Welcome Guest ( Log In | Register )

3 Pages  1 2 3 >Bottom

Outline · [ Standard ] · Linear+

 Bandar Putera 2 , Klang, worth buying?

views
     
TScrazeeclan
post Mar 16 2011, 10:55 AM, updated 10y ago

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



When to see the show room last weekend. Price really promising at below 300k for a double story. Is it worth to buy for staying ?

http://www.ioiproperties.com.my/bdrputerak...ntlaunches.cfm#
SUSNew Klang
post Mar 16 2011, 12:56 PM

Look at all my stars!!
*******
Senior Member
4,998 posts

Joined: Dec 2010
QUOTE(crazeeclan @ Mar 16 2011, 10:55 AM)
When to see the show room last weekend. Price really promising at below 300k for a double story. Is it worth to buy for staying ?

http://www.ioiproperties.com.my/bdrputerak...ntlaunches.cfm#
*
What is the built up, land area, finishing?
wister
post Mar 16 2011, 02:16 PM

Casual
***
Junior Member
322 posts

Joined: Nov 2006


interesting! but its leasehold.
TScrazeeclan
post Mar 21 2011, 11:34 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(New Klang @ Mar 16 2011, 12:56 PM)
What is the built up, land area, finishing?
*
built up approx 20 x 70 around 1400 + sqf


Added on March 21, 2011, 11:35 am
QUOTE(wister @ Mar 16 2011, 02:16 PM)
interesting! but its leasehold.
*
tht is the negative point but who cares...im not going to stay up to 99 years.... rclxms.gif

This post has been edited by crazeeclan: Mar 21 2011, 11:35 AM
mrPOTATO
post Mar 21 2011, 11:56 AM

Look at all my stars!!
*******
Senior Member
2,113 posts

Joined: Dec 2008


Quite good location near kota kemuning. Surroundings relatively underdeveloped. Can bypass kesas toll easily. Developer provide fencing+guardhouse. Building shops in front of road. Can consider if u don't like to stay in codos. ..
22222222
post Mar 21 2011, 12:01 PM

Regular
******
Senior Member
1,549 posts

Joined: Nov 2010
QUOTE(crazeeclan @ Mar 21 2011, 11:34 AM)
built up approx 20 x 70 around 1400 + sqf


Added on March 21, 2011, 11:35 am

tht is the negative point but who cares...im not going to stay up to 99 years.... rclxms.gif
*
Actually, the lease left 90 yrs.
TScrazeeclan
post Mar 21 2011, 03:36 PM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(22222222 @ Mar 21 2011, 12:01 PM)
Actually, the lease left 90 yrs.
*
yeah 90 years.....but still i wont be staying there till that long...hehe....
wister
post Mar 21 2011, 03:44 PM

Casual
***
Junior Member
322 posts

Joined: Nov 2006


So TS, are you going to get 1?

From the sales person, it seem that launch (Nov) till now, only manage to sell arnd 50% of all the units.
pooh88
post Mar 21 2011, 03:47 PM

Malaysia Tennis Enthusiast
*******
Senior Member
2,367 posts

Joined: Jan 2003
From: Klang



How come Klang so limited developer. hmm.gif
All houses all overprice. shakehead.gif
Any hidden house still within Klang budget range!! rclxub.gif

22222222
post Mar 21 2011, 03:49 PM

Regular
******
Senior Member
1,549 posts

Joined: Nov 2010
QUOTE(crazeeclan @ Mar 21 2011, 03:36 PM)
yeah 90 years.....but still i wont be staying there till that long...hehe....
*
haha....yalor...when the time reach end of the world oledi.... tongue.gif

Anywhere, it will pass down the debt to next generation....some news said that renew lease title needed 100k in PJ area. When 90 years come, dun know how much need to pay...maybe 300k oledi.... biggrin.gif

If can, please avoid leasehold property... nod.gif
gjohn
post Mar 21 2011, 03:56 PM

Casual
***
Junior Member
388 posts

Joined: Oct 2008
kota kemuning???waaaa...to me it's far...
un less ur working in klang..maybe its a good buy
xepa
post Mar 21 2011, 05:51 PM

Casual
***
Junior Member
367 posts

Joined: Dec 2010
QUOTE(pooh88 @ Mar 21 2011, 03:47 PM)
How come Klang so limited developer. hmm.gif
All houses all overprice. shakehead.gif
Any hidden house still within Klang budget range!! rclxub.gif
*
what's the Klang budge range ???
Klang a lot of freehold properties but putera is good for those working in kl due to easy accesibility to kesas
TScrazeeclan
post Mar 24 2011, 05:58 PM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(wister @ Mar 21 2011, 03:44 PM)
So TS, are you going to get 1?

From the sales person, it seem that launch (Nov) till now, only manage to sell arnd 50% of all the units.
*
yeah...already get it....payed the booking fee ady....
dripinrain
post Mar 24 2011, 09:26 PM

Getting Started
**
Junior Member
265 posts

Joined: Sep 2007


QUOTE(Scissorshand @ Mar 24 2011, 09:21 PM)
Am staying here, too many indians, robberies, hooligans, gangsters but am moving out to Setia Alam soon, more chinese, better township
*
Indians ? hmm.gif Sure bo.. the township stil under construction, around there is mostly agriculture land.
xepa
post Mar 25 2011, 06:09 PM

Casual
***
Junior Member
367 posts

Joined: Dec 2010
putera not sure but heard puteri a lot indians
TScrazeeclan
post Mar 29 2011, 11:54 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(dripinrain @ Mar 24 2011, 09:26 PM)
Indians ?  hmm.gif  Sure bo.. the township stil under construction, around there is mostly agriculture land.
*
yeah...there mostly agriculture land...only got small portion of malay kampung beside...
senapang
post Nov 21 2011, 08:20 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
hi there,

i also bought 1 unit...but the single story one...

mine was CADIA type....so any neighbor here?

TS, how much u bought CASSIA? last time i saw rm350k++...donno how much during launch...
NelsonBoy
post Nov 22 2011, 09:03 PM

l Audio Paradise l
******
Senior Member
1,120 posts

Joined: May 2006
From: Klang, Serdang, Seri Kembangan,Cheras



QUOTE(senapang @ Nov 21 2011, 08:20 PM)
hi there,

i also bought 1 unit...but the single story one...

mine was CADIA type....so any neighbor here?

TS, how much u bought CASSIA? last time i saw rm350k++...donno how much during launch...
*
urs about rm250k
am i correct ?


netcrawler
post Nov 22 2011, 09:40 PM

Regular
******
Senior Member
1,542 posts

Joined: Jan 2005
From: Seri Kembangan


QUOTE(dripinrain @ Mar 24 2011, 09:26 PM)
Indians ?  hmm.gif  Sure bo.. the township stil under construction, around there is mostly agriculture land.
*
anything wrong with Indian? Please don't be racist as majority of Indian are good citizens. Only small portion especially those
living near Taman Sentosa are notorious for their gangster-ism. Then again. goverment should be blame for not treat them equally.
senapang
post Nov 23 2011, 01:00 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
@NelsonBoy, mine 280k the end unit one...
dripinrain
post Nov 23 2011, 02:34 PM

Getting Started
**
Junior Member
265 posts

Joined: Sep 2007


QUOTE(netcrawler @ Nov 22 2011, 09:40 PM)
anything wrong with Indian? Please don't be racist as majority of Indian are good citizens. Only small portion especially those
living near Taman Sentosa are notorious for their gangster-ism. Then again. goverment should be blame for not treat them equally.
*
Ur pissing at the wrong tree bro. I got indian colleagues here.
senapang
post Nov 24 2011, 08:02 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
hmmm...the environment there seems like kampung abit..maybe bcoz of the surrounding still lot of agriculture land...

hope after ioi develop this area, there will be more developer join to transform this area into residential or commercial...hmmm maybe takes time...5-10 years...
senapang
post Nov 29 2011, 01:01 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
last week went to visit the site...

here some latest update on the project CADIA 1 story terrace..mine is the end lot 1 facing field

Attached Image Attached Image Attached Image

Here the next row (next to my unit)
Attached Image

And also visit the new mock up unit
Attached Image Attached Image Attached Image
Attached Image

and here the available unit left...
Attached Image

dragon_lee
post Jan 31 2012, 08:15 AM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



Date of completion of Cassia is Sept this year.

Went to the site, not bad, quite nicely planned and the best part is Guarded with Perimeter Fencing.

5 mins to Kota Kemuning & Bukit Rimau.

However recently spotted a big piece of land is being developed next to Kesas highway..

Anyone has any idea?

Chris Chew
post Jan 31 2012, 09:16 AM

10k Club
********
Senior Member
10,387 posts

Joined: Dec 2011

Seriously i quite impress with the Bandar Puteri and Bandar Putera Klang, however, most Klang folks would advise you in their serious face, dont buy this project ... and go for Bukit Tinggi or Bandar Botanic ....


I never visit these 2 projects then ...
dragon_lee
post Jan 31 2012, 08:44 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



you should do more survey on Bdr Puteri & Bdr Putera by your own smile.gif
oxm8
post Jan 31 2012, 09:28 PM

Regular
******
Senior Member
1,458 posts

Joined: Jul 2011
If u can afford botanic n bkt tinggi then go ahead. If not the puteri, putera n kota bayuemas are good options. Near kesas n jusco too
netcrawler
post Jan 31 2012, 10:01 PM

Regular
******
Senior Member
1,542 posts

Joined: Jan 2005
From: Seri Kembangan


In term of location, Botanic and Bandar Puteri are just side by side. Bukit Tinggi too crowded and high crime rate
dragon_lee
post Feb 1 2012, 12:18 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(oxm8 @ Jan 31 2012, 09:28 PM)
If u can afford botanic n bkt tinggi then go ahead. If not the puteri,  putera n kota bayuemas are good options. Near kesas n jusco too
*
The houses in Bdr Botanic is nice, but no matter how many time i pass by that area, i can see cow walking along the road...hmm..mayb this is call "Green Homes" haha..

Visited Kota Bayuemas's Semi D, very nice design and quite affordable..around rm750K if not mistaken..


Added on February 1, 2012, 12:20 pm
QUOTE(netcrawler @ Jan 31 2012, 10:01 PM)
In term of location, Botanic and Bandar Puteri are just side by side. Bukit Tinggi too crowded and high crime rate
*
True enough, Bdr Botanic and Bdr Puteri are just next to Kesas h/way.. easier to access


Added on February 26, 2012, 5:24 pmVisited the site*Cassia* last week, looks like they are going to build the road and houses are almost complete with some touch up of paint.

Very nicely design with guarded & Perimeter Fencing.

