and quick. Boy they were in for a surprise. Haha… I even conscripted my friend’s children to help out.
Am not an expert in construction matters but I can roughly identify them from previous experience.
Areas I check that day include:
1. Foyer
2. Dining Area
3. Living Area
4. Dry Kitchen
5. Balcony 1
6. Master bedroom
7. Master bedroom toilet
8. Balcony 2
9. Bedroom 2.
10. common toilet
Remaining
10. Bedroom 1
11. Wet Kitchen
12. Storeroom
13. Yard.
Aurora97, I went to c and it's omg too. Jus wonder hav you realize the toilet design is weird and also the toilet door size? It's smaller than standard size!!I started defect liability inspection at 4pm, ended about 7pm. Had to do a rush job because my friend’s entire family was there. They thought defect liability checks are short and quick. Boy they were in for a surprise. Haha… I even conscripted my friend’s children to help out.
Am not an expert in construction matters but I can roughly identify them from previous experience.
Areas I check that day include:
1. Foyer
2. Dining Area
3. Living Area
4. Dry Kitchen
5. Balcony 1
6. Master bedroom
7. Master bedroom toilet
8. Balcony 2
9. Bedroom 2.
10. common toilet
Remaining
10. Bedroom 1
11. Wet Kitchen
12. Storeroom
13. Yard.