SA mentioned VP tentatively Sept or Oct this year

This post has been edited by dragon_lee: Feb 26 2012, 05:24 PM
senapang
post Feb 27 2012, 02:16 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
i went to the site yesterday n saw that a Alpinia already hand over...

lot of unit change their autogate and grill..

saw 1 end unit upgrade n extend their kitchen...

i'm planning to extend my kitchen when get keys later...so is it any problem in extending kitchen or any space to upgrade the built up area for leasehold properties?

if possible, must be in proper submission la kan? what if we just construct it without the approval, then after completed, can they still charge us due to not get approval?
Bahkuteh
post Mar 17 2012, 10:41 PM

Enthusiast
*****
Senior Member
777 posts

Joined: Nov 2011


If you can afford go for better area. Area from taman sentosa to Bukit kemuning controlled by famous Indian gang 303. They are very terror!
Any Indian bro,pls confirm if I'm right or wrong.
senapang
post Mar 19 2012, 07:49 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
owh is it? i really donno about that gang..

in the master plan saw 1 propose balai polis at the entrance..hope this will settle the gangsterism issue there..

huhu
Bahkuteh
post Mar 21 2012, 01:03 AM

Enthusiast
*****
Senior Member
777 posts

Joined: Nov 2011


Balai polis there will help a lot. Good news.
anandh1677
post Mar 23 2012, 03:33 PM

New Member
*
Junior Member
4 posts

Joined: Mar 2012


Hi, i bought house in Bdr Putera 2, Cassia neighbourhood. hope to have betta community here. plz do update of site. any1 noe whn we getting key, final date?
dragon_lee
post Mar 24 2012, 11:41 AM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(anandh1677 @ Mar 23 2012, 03:33 PM)
Hi, i bought house in Bdr Putera 2, Cassia neighbourhood. hope to have betta community here. plz do update of site. any1 noe whn we getting key, final date?
*
Suppose to be Sept 2012 not sure if there's any changes

This post has been edited by dragon_lee: Mar 24 2012, 11:42 AM
anandh1677
post Apr 10 2012, 11:57 AM

New Member
*
Junior Member
4 posts

Joined: Mar 2012


HARI KOMUNITI BDR PUTERA 2, 15 APR 2012 0800 - 1200. HOPE TO KNOW MORE ABOUT MY COMMUNITY AND NEIGHBOURS. CU ALL THERE.
dragon_lee
post Apr 10 2012, 09:12 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(anandh1677 @ Apr 10 2012, 11:57 AM)
HARI KOMUNITI BDR PUTERA 2, 15 APR 2012 0800 - 1200. HOPE TO KNOW MORE ABOUT MY COMMUNITY AND NEIGHBOURS. CU ALL THERE.
*
Hi Anandh,

Which unit you bought?
ortiz
post Apr 19 2012, 04:17 PM

New Member
*
Junior Member
8 posts

Joined: Dec 2011


Hi All,

Yesterday going around Cassia neighbourhood, road around the house is complete. look like the house work is almost finish. Look like the developer is doing the landscape

Hope can get house key sooner, my friend buy house at alam impian already get the key, 7 month ahesd of schedule
anandh1677
post Apr 27 2012, 06:01 PM

New Member
*
Junior Member
4 posts

Joined: Mar 2012


QUOTE(dragon_lee @ Apr 10 2012, 09:12 PM)
Hi Anandh,

Which unit you bought?
*
Hi Lee, i bought Cassia CI031. hw bout urs?
dragon_lee
post Apr 27 2012, 10:06 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



Hi Anand,

Mine is Cassia as well.

I bought it for investment not for own stay.

Just visited the site few days ago, the road is good and houses are in ready to move in condition.

Since it;s gated *Perimeter Fencing* and guarded, I forsee it's going to be the next potential area after bkt rimau & kota kemuning.

Tentatively will get the key in Sept or Oct 12 according to SA in IOI


Added on April 27, 2012, 10:06 pm
QUOTE(ortiz @ Apr 19 2012, 04:17 PM)
Hi All,

Yesterday going around Cassia neighbourhood, road around the house is complete. look like the house work is almost finish. Look like the developer is doing the landscape 

Hope can get house key sooner, my friend buy house at alam impian already get the key, 7 month ahesd of schedule
*
let's count down, another 5 months to go rclxms.gif

This post has been edited by dragon_lee: Apr 27 2012, 10:06 PM
yattisa
post May 4 2012, 01:26 PM

New Member
*
Newbie
1 posts

Joined: May 2012
QUOTE(anandh1677 @ Apr 27 2012, 06:01 PM)
Hi Lee, i bought Cassia CI031. hw bout urs?
*
Hi my future neighbourhood .. hope to see you there. Me bought unit 103* can't remember. Near TNB house.


Added on May 4, 2012, 1:32 pm
QUOTE(anandh1677 @ Mar 23 2012, 03:33 PM)
Hi, i bought house in Bdr Putera 2, Cassia neighbourhood. hope to have betta community here. plz do update of site. any1 noe whn we getting key, final date?
*
Most of buyer Single Storey are from MDK and PDRM staff. Majority are Malays and hope to have healthy neighborhood and the polices can made this area hormony hopefully.


Added on May 4, 2012, 1:35 pm
QUOTE(anandh1677 @ Mar 23 2012, 03:33 PM)
Hi, i bought house in Bdr Putera 2, Cassia neighbourhood. hope to have betta community here. plz do update of site. any1 noe whn we getting key, final date?
*
hi my future neighbor...

This post has been edited by yattisa: May 4 2012, 01:35 PM
Moonlight86
post May 5 2012, 11:14 PM

Getting Started
**
Junior Member
84 posts

Joined: Aug 2011
Hi, the expectated completion of Basella supposed to be on March 2012, but the CF just issued on end of April 2012. Will the developer compensate due to the late completion?
ericlaiys
post May 9 2012, 09:37 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Hi moonlight,
If i'm not mistaken, the S & P did not mentioned completion date. Let say , the term say 2 years. Then the developer start to compensate from the date of you signing the document. (calculate 2 year from there)

Any Dura owner here?
Bahkuteh
post May 9 2012, 11:39 PM

Enthusiast
*****
Senior Member
777 posts

Joined: Nov 2011


Any flooding issue here?
ortiz
post May 10 2012, 11:12 AM

New Member
*
Junior Member
8 posts

Joined: Dec 2011


Hi my coming soon neighbour.

btw my house is 2nd unit after the security post. (forget the lot no.)

dragon_lee
post May 10 2012, 05:22 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(ericlaiys @ May 9 2012, 09:37 AM)
Hi moonlight,
If i'm not mistaken, the S & P did not mentioned completion date. Let say , the term say 2 years. Then the developer start to compensate from the date of you signing the document. (calculate 2 year from there)

Any Dura owner here?
*
Yes you are right rclxms.gif

Anyway, Cassia owner here thumbup.gif


Added on May 10, 2012, 5:22 pm
QUOTE(Bahkuteh @ May 9 2012, 11:39 PM)
Any flooding issue here?
*
Dont think so, as the land is quite high


Added on May 10, 2012, 5:23 pm
QUOTE(ortiz @ May 10 2012, 11:12 AM)
Hi my coming soon neighbour.

btw my house is 2nd unit after the security post. (forget the lot no.)
*
Hi Ortiz,

Welcome! another 4 months we can get our key whistling.gif

This post has been edited by dragon_lee: May 10 2012, 05:23 PM
ortiz
post May 11 2012, 11:36 AM

New Member
*
Junior Member
8 posts

Joined: Dec 2011


Hi All,

Yesterday go to the site & snap picture of my house (should be same to your house).

The job inside the house i assumed complete, because the gate is locked

The playground have a basketball, badminton & takraw court c/w spotlight. The parking lot for the palyground got line some more, maybe need parking coupon to park there[attachmentid=2835452][attachmentid=2835454]

dragon_lee
post May 12 2012, 12:26 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(ortiz @ May 11 2012, 11:36 AM)
Hi All,

Yesterday go to the site & snap picture of my house (should be same to your house).

The job inside the house i assumed complete, because the gate is locked

The playground have a basketball, badminton & takraw court c/w spotlight. The parking lot for the palyground got line some more, maybe need parking coupon to park there[attachmentid=2835452][attachmentid=2835454]
*
Nice rclxms.gif

Once VP'ed, you can't get this house anything less than RM450K, lets see icon_rolleyes.gif
ortiz
post May 16 2012, 11:01 AM

New Member
*
Junior Member
8 posts

Joined: Dec 2011


My collegue ask the sales person regarding cassia in the middle of april.

Only corner lot available. Price 500k flat. that is 1/2 million ooo.

adieereturns
post May 23 2012, 10:39 AM

New Member
*
Newbie
4 posts

Joined: Jan 2011


hi to all my future neighbours...

i bought basella unit & its already completed. not yet received keys but already make an appointment nex week.

looking forward to move there asap... biggrin.gif

p/s : any suggestion for a good contractor with quality job n fair price for grill?
senapang
post May 23 2012, 11:49 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
QUOTE(adieereturns @ May 23 2012, 10:39 AM)
hi to all my future neighbours...

i bought basella unit & its already completed. not yet received keys but already make an appointment nex week.

looking forward to move there asap...  biggrin.gif

p/s : any suggestion for a good contractor with quality job n fair price for grill?
*
Basella still not vp yet? I tot vp already...my fren also bought 1 unit at basella phase..

Try ronda2 around alpinia...saw so much nice2 grill...just ask them how much the price n who the contractor...
Can make new fren oso...hehe

Mine Cadia....another a year n half month to go....haishhh
adieereturns
post May 24 2012, 04:12 AM

New Member
*
Newbie
4 posts

Joined: Jan 2011


QUOTE(senapang @ May 23 2012, 11:49 PM)
Basella still not vp yet? I tot vp already...my fren also bought 1 unit at basella phase..

Try ronda2 around alpinia...saw so much nice2 grill...just ask them how much the price n who the contractor...
Can make new fren oso...hehe

Mine Cadia....another a year n half month to go....haishhh
*
already got vp.. but so many people already make an appointment with the person incharge to take the keys...
mine is early nex month..


ortiz
post May 28 2012, 11:21 AM

New Member
*
Junior Member
8 posts

Joined: Dec 2011


Hmmm.. want to take house key also need to wait.

That how the world is run right now. everything need to wait.

If anybody got good contractor, please recommend...
mingyew
post May 28 2012, 06:13 PM

Look at all my stars!!
*******
Senior Member
4,177 posts

Joined: Jan 2003
if you need a normal renovation and reasonable price 1, contact zero one six two four nine two six eight eight - ricky. frenly uncle.
anandh1677
post May 31 2012, 10:22 AM

New Member
*
Junior Member
4 posts

Joined: Mar 2012


QUOTE(yattisa @ May 4 2012, 01:26 PM)
Hi my future neighbourhood .. hope to see you there. Me bought unit 103* can't remember. Near TNB house.


Added on May 4, 2012, 1:32 pm
Most of buyer Single Storey are from MDK and PDRM staff.  Majority are Malays and hope to have healthy neighborhood and the polices can made this area hormony hopefully.


Added on May 4, 2012, 1:35 pm
hi my future neighbor...
*
hi... hope to noe u all betta... excited to move in...


Added on May 31, 2012, 10:30 amDear neighbours, Another 4 months to get complete.. hote to have a betta and friendly community... Hope to have community meeting soon, make more frenz. do update here on the progress...

This post has been edited by anandh1677: May 31 2012, 10:30 AM
adieereturns
post Jun 4 2012, 10:33 PM

New Member
*
Newbie
4 posts

Joined: Jan 2011


just got the house key today... already check the house, got a few minor defect.. but nothing major...

really need to move by end of this month b4 my wife deliver my 2nd child.

saw a banner about registration for persatuan penduduk but miss the date... will contact the person incharge later.

wahhh... really excited to move to new home...
ortiz
post Jun 5 2012, 09:16 AM

New Member
*
Junior Member
8 posts

Joined: Dec 2011


QUOTE(adieereturns @ Jun 4 2012, 10:33 PM)
just got the house key today... already check the house, got a few minor defect.. but nothing major...

really need to move by end of this month b4 my wife deliver my 2nd child.

saw a banner about registration for persatuan penduduk but miss the date... will contact the person incharge later.

wahhh... really excited to move to new home...
*
Good news man, got the key already, new baby coming soon.

Enjoy your new home.
TScrazeeclan
post Jun 25 2012, 07:22 PM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



hi to all my future neighbour....im the owner of Cassia C0163. The next lane after the field....hope to see you guys there....keep in touch....
dragon_lee
post Jun 25 2012, 08:04 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(crazeeclan @ Jun 25 2012, 07:22 PM)
hi to all my future neighbour....im the owner of Cassia C0163. The next lane after the field....hope to see you guys there....keep in touch....
*
Hi Bro,

Have you check the VP date?

Understand there might be some delay..maybe on Dec 12 instead of Sept 12
TScrazeeclan
post Jun 26 2012, 08:45 PM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(dragon_lee @ Jun 25 2012, 08:04 PM)
Hi Bro,

Have you check the VP date?

Understand there might be some delay..maybe on Dec 12 instead of Sept 12
*
nop...but my S&P stated is on Nov 2012 for the hand over...why there will be adelay when everything is completed long time ago....is there any one can confirm about this?


Added on July 3, 2012, 3:34 pmwhen there last Sunday ..ronda ronda my hse there....saw a contractor and chit chat with him..he told me that the hse key hand over will be roughly around end of Oct or early of November.he say he got his new from insider.

This post has been edited by crazeeclan: Jul 3 2012, 03:34 PM
dragon_lee
post Jul 4 2012, 09:16 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



Cassia 2 is open for sale.

*Exactly the same like Cassia 20x70*

Facing Kesas close to RM400K now rclxms.gif
Moonlight86
post Jul 5 2012, 08:51 PM

Getting Started
**
Junior Member
84 posts

Joined: Aug 2011
Hi,

I'm Basella owner, if not mistaken, I have already paid for the Quit Rent (cukai tanah) & 1st half Assessment 2012 (cukai pintu), so could I use the receipt issued by IOIProperties for renovation permit application? Or do I need to pay for the cukai tanah and pintu at MPK?
dragon_lee
post Jul 5 2012, 09:09 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



Best to call MPK for more info
oxm8
post Jul 5 2012, 10:33 PM

Regular
******
Senior Member
1,458 posts

Joined: Jul 2011
QUOTE(dragon_lee @ Jul 4 2012, 09:16 PM)
Cassia 2 is open for sale.

*Exactly the same like Cassia 20x70*

Facing Kesas close to RM400K now rclxms.gif
*
wowwwwww
dragon_lee
post Jul 5 2012, 10:44 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(oxm8 @ Jul 5 2012, 10:33 PM)
wowwwwww
*
Lets see whether can push to RM 450K or not.. icon_idea.gif

Visited the site today, fencing is done, road sign is there, basketball court is ready and gardening.

Best part it's near to Kota Kemuning and Bkt Rimau icon_rolleyes.gif
ortiz
post Jul 6 2012, 08:54 AM

New Member
*
Junior Member
8 posts

Joined: Dec 2011


QUOTE(Moonlight86 @ Jul 5 2012, 08:51 PM)
Hi,

I'm Basella owner, if not mistaken, I have already paid for the  Quit Rent (cukai tanah) & 1st half Assessment 2012 (cukai pintu), so could I use the receipt issued by IOIProperties for renovation permit application? Or do I need to pay for the cukai tanah and pintu at MPK?
*
Hi can I how much have paid for Quit Rent (cukai tanah) & 1st half assessment 2012 (cukai pintu). what else need to pay? just asking.

My brother in law bought new house at kajang, need to get (pay) a permit for house renovation including installing a grill & awning. more than 5 house already get surat saman for not displaying the permit when renovation in progress.

I hope it is not apply under MPK
eymc
post Jul 6 2012, 08:56 AM

Enthusiast
*****
Senior Member
852 posts

Joined: Jan 2003
where is the sales office?

TScrazeeclan
post Jul 6 2012, 01:42 PM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(eymc @ Jul 6 2012, 08:56 AM)
where is the sales office?
*
bandar puteri nearby the McDonald....
dragon_lee
post Jul 6 2012, 10:19 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(ortiz @ Jul 6 2012, 08:54 AM)
Hi can I how much have paid for Quit Rent (cukai tanah) & 1st half assessment 2012 (cukai pintu). what else need to pay? just asking.

My brother in law bought new house at kajang, need to get (pay) a permit for house renovation including installing a grill & awning. more than 5 house already get surat saman for not displaying the permit when renovation in progress.

I hope it is not apply under MPK
*
Boss,

Same goes to MPK, you need the permit
azmirsafuan
post Jul 10 2012, 03:49 PM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
Cassia already finished..

Dura still available..I think when i book for Dura still left 36 houses..


dragon_lee
post Jul 10 2012, 08:21 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(azmirsafuan @ Jul 10 2012, 03:49 PM)
Cassia already finished..

Dura still available..I think when i book for Dura still left 36 houses..
*
Hopefully Cassia will get key soon smile.gif
TScrazeeclan
post Jul 11 2012, 12:18 PM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



yeah...fast fast get key so that i can fast fast renovate. ...want to move in before CNY 2013...
azmirsafuan
post Jul 11 2012, 01:27 PM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
QUOTE(crazeeclan @ Jul 11 2012, 12:18 PM)
yeah...fast fast get key so that i can fast fast renovate. ...want to move in before CNY 2013...
*
My Dura only will siap in November next year..another 1 year for me...hopefully IOI will siap construction on time or maybe faster a bit...
dragon_lee
post Jul 11 2012, 10:48 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(crazeeclan @ Jul 11 2012, 12:18 PM)
yeah...fast fast get key so that i can fast fast renovate. ...want to move in before CNY 2013...
*
I'm quite sure they will hand over the key by Dec 12.

Don';t worry, a lot of contractor waiting also smile.gif


TScrazeeclan
post Jul 12 2012, 04:10 PM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(dragon_lee @ Jul 11 2012, 10:48 PM)
I'm quite sure they will hand over the key by Dec 12.

Don';t worry, a lot of contractor waiting also smile.gif
*
my S&P stated is NOv12 hand over. yeah now there is 1 contractor from Klang driving vios ronda ronda there...speak to him and he now got renovation package...
peri peri
post Jul 17 2012, 11:11 AM

10k nonsense talkative club
********
All Stars
11,943 posts

Joined: Mar 2012
From: Kuala Lumpur



QUOTE(dragon_lee @ Jul 4 2012, 09:16 PM)
Cassia 2 is open for sale.

*Exactly the same like Cassia 20x70*

Facing Kesas close to RM400K now rclxms.gif
*
2 storey or 2 1/2 storey? any gallery office to view? thanks
dragon_lee
post Jul 18 2012, 12:25 AM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(peri peri @ Jul 17 2012, 11:11 AM)
2 storey or 2 1/2 storey? any gallery office to view? thanks
*
Boss,

2 Storey, 20X70 Guarded + Perimeter Fencing.

Show unit is available.
peri peri
post Jul 18 2012, 09:08 AM

10k nonsense talkative club
********
All Stars
11,943 posts

Joined: Mar 2012
From: Kuala Lumpur



QUOTE(dragon_lee @ Jul 18 2012, 12:25 AM)
Boss,

2 Storey, 20X70 Guarded + Perimeter Fencing.

Show unit is available.
*
thank you. will find the link to contact the sales office
dragon_lee
post Jul 28 2012, 03:39 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



Rcd letter from IOI.

Cassia @ 90% completion, last stage is VP.
ericlaiys
post Jul 28 2012, 04:55 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Dura -45% completed.
rclxms.gif
dragon_lee
post Jul 28 2012, 07:05 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(ericlaiys @ Jul 28 2012, 04:55 PM)
Dura -45% completed.
rclxms.gif
*
Boss,

Congrats on your purchase. rclxms.gif

Bought for own stay or investment?
azmirsafuan
post Aug 3 2012, 03:50 PM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
QUOTE(ericlaiys @ Jul 28 2012, 04:55 PM)
Dura -45% completed.
rclxms.gif
*
tak sabar nk tgu Dura siap..
dragon_lee
post Aug 3 2012, 10:54 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(azmirsafuan @ Aug 3 2012, 03:50 PM)
tak sabar nk tgu Dura siap..
*
Take some photo everytime you visit the site biggrin.gif

From there you can see stages by stages
azmirsafuan
post Aug 7 2012, 11:24 AM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
maybe after raya will visit the site...
dragon_lee
post Aug 7 2012, 10:34 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(azmirsafuan @ Aug 7 2012, 11:24 AM)
maybe after raya will visit the site...
*
nod.gif
yankicip
post Aug 7 2012, 10:40 PM

Casual
***
Junior Member
391 posts

Joined: Dec 2011
QUOTE(peri peri @ Jul 17 2012, 12:11 PM)
2 storey or 2 1/2 storey? any gallery office to view? thanks
*
Wah peri kor . sapu until here?

Pls update any available cassia2 ok?
dragon_lee
post Aug 8 2012, 10:47 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(yankicip @ Aug 7 2012, 10:40 PM)
Wah peri kor . sapu until here?

Pls update any available cassia2 ok?
*
Boss,

Cassia 2 facing Kesas last month got to know already exceeded RM 400K price point nod.gif


TScrazeeclan
post Aug 10 2012, 09:46 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(dragon_lee @ Aug 8 2012, 10:47 PM)
Boss,

Cassia 2 facing Kesas last month got to know already exceeded RM 400K price point  nod.gif
*
exceeded 400k by developer or 2nd hand ?
angel-face
post Aug 10 2012, 01:52 PM

On my way
****
Senior Member
626 posts

Joined: Jan 2009


bandar putera? is it opposite of bandar puteri?
dragon_lee
post Aug 10 2012, 06:53 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(crazeeclan @ Aug 10 2012, 09:46 AM)
exceeded 400k by developer or 2nd hand ?
*
Boss,

Dev price, imagine sub sale will be how much?

For you to think and enjoy thumbup.gif


Added on August 10, 2012, 6:55 pm
QUOTE(angel-face @ Aug 10 2012, 01:52 PM)
bandar putera? is it opposite of bandar puteri?
*
No. It's near Jln Kebun

This post has been edited by dragon_lee: Aug 10 2012, 06:55 PM
NelsonBoy
post Aug 10 2012, 10:12 PM

l Audio Paradise l
******
Senior Member
1,120 posts

Joined: May 2006
From: Klang, Serdang, Seri Kembangan,Cheras



this area full of open burning .

haze is so terrible.
i am staying nearby bkt tinggi jj.

KSL bandar bestari is even worst !
i wonder those who bought there will regret their whole life.
TScrazeeclan
post Aug 13 2012, 09:28 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(dragon_lee @ Aug 10 2012, 06:53 PM)
Boss,

Dev price, imagine sub sale will be how much?

For you to think and enjoy thumbup.gif


Added on August 10, 2012, 6:55 pm
No. It's near Jln Kebun
*
i can imagine that....hehe... drool.gif


Added on August 13, 2012, 9:29 am
QUOTE(NelsonBoy @ Aug 10 2012, 10:12 PM)
this area full of open burning .

haze is so terrible.
i am staying nearby bkt tinggi jj.

KSL bandar bestari is even worst !
i wonder those who bought there will regret their whole life.
*
yeah...full of open burning...luckily the wind blow upwards towards bukit tinggi...so it wont effect much on bandar putera 2....i know cause im staying at bukit rimau right now.... rclxms.gif

This post has been edited by crazeeclan: Aug 13 2012, 09:29 AM
Glcotan
post Aug 13 2012, 10:04 AM


*******
Senior Member
3,334 posts

Joined: Mar 2011
QUOTE(crazeeclan @ Aug 13 2012, 09:28 AM)
i can imagine that....hehe... drool.gif


Added on August 13, 2012, 9:29 am

yeah...full of open burning...luckily the wind blow upwards towards bukit tinggi...so it wont effect much on bandar putera 2....i know cause im staying at bukit rimau right now.... rclxms.gif
*
but everytime the wind blow at same direction?
dragon_lee
post Aug 13 2012, 08:19 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



[quote=crazeeclan,Aug 13 2012, 09:28 AM]
i can imagine that....hehe... drool.gif


Now what you need to do is sit back, have some pop corn while checking on i props how much is owner letting go later rclxm9.gif
TScrazeeclan
post Aug 15 2012, 11:06 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(Glcotan @ Aug 13 2012, 10:04 AM)
but everytime the wind blow at same direction?
*
Most of the time. Cause the effect on bUkit Rimau is very very minimal compare to bukit tinggi side...
ericlaiys
post Sep 2 2012, 01:53 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(dragon_lee @ Jul 28 2012, 07:05 PM)
Boss,

Congrats on your purchase. rclxms.gif

Bought for own stay or investment?
*
lol...for own stay


Added on September 2, 2012, 1:59 pm
QUOTE(NelsonBoy @ Aug 10 2012, 10:12 PM)
this area full of open burning .

haze is so terrible.
i am staying nearby bkt tinggi jj.

KSL bandar bestari is even worst !
i wonder those who bought there will regret their whole life.
*
Did not notice that when went to site visit every 2 month. But i notice a lot of dust due to lorry . Currently under construction for Cadia and Dura. Saw new phases/block come up after Dura. Anyone know the name of the new phases?

According to my floor plan dura only few blocks but developer has created more block (possible new phases).

This post has been edited by ericlaiys: Sep 2 2012, 01:59 PM
TScrazeeclan
post Sep 3 2012, 09:22 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



latest update....saw around 6 to 7 people from MPK checkin on something at Cassia site last week. Source from my ex neighbor staying opposite cassia now.
SUStikaram
post Sep 3 2012, 09:25 AM

10k Club
********
All Stars
10,722 posts

Joined: Nov 2011
QUOTE(crazeeclan @ Sep 3 2012, 10:22 AM)
latest update....saw around 6 to 7 people from MPK checkin on something at Cassia site last week. Source from my ex neighbor staying opposite cassia now.
*
what is "something"

I hear 2.5 link house launching before depavali.

Good to buy?

This post has been edited by tikaram: Sep 3 2012, 09:26 AM
TScrazeeclan
post Sep 3 2012, 04:26 PM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



i not sure what are they checking. Most probably checkin on the road for the CF i guess....2.5 link house? where?
dragon_lee
post Sep 6 2012, 02:45 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(tikaram @ Sep 3 2012, 09:25 AM)
what is "something"

I hear 2.5 link house launching before depavali.

Good to buy?
*
Boss,

2.5 @ bdr puteri, not putera
SUStikaram
post Sep 6 2012, 04:00 PM

10k Club
********
All Stars
10,722 posts

Joined: Nov 2011
QUOTE(dragon_lee @ Sep 6 2012, 03:45 PM)
Boss,

2.5 @ bdr puteri, not putera
*
ok, thanks
TScrazeeclan
post Sep 26 2012, 10:12 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



any update on Cassia? i saw the first row , the row pararel with guard house got some renovation...is renovation by owner or developer?
dragon_lee
post Sep 26 2012, 09:25 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(crazeeclan @ Sep 26 2012, 10:12 AM)
any update on Cassia? i saw the first row , the row pararel with guard house got some renovation...is renovation by owner or developer?
*
Boss,

Last I heard is touched up work.

You sure that's reno? It's not VP'ed yet and reno is not allowed. nod.gif
TScrazeeclan
post Sep 28 2012, 10:25 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



maybe is touched up i guess...caused i saw the cement mixture machine on front of the house...so i thought is reno...i showroom row and the row facing the field got crack at their garage there...especially the showroom if you guys notice...


Added on September 30, 2012, 2:21 pmbypass Cassia yesterday night and saw there is street light turn on....so i turn in and check....all the house are fic with tnb meter already....syabs meter havent yet....

This post has been edited by crazeeclan: Sep 30 2012, 02:21 PM
jaahaniza
post Oct 27 2012, 12:05 PM

New Member
*
Newbie
4 posts

Joined: Oct 2012
Hi, I am new in this forum. I bouht CADIA for my own stay. read some of the post and saw a few others who will be in the neighbourhood.. looking fwd to meet u guys. last i went to the place, it seems like the house going to complete soon. anyone have good contractor for renovation?


Added on October 27, 2012, 12:31 pm
QUOTE(senapang @ Nov 21 2011, 08:20 PM)
hi there,

i also bought 1 unit...but the single story one...

mine was CADIA type....so any neighbor here?

TS, how much u bought CASSIA? last time i saw rm350k++...donno how much during launch...
*
Hi There, i also bought cadia. excited to move there!! c u around neighbour!! rclxm9.gif

This post has been edited by jaahaniza: Oct 27 2012, 12:31 PM
senapang
post Oct 27 2012, 11:38 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
Yeah..nice to meet u.. smile.gif
ericlaiys
post Oct 28 2012, 12:29 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Anyone got master plan for Bandar Putera Klang 2? Would like to know what's going to built in this area.

Just get an update from developer. My Phase- Dura is now 55% completed.


Added on October 28, 2012, 12:31 pm
QUOTE(jaahaniza @ Oct 27 2012, 12:05 PM)
Hi, I am new in this forum. I bouht CADIA for my own stay. read some of the post and saw a few others who will be in the neighbourhood.. looking fwd to meet u guys. last i went to the place, it seems like the house going to complete soon. anyone have good contractor for renovation?


Added on October 27, 2012, 12:31 pm
Hi There, i also bought cadia. excited to move there!! c u around neighbour!!  rclxm9.gif
*
Heard Top Fellowship do renovation on that area. Not sure good or not.

This post has been edited by ericlaiys: Oct 28 2012, 12:33 PM
senapang
post Oct 29 2012, 03:27 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
i donno is it true or not..

but referring to this http://drsitimariah.blogspot.com/2012/10/m...ketua-umno.html ...some works has been carried out to make sure no flood issues along Johan Setia..
ericlaiys
post Oct 29 2012, 09:10 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Wah lau...I thought Bandar Putera 2 is safe from flood. Izzit flooded to our area as well????

Just read about it here: http://www.nst.com.my/latest/liu-rapped-ov...loods-1.159354#

This post has been edited by ericlaiys: Oct 29 2012, 09:15 PM
senapang
post Oct 29 2012, 10:10 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
QUOTE(ericlaiys @ Oct 29 2012, 09:10 PM)
Wah lau...I thought Bandar Putera 2 is safe from flood. Izzit flooded to our area as well????

Just read about it here: http://www.nst.com.my/latest/liu-rapped-ov...loods-1.159354#
*
donno..but in the picture in the link i posted before..seems like a bit far from the main road as along the main road hv lot of taman...from the pic, seems like kampung which is deeper and far from Jalan Johan Setia main road..

hope our area is safe.. but until now, no complaint regarding flood at bandar putera 2..
ericlaiys
post Nov 2 2012, 10:29 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Oh man...flash flood again:- http://thestar.com.my/news/story.asp?file=...2923&sec=nation

Just check Google map. Look like we are far a bit from the flood area.

This post has been edited by ericlaiys: Nov 2 2012, 10:37 PM


Attached thumbnail(s)
Attached Image
nadhir.nadz
post Nov 3 2012, 06:45 PM

Getting Started
**
Junior Member
69 posts

Joined: May 2012
From: Malaysia


QUOTE(senapang @ Oct 29 2012, 10:10 PM)
donno..but in the picture in the link i posted before..seems like a bit far from the main road as along the main road hv lot of taman...from the pic, seems like kampung which is deeper and far from Jalan Johan Setia main road..

hope our area is safe.. but until now, no complaint regarding flood at bandar putera 2..
*
so far there is no complaint regarding flood at bandar putera 2.. not like bandar puteri here, the flood turn from bad to worse when there is a heavy rain since it's near to taman sentosa.. just be ware in case its happen in your area smile.gif
ericlaiys
post Nov 3 2012, 09:52 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(nadhir.nadz @ Nov 3 2012, 06:45 PM)
so far there is no complaint regarding flood at bandar putera 2.. not like bandar puteri here, the flood turn from bad to worse when there is a heavy rain since it's near to taman sentosa.. just be ware in case its happen in your area smile.gif
*
What happen to that side? I often heard bandar puteri always has flash flood even after few years.
nadhir.nadz
post Nov 4 2012, 12:19 AM

Getting Started
**
Junior Member
69 posts

Joined: May 2012
From: Malaysia


QUOTE(ericlaiys @ Nov 3 2012, 09:52 PM)
What happen to that side? I often heard bandar puteri always has flash flood even after few years.
*
this all MPK fault. they are not do a maintanance to the drainage system in bandar puteri and taman sentosa area. so, when there is a heavy rain, the water can flow properly into the drainage system and causing the flash flood to happen.. and usually, they need to park their cars at the higher place, coz u know, anything can happen during the flash flood.. its happen frequently but yet, MPK dont take any action at all.. mad.gif
TScrazeeclan
post Nov 10 2012, 12:57 PM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



received a letter from developer a moment ago.house is ready for collection.i know that we need to pay a sum for the VP but is abit ridiculuos to pay RM720 and the invoice does not itemise what am i paying for..malayan pines estate really blood sucker....how about you guys?


Added on November 10, 2012, 12:59 pm
QUOTE(nadhir.nadz @ Nov 3 2012, 06:45 PM)
so far there is no complaint regarding flood at bandar putera 2.. not like bandar puteri here, the flood turn from bad to worse when there is a heavy rain since it's near to taman sentosa.. just be ware in case its happen in your area smile.gif
*
dont worry...so far so good...been there everyweek when is heavy rain and there is no sign of flood...the only place flooded is the kampung beside the traffic light....

This post has been edited by crazeeclan: Nov 10 2012, 12:59 PM
ericlaiys
post Nov 11 2012, 08:19 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(crazeeclan @ Nov 10 2012, 12:57 PM)
received a letter from developer a moment ago.house is ready for collection.i know that we need to pay a sum for the VP but is abit ridiculuos to pay RM720 and the invoice does not itemise what am i paying for..malayan pines estate really blood sucker....how about you guys?


Added on November 10, 2012, 12:59 pm
dont worry...so far so good...been there everyweek when is heavy rain and there is no sign of flood...the only place flooded is the kampung beside the traffic light....
*
Why don't you visit their office and ask about the RM720. Just read the agreement under maintenance of services has a quote
"Purchaser shall pay 6 month advance in respect of such contribution on the date he takes vacant possession of the said building" (section 18 (2)). I think the amount is very subjective depend on house price. Which phase are you in ?
NelsonBoy
post Nov 11 2012, 11:11 PM

l Audio Paradise l
******
Senior Member
1,120 posts

Joined: May 2006
From: Klang, Serdang, Seri Kembangan,Cheras



any1 want to sell house ??

buyer here.
TScrazeeclan
post Nov 12 2012, 09:50 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(ericlaiys @ Nov 11 2012, 08:19 PM)
Why don't you visit their office and ask about the RM720. Just read the agreement under maintenance of services has a quote
"Purchaser shall pay 6 month advance in respect of such contribution on the date he takes vacant possession of the said building" (section 18 (2)). I think the amount is very subjective depend on house price. Which phase are you in ?
*
Currently out station...will call them later...I'm not sure I'm which phase but I know that my house is the second row behind the field under Cassia 1..

ericlaiys
post Nov 13 2012, 09:54 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(crazeeclan @ Nov 12 2012, 09:50 AM)
Currently out station...will call them later...I'm not sure I'm which phase but I know that my house is the second row behind the field under Cassia 1..
*
Your should be Cassia 1. Time to get renovation. Check out here:- https://www.facebook.com/media/set/?set=a.1...35703011&type=1
Most people in this area get Top Fellowship and saw the office opposite Cassia 1 (shop lot). Not sure good or not.
senapang
post Nov 20 2012, 12:29 AM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
So cassia member..already get ur key?
Kindly share ur defect during inspection? Any major?
TScrazeeclan
post Nov 20 2012, 10:25 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(senapang @ Nov 20 2012, 12:29 AM)
So cassia member..already get ur key?
Kindly share ur defect during inspection? Any major?
*
i believe only cash buyer get their key but by this week those loan buyer will get their key...everyone just share their defect during inspection...i believe there is alot of complain on the wall hair line crack at the car porch there....
dragon_lee
post Nov 21 2012, 09:43 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(crazeeclan @ Nov 20 2012, 10:25 AM)
i believe only cash buyer get their key but by this week those loan buyer will get their key...everyone just share their defect during inspection...i believe there is alot of complain on the wall hair line crack at the car porch there....
*
Boss,

So far only owner with A.IA and PB Bank loan can get their key.

The rest still waiting, if not this Friday should be next week nod.gif

I saw the crack as well, wondering why they didn't do the proper touch up before handover.. hmm.gif
TScrazeeclan
post Nov 22 2012, 08:20 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



HSBC already settle the loan reimbursement. Im getting my key this Saturday at 3pm....maybe they wanna let you see the defect without hiding it...hahaha....
ericlaiys
post Nov 22 2012, 09:37 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(dragon_lee @ Nov 21 2012, 09:43 PM)
Boss,

So far only owner with  A.IA and PB Bank loan can get their key.

The rest still waiting, if not this Friday should be next week nod.gif

I saw the crack as well, wondering why they didn't do the proper touch up before handover..  hmm.gif
*
May be they want to say by "design"...is the crack happen on all house and how come can easily crack. They cut down material and give cheap material?
dragon_lee
post Nov 22 2012, 04:06 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(crazeeclan @ Nov 22 2012, 08:20 AM)
HSBC already settle the loan reimbursement. Im getting my key this Saturday at 3pm....maybe they wanna let you see the defect without hiding it...hahaha....
*
Boss,

Pls update us once you inspected the house smile.gif

Thanks
TScrazeeclan
post Nov 22 2012, 08:43 PM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(ericlaiys @ Nov 22 2012, 09:37 AM)
May be they want to say by "design"...is the crack happen on all house and how come can easily crack. They cut down material and give cheap material?
*
what i can say is majority of the house got the crack....especially the show room....


Added on November 22, 2012, 8:44 pm
QUOTE(dragon_lee @ Nov 22 2012, 04:06 PM)
Boss,

Pls update us once you inspected the house smile.gif

Thanks
*
sure sure...i will..

This post has been edited by crazeeclan: Nov 22 2012, 08:44 PM
dragon_lee
post Nov 22 2012, 09:41 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



How nice if the shop lot in front of Cassia is ready with CF smile.gif


TScrazeeclan
post Nov 23 2012, 08:39 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(dragon_lee @ Nov 22 2012, 09:41 PM)
How nice if the shop lot in front of Cassia is ready with CF smile.gif
*
yeah...i think need another 1 year right? then should have mamak...car wash centre...minimart...anyway how about you? when are you getting your VP?
dragon_lee
post Nov 23 2012, 09:41 AM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(crazeeclan @ Nov 23 2012, 08:39 AM)
yeah...i think need another 1 year right? then should have mamak...car wash centre...minimart...anyway how about you? when are you getting your VP?
*
Boss,

Luckily you can always go across the road to the other site of the shop smile.gif

There's a new mamak restaurant open *got free dinner from 7-9pm only that day* , 99 mini market, car wash and etc.

VP maybe next week, waiting for the bank to release...

ericlaiys
post Nov 23 2012, 01:04 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(dragon_lee @ Nov 23 2012, 09:41 AM)
Boss,

Luckily you can always go across the road to the other site of the shop smile.gif

There's a new mamak restaurant open *got free dinner from 7-9pm only that day* , 99 mini market, car wash and etc.

VP maybe next week, waiting for the bank to release...
*
Please share as well the $$ that need to pay to developer after the house is complete & get the key (besides than bank loan)
dragon_lee
post Nov 23 2012, 03:36 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(ericlaiys @ Nov 23 2012, 01:04 PM)
Please share as well the $$ that need to pay to developer after the house is complete & get the key (besides than bank loan)
*
RM700++ * can't remember exactly the figure* smile.gif
TScrazeeclan
post Nov 23 2012, 04:08 PM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(dragon_lee @ Nov 23 2012, 09:41 AM)
Boss,

Luckily you can always go across the road to the other site of the shop smile.gif

There's a new mamak restaurant open *got free dinner from 7-9pm only that day* , 99 mini market, car wash and etc.

VP maybe next week, waiting for the bank to release...
*
oh..got new mamak ady ar....i only notice 99speedmart and car wash....cool...one day we should meet up for a drink will all Cassia owner...


Added on November 23, 2012, 4:08 pm
QUOTE(ericlaiys @ Nov 23 2012, 01:04 PM)
Please share as well the $$ that need to pay to developer after the house is complete & get the key (besides than bank loan)
*
mine is RM720...

This post has been edited by crazeeclan: Nov 23 2012, 04:08 PM
dragon_lee
post Nov 23 2012, 05:56 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(crazeeclan @ Nov 23 2012, 04:08 PM)
oh..got new mamak ady ar....i only notice 99speedmart and car wash....cool...one day we should meet up for a drink will all Cassia owner...


Added on November 23, 2012, 4:08 pm
mine is RM720...
*
Haha!

No problem

Only thing I'm worried is they should widen the road there...


Added on November 25, 2012, 12:29 am
QUOTE(crazeeclan @ Nov 22 2012, 08:43 PM)
what i can say is majority of the house got the crack....especially the show room....


Added on November 22, 2012, 8:44 pm
sure sure...i will..
*
Boss,

How is the inspection today?

Everything good? hmm.gif

This post has been edited by dragon_lee: Nov 25 2012, 12:29 AM
TScrazeeclan
post Nov 25 2012, 09:53 PM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(dragon_lee @ Nov 23 2012, 05:56 PM)
Boss,

How is the inspection today?

Everything good? hmm.gif
*
Today is my inspection day....inspection from 11am in the morning till 3pm....below is the list of defect...

1.main gate not align properly...gate hard to close...

2.main wooden door difficult to close and lock....and the lockset got rusty...

3.paint like tear drop at staircase wall...few patch....

4.staircase grill rusty....metal expose...

5.certain wall got paint chip off...

6. top part of the ELCB box never paint ...can see cement...

7. floor level at the back door slanting towards inside...when raining, the water flow into the house instead of going out...it make my kitchen area wet...

8. back door frame dented

9.all the floor hole cover(the white pcs thing) broken...

10. ground floor bathroom no water at all...i try open whole house locking tap but still no water out....same goes to the washing machine tap...

11.ground floor bathroom floor hole inside got a big pipe that block the water from draining out smoothly...

12.master bedroom bathroom....shower point water pressure very low...i think my peeing power even better....others ok...

13.window on both upstair bathroom hard to open and cant close...

14. water leakage on both upstair bathroom after i flood the bathroom for 30mins only..can see the water leak out to the staircase and ground floor room toilet....

15.shower area and dry area in the master bedroom bathroom are the same level instead of shower area should be lower...the white colour tiles deviding this both area are still there and is poorly fix and misalign...

Master bedroom door tilt abit .so when there is a movement on the door, it actually rubbing the tiles below...

17.family hall upstair - wall not even..can see wave and the painting is bad..can see alot of tear drop...

18.upstair room 2 lighting point missing and the door frame got paint chip off around 50 cent coin size...

19. can see got few roof tile crack...


Anyway below are the defect that i can find in this few hour...will do more check by next weekend on the flooring tiles....horefully nothing more defect... rclxub.gif

This post has been edited by crazeeclan: Nov 25 2012, 09:55 PM
dragon_lee
post Nov 25 2012, 11:53 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(crazeeclan @ Nov 25 2012, 09:53 PM)
Today is my inspection day....inspection from 11am in the morning till 3pm....below is the list of defect...

1.main gate not align properly...gate hard to close...

2.main wooden door difficult to close and lock....and the lockset got rusty...

3.paint like tear drop at staircase wall...few patch....

4.staircase grill rusty....metal expose...

5.certain wall got paint chip off...

6. top part of the ELCB box never paint ...can see cement...

7. floor level at the back door slanting towards inside...when raining, the water flow into the house instead of going out...it make my kitchen area wet...

8. back door frame dented

9.all the floor hole cover(the white pcs thing) broken...

10. ground floor bathroom no water at all...i try open whole house locking tap but still no water out....same goes to the washing machine tap...

11.ground floor bathroom floor hole inside got a big pipe that block the water from draining out smoothly...

12.master bedroom bathroom....shower point water pressure very low...i think my peeing power even better....others ok...

13.window on both upstair bathroom hard to open and cant close...

14. water leakage on both upstair bathroom after i flood the bathroom for 30mins only..can see the water leak out to the staircase and ground floor room toilet....

15.shower area and dry area in the master bedroom bathroom are the same level instead of shower area should be lower...the white colour tiles deviding this both area are still there and is poorly fix and misalign...

Master bedroom door tilt abit .so when there is a movement on the door, it actually rubbing the tiles below...

17.family hall upstair - wall not even..can see wave and the painting is bad..can see alot of tear drop...

18.upstair room 2 lighting point missing and the door frame got paint chip off around 50 cent coin size...

19. can see got few roof tile crack...
Anyway below are the defect that i can find in this few hour...will do more check by next weekend on the flooring tiles....horefully nothing more defect...  rclxub.gif
*
Boss,

Before I read this , I guess I need a Kopi Kaw Kaw, haha notworthy.gif

Guess the rest of the owner facing the same issue?

Wish me luck next week nod.gif

TScrazeeclan
post Nov 26 2012, 08:10 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(dragon_lee @ Nov 25 2012, 11:53 PM)
Boss,

Before I read this , I guess I need a Kopi Kaw Kaw, haha notworthy.gif

Guess the rest of the owner facing the same issue?

Wish me luck next week nod.gif
*
Yeah...u really need a kopi kaw kaw to read my defect list...Wish you good luck man...when are you getting your key ? this coming weekend?
ericlaiys
post Nov 26 2012, 01:53 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(dragon_lee @ Nov 25 2012, 11:53 PM)
Boss,

Before I read this , I guess I need a Kopi Kaw Kaw, haha notworthy.gif

Guess the rest of the owner facing the same issue?

Wish me luck next week nod.gif
*
Wah lau. so many defect!
TScrazeeclan
post Nov 26 2012, 02:06 PM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(ericlaiys @ Nov 26 2012, 01:53 PM)
Wah lau. so many defect!
*
im fine with minor defect but i cant tolerate with the bathroom water proofing....
dragon_lee
post Nov 26 2012, 10:57 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(crazeeclan @ Nov 26 2012, 08:10 AM)
Yeah...u really need a kopi kaw kaw to read my defect list...Wish you good luck man...when are you getting your key ? this coming weekend?
*
Boss,

Not sure as the bank haven't release the final payment.

Will keep you posted.

Guess I will bring my white coffee during inspection.. flex.gif
TScrazeeclan
post Nov 27 2012, 08:19 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(dragon_lee @ Nov 26 2012, 10:57 PM)
Boss,

Not sure as the bank haven't release the final payment.

Will keep you posted.

Guess I will bring my white coffee during inspection.. flex.gif
*
hope u can get your VP by this weekend...but i heard from the person in charge of this VP , this coming weekend are fully book..yeah..u really need some white coffee during inspection..i will be at my house during this weekend to do more inspection on the tiles..need to actually check each and every tiles to see whether it is hollow at the bottom..give me a call..maybe can meet up and help you to check for defect....anyway which lane your house is?
youngman28
post Nov 27 2012, 10:05 AM

Getting Started
**
Junior Member
175 posts

Joined: May 2011
QUOTE(crazeeclan @ Nov 25 2012, 10:53 PM)
Today is my inspection day....inspection from 11am in the morning till 3pm....below is the list of defect...

1.main gate not align properly...gate hard to close...

2.main wooden door difficult to close and lock....and the lockset got rusty...

3.paint like tear drop at staircase wall...few patch....

4.staircase grill rusty....metal expose...

5.certain wall got paint chip off...

6. top part of the ELCB box never paint ...can see cement...

7. floor level at the back door slanting towards inside...when raining, the water flow into the house instead of going out...it make my kitchen area wet...

8. back door frame dented

9.all the floor hole cover(the white pcs thing) broken...

10. ground floor bathroom no water at all...i try open whole house locking tap but still no water out....same goes to the washing machine tap...

11.ground floor bathroom floor hole inside got a big pipe that block the water from draining out smoothly...

12.master bedroom bathroom....shower point water pressure very low...i think my peeing power even better....others ok...

13.window on both upstair bathroom hard to open and cant close...

14. water leakage on both upstair bathroom after i flood the bathroom for 30mins only..can see the water leak out to the staircase and ground floor room toilet....

15.shower area and dry area in the master bedroom bathroom are the same level instead of shower area should be lower...the white colour tiles deviding this both area are still there and is poorly fix and misalign...

Master bedroom door tilt abit .so when there is a movement on the door, it actually rubbing the tiles below...

17.family hall upstair - wall not even..can see wave and the painting is bad..can see alot of tear drop...

18.upstair room 2 lighting point missing and the door frame got paint chip off around 50 cent coin size...

19. can see got few roof tile crack...
Anyway below are the defect that i can find in this few hour...will do more check by next weekend on the flooring tiles....horefully nothing more defect...  rclxub.gif
*
The soil in B Putera is rather soft relatively. For those intend to renovate the kitchen, kindly do a proper pilling, my sister colleague had a house here, but after a few year, it sink about 2-3 inches. so, please be aware on this.

This post has been edited by youngman28: Nov 27 2012, 12:42 PM
TScrazeeclan
post Nov 27 2012, 11:37 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(youngman28 @ Nov 27 2012, 10:05 AM)
The soil in B Putera is rather soft relatively. For those intend to renovate the kitchen, kindly do a proper pilling, my sister colleague had a  house here, but after a few year, it sing about  2-3 inches. so, please be aware on this.
*
Basically my 5ft left land at the rear already sink about half inch. What i notice mostly of the house there sink half inch or 1 inch. Top fellowship contractor told me that got 1 house at Cassia 2 sink down 6 inch but i never really go see la....
ericlaiys
post Nov 27 2012, 11:43 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(crazeeclan @ Nov 27 2012, 11:37 AM)
Basically my 5ft left land at the rear already sink about half inch. What i notice mostly of the house there sink half inch or 1 inch. Top fellowship contractor told me that got 1 house at Cassia 2 sink down 6 inch but i never really go see la....
*
The sinking is more (Cassia) on near to highway or also to Alpine, Basella, Cadia or Dura side? I notice Cassia side is a big high ground and next to it is Kesas highway
TScrazeeclan
post Nov 27 2012, 11:56 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(ericlaiys @ Nov 27 2012, 11:43 AM)
The sinking is more (Cassia) on near to highway or also to Alpine, Basella, Cadia or Dura side? I notice Cassia side is a big high ground and next to it is Kesas highway
*
Cassia 2 is the one facing highway. Other phase im not so sure...
ericlaiys
post Nov 28 2012, 05:04 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Here is the house full checklist :- http://www.totalhomeinspection.com/TotalHo...onChecklist.pdf
Hope this help
VENETIAN
post Nov 28 2012, 07:02 PM

Getting Started
**
Validating
80 posts

Joined: Nov 2012
QUOTE(ericlaiys @ Nov 28 2012, 05:04 PM)
Here is the house full checklist :- http://www.totalhomeinspection.com/TotalHo...onChecklist.pdf
Hope this help
*
thanks...v helpful info rclxms.gif
TScrazeeclan
post Nov 29 2012, 09:44 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(ericlaiys @ Nov 28 2012, 05:04 PM)
Here is the house full checklist :- http://www.totalhomeinspection.com/TotalHo...onChecklist.pdf
Hope this help
*
thanks bro...indeed very helpful...will based on your checklist and recheck again this weekend...
stevenkkt
post Nov 29 2012, 10:58 AM

On my way
****
Senior Member
600 posts

Joined: Dec 2008


With all these updates from you guys about the sinking, I'm kind of glad that I didn't houses in this area. This is NOT to rub salt on open wound but I thank you for all these sharing.
mingyew
post Nov 29 2012, 11:04 AM

Look at all my stars!!
*******
Senior Member
4,177 posts

Joined: Jan 2003
QUOTE(stevenkkt @ Nov 29 2012, 10:58 AM)
With all these updates from you guys about the sinking, I'm kind of glad that I didn't houses in this area. This is NOT to rub salt on open wound but I thank you for all these sharing.
*
The soft soil problem not only happen to this area, KK,KU,BR happen the same thing. Extension with 2 floor must be piling.

Even 1 floor also need to do a proper concrete retention
ericlaiys
post Nov 29 2012, 11:24 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mingyew @ Nov 29 2012, 11:04 AM)
The soft soil problem not only happen to this area, KK,KU,BR happen the same thing. Extension with 2 floor must be piling.

Even 1 floor also need to do a proper concrete retention
*
Yalor. Even famous developer also having same problem. I heard rumor from my friend that Setia Alam (Phase 1 or 2), the house sink.
Here is some info:- http://ling-wei.blogspot.com/2008/06/setia...or-quality.html and http://ling-wei.blogspot.com/2009/06/soil-...a-alam-car.html
Some forum reported as well

TScrazeeclan
post Nov 29 2012, 11:51 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(stevenkkt @ Nov 29 2012, 10:58 AM)
With all these updates from you guys about the sinking, I'm kind of glad that I didn't houses in this area. This is NOT to rub salt on open wound but I thank you for all these sharing.
*
The soft soil happen everywhere even in Kota Kemuning and Bukit Rimau. Currently im staying in Bukit Rimau...1 row of townhouse being demolish as the house slanted due to soft soil...


Added on December 4, 2012, 9:42 ammy previous complain solution by developer...


1.main gate not align properly...gate hard to close...
haven't settle yet but they remove my marking over there

2.main wooden door difficult to close and lock....and the lockset got rusty...
haven't settle

3.paint like tear drop at staircase wall...few patch....
haven't settle but they remove my marking over there

4.staircase grill rusty....metal expose...
haven't settle and my marking is still intact.

5.certain wall got paint chip off...
certain area the marking still intact and some remove and haven't settle yet

6. top part of the ELCB box never paint ...can see cement...
haven't settle yet

7. floor level at the back door slanting towards inside...when raining, the water flow into the house instead of going out...it make my kitchen area wet...
developer checked my house and say this is the house design.every house are the same.so cant do anything on it.

8. back door frame dented
my marking removed..never settle.

9.all the floor hole cover(the white pcs thing) broken...
marking remove but they never change

10. ground floor bathroom no water at all...i try open whole house locking tap but still no water out....same goes to the washing machine tap...
settle. got blockage in the conceal piping and also air trap

11.ground floor bathroom floor hole inside got a big pipe that block the water from draining out smoothly...
marking remove. nothing done...


12.master bedroom bathroom....shower point water pressure very low...i think my peeing power even better....others ok...
developer claim is normal. got air trap..trap my foot la...i turn on for like 20mins and still no different.

13.window on both upstair bathroom hard to open and cant close...
haven't settle

14. water leakage on both upstair bathroom after i flood the bathroom for 30mins only..can see the water leak out to the staircase and ground floor room toilet....
developer trying to be funny by using the white paste(i dunno what do u guys call it) and fill the gap between the tiles on the floor and 6 inch up to the wall tiles and they say this can prevent the water from sipping to down stair and already settle the water proofing issue.


15.shower area and dry area in the master bedroom bathroom are the same level instead of shower area should be lower...the white colour tiles deviding this both area are still there and is poorly fix and misalign...
my marking remove. haven't settle.


Master bedroom door tilt abit .so when there is a movement on the door, it actually rubbing the tiles below...
my marking remove...haven't settle

17.family hall upstair - wall not even..can see wave and the painting is bad..can see alot of tear drop...
developer claim is normal ..the reason is new wall..

18.upstair room 2 lighting point missing and the door frame got paint chip off around 50 cent coin size...
marking remove.haven't settle

New defect i found out..

1. tiles with 13amp point got different colour tone with other tile .
2. got few tiles in the main hall and master bedroom are hollow at the bottom...


This post has been edited by crazeeclan: Dec 4 2012, 09:42 AM
ericlaiys
post Dec 8 2012, 09:02 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(crazeeclan @ Nov 29 2012, 11:51 AM)
The soft soil happen everywhere even in Kota Kemuning and Bukit Rimau. Currently im staying in Bukit Rimau...1 row of townhouse being demolish as the house slanted due to soft soil...


Added on December 4, 2012, 9:42 ammy previous complain solution by developer...
1.main gate not align properly...gate hard to close...
  haven't settle yet but they remove my marking over there

2.main wooden door difficult to close and lock....and the lockset got rusty...
  haven't settle

3.paint like tear drop at staircase wall...few patch....
  haven't settle but they remove my marking over there

4.staircase grill rusty....metal expose...
  haven't settle and my marking is still intact.

5.certain wall got paint chip off...
  certain area the marking still intact and some remove and haven't settle yet

6. top part of the ELCB box never paint ...can see cement...
    haven't settle yet

7. floor level at the back door slanting towards inside...when raining, the water flow into the house  instead of going out...it make my kitchen area wet...
    developer checked my house and say this is the house design.every house are the same.so cant do anything on it. 

8. back door frame dented
    my marking removed..never settle.

9.all the floor hole cover(the white pcs thing) broken...
  marking remove but they never change

10. ground floor bathroom no water at all...i try open whole house locking tap but still no water out....same goes to the washing machine tap...
  settle. got blockage in the conceal piping and also air trap

11.ground floor bathroom floor hole inside got a big pipe that block the water from draining out smoothly...
    marking remove. nothing done...


12.master bedroom bathroom....shower point water pressure very low...i think my peeing power even better....others ok...
    developer claim is normal. got air trap..trap my foot la...i turn on for like 20mins and still no different.

13.window on both upstair bathroom hard to open and cant close...
    haven't settle

14. water leakage on both upstair bathroom after i flood the bathroom for 30mins only..can see the water leak out to the staircase and ground floor room toilet....
      developer trying to be funny by using the white paste(i dunno what do u guys call it) and fill the gap between the tiles on the floor and 6 inch up to the wall tiles and they say this can prevent the water from sipping to down stair and already settle the water proofing issue.


15.shower area and dry area in the master bedroom bathroom are the same level instead of shower area should be lower...the white colour tiles deviding this both area are still there and is poorly fix and misalign...
  my marking remove. haven't settle.


Master bedroom door tilt abit .so when there is a movement on the door, it actually rubbing the tiles below...
    my marking remove...haven't settle

17.family hall upstair - wall not even..can see wave and the painting is bad..can see alot of tear drop...
    developer claim is normal ..the reason is new wall..

18.upstair room 2 lighting point missing and the door frame got paint chip off around 50 cent coin size...
    marking remove.haven't settle

New defect i found out..

1. tiles with 13amp point got different colour tone with other tile .
2. got few tiles in the main hall and master bedroom are hollow at the bottom...
*
Wow. A lot not settle. So how? Need to fork out own money to repair
TScrazeeclan
post Dec 10 2012, 08:47 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(ericlaiys @ Dec 8 2012, 09:02 PM)
Wow. A lot not settle. So how? Need to fork out own money to repair
*
Nop. Why i need to fork out my own money la. Defect warranty cover up to 24 months ma.Met Mr. Lee , site supervisor from IOI developer last Saturday at my house. He is a very nice and friendly person. Rectify my problem 1 by 1 and promise to settle it in 1 week time. He explain to me step by step how are they gonna settle my problem and ensure me that everything gonna be fine. rclxms.gif

This post has been edited by crazeeclan: Dec 10 2012, 08:48 AM
ericlaiys
post Dec 10 2012, 08:45 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(crazeeclan @ Dec 10 2012, 08:47 AM)
Nop. Why i need to fork out my own money la. Defect warranty cover up to 24 months ma.Met Mr. Lee , site supervisor from IOI developer last Saturday at my house. He is a very nice and friendly person. Rectify my problem 1 by 1 and promise to settle it in 1 week time. He explain to me step by step how are they gonna settle my problem and ensure me that everything gonna be fine. rclxms.gif
*
thumbup.gif That was a good news.
trinittrotoleune
post Dec 14 2012, 02:24 PM

New Member
*
Junior Member
19 posts

Joined: Jan 2005


i'm gonna get the key tomorrow.. and have an inspection as well.... hope everything gonna be fine
ericlaiys
post Dec 16 2012, 07:48 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(trinittrotoleune @ Dec 14 2012, 02:24 PM)
i'm gonna get the key tomorrow.. and have an inspection as well.... hope everything gonna be fine
*
So how?
TScrazeeclan
post Dec 17 2012, 08:41 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(trinittrotoleune @ Dec 14 2012, 02:24 PM)
i'm gonna get the key tomorrow.. and have an inspection as well.... hope everything gonna be fine
*
congrat and good luck....latest update on my unit. ...as my previous post, i have met up with Mr. Lee, the site manager or supervisor im not so sure..he promise me that he will settle everything in a week time but sadly, nop. My toilet water proofing still the same untouch. mad.gif just wanna ask here, our S&P got a clause stated that the developer need to settle the first complain in 30 days or else we have the right to settle by our own and claim from them. Am i right?

ericlaiys
post Dec 17 2012, 12:40 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(crazeeclan @ Dec 17 2012, 08:41 AM)
congrat and good luck....latest update on my unit. ...as my previous post, i have met up with Mr. Lee, the site manager or supervisor im not so sure..he promise me that he will settle everything in a week time but sadly, nop. My toilet water proofing still the same untouch.  mad.gif  just wanna ask here, our S&P got a clause stated that the developer need to settle the first complain in 30 days or else we have the right to settle by our own and claim from them. Am i right?
*
eh. i dont think so. Warranty is 24 month. You probably need to complain to sales office again ,again and again...and again...
Better leave them fix the issue first before renovation if not they will denied it.
TScrazeeclan
post Dec 17 2012, 03:03 PM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



i got the info from their official website actually

http://www.ioiproperties.com.my/buyer_guide.cfm#after

yeah i complain again today. I told them if by 30 days , my defective thing still haven't settle, i will lock my house and no any contractor will allowed into my house will send them a bill from my contractor for the water proofing and some other minor issue.

This post has been edited by crazeeclan: Dec 17 2012, 03:05 PM
ericlaiys
post Dec 17 2012, 04:44 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(crazeeclan @ Dec 17 2012, 03:03 PM)
i got the info from their official website actually

http://www.ioiproperties.com.my/buyer_guide.cfm#after

yeah i complain again today. I told them if by 30 days , my defective thing still haven't settle, i will lock my house and no any contractor will allowed into my house will send them a bill from my contractor for the water proofing and some other minor issue.
*
Cool...but not sure developer will do whatever been written in the website. Worse case, find lawyer to sue them back
TScrazeeclan
post Dec 26 2012, 02:03 PM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



Developer are really getting on my nerve. They don't want to rectify my problem. So since this is the way the developer want it , then i have no choice to send them a reminder. Below are the reminder.


Attached File  developer.pdf ( 9.33k ) Number of downloads: 178

Attached File  stakeholder_1.pdf ( 7.79k ) Number of downloads: 114

youngman28
post Dec 26 2012, 06:24 PM

Getting Started
**
Junior Member
175 posts

Joined: May 2011
QUOTE(crazeeclan @ Dec 26 2012, 03:03 PM)
Developer are really getting on my nerve. They don't want to rectify my problem. So since this is the way the developer want it , then i have no choice to send them a reminder. Below are the reminder.
Attached File  developer.pdf ( 9.33k ) Number of downloads: 178

Attached File  stakeholder_1.pdf ( 7.79k ) Number of downloads: 114

*
Good move to give the developer a warming to rectify the problem.

I dun Known about Bandar Putera maintenance team, but for Bandar Puteri case, they will send one or two Burmese to slowly rectify yours problem. The worst thing is their Maintenance office, the site supervisor will never brother to seriously to rectify the problem, and just let the foreginer to carryout the job to minimimse their cost.
ericlaiys
post Dec 27 2012, 12:57 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(crazeeclan @ Dec 26 2012, 02:03 PM)
Developer are really getting on my nerve. They don't want to rectify my problem. So since this is the way the developer want it , then i have no choice to send them a reminder. Below are the reminder.
Attached File  developer.pdf ( 9.33k ) Number of downloads: 178

Attached File  stakeholder_1.pdf ( 7.79k ) Number of downloads: 114

*
Did you cc to Cyberjaya Office (HQ)?
TScrazeeclan
post Dec 27 2012, 08:25 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(ericlaiys @ Dec 27 2012, 12:57 AM)
Did you cc to Cyberjaya Office (HQ)?
*
yes...i did...i send to the person in charge in site office, then cc to HQ , stakeholder, kementerian perumahan malaysia and selangor bar council biggrin.gif
senapang
post Jan 4 2013, 01:46 AM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
Just went to BP2 last monday..just to see my house progress..

Lepak at the mamak there..found there will be 1 surau near the empty land back of the shop lot there..it is good! Thingking of lot of unit there without any masjid or surau?? Then thanks to the persatuan penduduk bandar putera 2 for their effort..

But along the jalan johan setia has no street lighting at all? I mean near our taman there..coz visit on night around 8 and found that the road (jalan johan setia) so dark..
Is the front of the shop lot got street lighting? Coz at that time, the front of the shop lot also dark..is it always like that?

Btw, end up that day, i change my tyres and sportrims at the workshop next to the mamak..cina muslim workshop..very friendly guy..and the servis also good..plus point to the area smile.gif
ericlaiys
post Jan 5 2013, 11:13 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(senapang @ Jan 4 2013, 01:46 AM)
Just went to BP2 last monday..just to see my house progress..

Lepak at the mamak there..found there will be 1 surau near the empty land back of the shop lot there..it is good! Thingking of lot of unit there without any masjid or surau?? Then thanks to the persatuan penduduk bandar putera 2 for their effort..

But along the jalan johan setia has no street lighting at all? I mean near our taman there..coz visit on night around 8 and found that the road (jalan johan setia) so dark..
Is the front of the shop lot got street lighting? Coz at that time, the front of the shop lot also dark..is it always like that?

Btw, end up that day, i change my tyres and sportrims at the workshop next to the mamak..cina muslim workshop..very friendly guy..and the servis also good..plus point to the area smile.gif
*
Yup. Notice that the whole entire road (jln Johan) is without street light. The only bright light is BP2 area.
That empty land suppose to build Balai Polis and school. Next to shop lot suppose to have a petrol station but till now still empty after a year.


Added on January 5, 2013, 11:13 pm
QUOTE(crazeeclan @ Dec 27 2012, 08:25 AM)
yes...i did...i send to the person in charge in site office, then cc to HQ , stakeholder, kementerian perumahan malaysia and selangor bar council biggrin.gif
*
Any update after a week?

This post has been edited by ericlaiys: Jan 5 2013, 11:13 PM
TScrazeeclan
post Jan 7 2013, 08:40 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(senapang @ Jan 4 2013, 01:46 AM)
Just went to BP2 last monday..just to see my house progress..

Lepak at the mamak there..found there will be 1 surau near the empty land back of the shop lot there..it is good! Thingking of lot of unit there without any masjid or surau?? Then thanks to the persatuan penduduk bandar putera 2 for their effort..

But along the jalan johan setia has no street lighting at all? I mean near our taman there..coz visit on night around 8 and found that the road (jalan johan setia) so dark..
Is the front of the shop lot got street lighting? Coz at that time, the front of the shop lot also dark..is it always like that?

Btw, end up that day, i change my tyres and sportrims at the workshop next to the mamak..cina muslim workshop..very friendly guy..and the servis also good..plus point to the area smile.gif
*
currently they are fixing those street light from the traffic light towards bp2....but im not sure whether it will reach till bp2 entrance...temporally it only half way till the hardware shop area.....
TScrazeeclan
post Jan 7 2013, 08:42 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(ericlaiys @ Jan 5 2013, 11:13 PM)
Yup.  Notice that the whole entire road (jln Johan) is without street light. The only bright light is BP2 area.
That empty land suppose to build Balai Polis and school. Next to shop lot suppose to have a petrol station but till now still empty after a year.


Added on January 5, 2013, 11:13 pm
Any update after a week?
*
yeah...they did settle all my problem already.. HQ call me up the day after i submitted the complain letter.anyway found a new defect , the window at upstair family hall , the one beside tangki air cant close properly. After close it, still got 1 inch gap. Anyway already report last Thursday and by end of Thursday itself , it settle already..

ericlaiys
post Jan 25 2013, 08:47 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


75% completed on Dura Phase- bandar putera 2. Visited the site yesterday and saw backyard has put cement and drain as well.
-Rubbish dump has full tiled . Did not expect it till i open it.
-Earth grounding electricity is there as well

Next step, road... rclxm9.gif

This post has been edited by ericlaiys: Jan 25 2013, 08:51 PM


Attached thumbnail(s)
Attached Image Attached Image Attached Image
senapang
post Jan 27 2013, 03:11 AM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
Dura and cadia i think same progress now rite..architect cert until sewerage n electric work completed..

Just visit the site, behind dura got new phase rite? What is the phase name? Behind that phase got OSD pond and sewerage house..and after that sewerage house got another phase..already launch?
ericlaiys
post Jan 28 2013, 10:02 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(senapang @ Jan 27 2013, 03:11 AM)
Dura and cadia i think same progress now rite..architect cert until sewerage n electric work completed..

Just visit the site, behind dura got new phase rite? What is the phase name? Behind that phase got OSD pond and sewerage house..and after that sewerage house got another phase..already launch?
*
Saw the new phase as well. Dunno what it call as no show unit. Website also did not mentioned anything except registration for new phase
But smaller unit with 3 room - 20 X 65. I heard it cost around 240K+. It progress very fast. In my opinion, the more it built is better at least noise and dusty when cadia and dura get the key.

Met one of the dura owner who also visiting the site, they told me that probably everything will complete by June. icon_rolleyes.gif
senapang
post Jan 29 2013, 01:22 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
did any forumer here currently stay in alpinia/basella/cassia? i mean really stay there?

just want to know the traffic along the road from dura to junction at the mamak stall there during morning 7 to 8am and during evening 6-8pm..

just wonder if the dura and cadia completed one day and fully occupied for this 4 phases, is the road along the single storey houses will be cramp or not? haha

just read the facebook page of persatuan penduduk, got 1 car/motocycle got stolen..and now they start close the basella entrance and now all in/out vehicle must via the guard house at alpinia..hope cadia and dura got 1 too after this smile.gif
senapang
post Jan 29 2013, 01:26 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
QUOTE(ericlaiys @ Jan 28 2013, 10:02 AM)
Saw the new phase as well. Dunno what it call as no show unit. Website also did not mentioned anything except registration for new phase
But smaller unit with 3 room - 20 X 65. I heard it cost around 240K+. It progress very fast. In my opinion, the more it built is better at least noise and dusty when cadia and dura get the key.

Met one of the dura owner who also visiting the site, they told me that probably everything will complete by June.  icon_rolleyes.gif
*
how much u bought ur dura that time? i tot already reach 240k for intermediate?
ericlaiys
post Jan 29 2013, 07:34 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(senapang @ Jan 29 2013, 01:22 PM)
did any forumer here currently stay in alpinia/basella/cassia? i mean really stay there?

just want to know the traffic along the road from dura to junction at the mamak stall there during morning 7 to 8am and during evening 6-8pm..

just wonder if the dura and cadia completed one day and fully occupied for this 4 phases, is the road along the single storey houses will be cramp or not? haha

just read the facebook page of persatuan penduduk, got 1 car/motocycle got stolen..and now they start close the basella entrance and now all in/out vehicle must via the guard house at alpinia..hope cadia and dura got 1 too after this smile.gif
*
I think they should put fences as well rather than just close the gate. The guard only available during day time. After 6pm, no longer there (saw it when pass by several times during my spot check on house status).

The guard dont seem to stop the car/bike who pass by - the entrance point
ericlaiys
post Jan 29 2013, 07:35 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(senapang @ Jan 29 2013, 01:26 PM)
how much u bought ur dura that time? i tot already reach 240k for intermediate?
*
By the time i bought it already RM263K. Just only 3 days passed (before is 253K). So you get Cadia/Dura ? How much you get?

This post has been edited by ericlaiys: Jan 29 2013, 09:47 PM
mingyew
post Jan 29 2013, 09:07 PM

Look at all my stars!!
*******
Senior Member
4,177 posts

Joined: Jan 2003
looking forward for renovation, anyone have nearby contractor?

found one with reasonable price but want to compare more.
ericlaiys
post Jan 29 2013, 09:48 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mingyew @ Jan 29 2013, 09:07 PM)
looking forward for renovation, anyone have nearby contractor?

found one with reasonable price but want to compare more.
*
How about Top Fellowship? Anyone use them? :- http://www.topfellowship.com.my/
What renovation you plan to do? Do you mind sharing the renovation company as well as i might need it soon.

This post has been edited by ericlaiys: Jan 29 2013, 09:53 PM
senapang
post Jan 29 2013, 11:53 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
QUOTE(ericlaiys @ Jan 29 2013, 07:35 PM)
By the time i bought it already RM263K. Just only 3 days passed (before is 253K). So you get Cadia/Dura ? How much you get?
*
Mine is cadia..end lot and facing padang..that time i bought was rm278k..for intermediate pulak i think around 235k je that time..then 2 months later dura launch, the price increase another 10k kan? Every 2 or 3 month, they increase 10k..

But ioi is very kedekut..apa salah nya if they just tile over the whole porch area..pastu install la pavement block at the gate area..haiiaaa..now need to dig money somemore to do those thing.. Cassia got fully tiled x on ur porch area?

ericlaiys
post Feb 1 2013, 08:33 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(senapang @ Jan 29 2013, 11:53 PM)
Mine is cadia..end lot and facing padang..that time i bought was rm278k..for intermediate pulak i think around 235k je that time..then 2 months later dura launch, the price increase another 10k kan? Every 2 or 3 month, they increase 10k..on

But ioi is very kedekut..apa salah nya if they just tile over the whole porch area..pastu install la pavement block at the gate area..haiiaaa..now need to dig money somemore to do those thing.. Cassia got fully tiled x on ur porch area?
*
Wow..Cadia will finish first. Expected due by August 2013. Got no issue about tile just hope the house complete on time & without abandon project. So found your renovation company to do your tile? tongue.gif
ericlaiys
post Feb 1 2013, 06:30 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Phase 5 @ bandar putera 2 is called EMBER (20 X 65). Hmm...what is the selling price?
senapang
post Feb 1 2013, 09:52 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
Just call the ejen today..the price is 235k..for corner rm326k..launch tomorrow..got their sms this morning
ericlaiys
post Feb 2 2013, 08:34 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(ceveori @ Feb 2 2013, 01:30 AM)
can share the contact? Thanks!
*
You can call direct to sales office:- http://www.ioiproperties.com.my/bdrputerak...g_contactus.cfm
senapang
post Feb 2 2013, 10:33 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
Yup..can call direct ofis..my sales person is pheobe..can call ofis and ask for her..

Ember side view feels like alpinia lah pulak after 2,3 times look..huhu
ericlaiys
post Feb 3 2013, 09:25 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Is UNIFI coverage available for Alpina & Basella?
NelsonBoy
post Feb 3 2013, 10:16 PM

l Audio Paradise l
******
Senior Member
1,120 posts

Joined: May 2006
From: Klang, Serdang, Seri Kembangan,Cheras



QUOTE(senapang @ Feb 2 2013, 10:33 PM)
Yup..can call direct ofis..my sales person is pheobe..can call ofis and ask for her..

Ember side view feels like alpinia lah pulak after 2,3 times look..huhu
*
show house ready ah ?
senapang
post Feb 3 2013, 10:47 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
Last time checked with my fren who own a unit at basella ( but not stay there), the unify or streamyx still not in yet..but that is 2 months back..maybe u can refer to persatuan penduduk facebook page to find out..

hope during our vp, all are ready smile.gif

NelsonBoy: i think the house should be ready for internal view..maybe some one can verify it?
ericlaiys
post Feb 4 2013, 01:03 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(661188 @ Feb 4 2013, 12:49 AM)
Oops, think this is the one but how come completed, not undercon?

http://www.iproperty.com.my/propertylistin...k_House_ForSale
*
That link is Phase 2- bassela. the one that we talk is ember. Saw already has few row structure in placed. It is painted as green. But that time i go is not open for viewing and not furnish. Anyone visit the p5 show unit?

This post has been edited by ericlaiys: Feb 4 2013, 01:03 AM
ericlaiys
post Feb 4 2013, 10:02 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Just received a letter from developer asking to pay deposit- Electricity - 280, water - 100 and TNB stamp duty - 10. Look like my unit going to finish soon.

This post has been edited by ericlaiys: Feb 4 2013, 10:16 PM
iman_210
post Feb 4 2013, 11:40 PM

1.0 bar @ 221WHP
*******
Senior Member
2,684 posts

Joined: Mar 2005
From: Central Region


hows the price like for subsale for earlier phase? thinking to purchase 1 for my sister
NelsonBoy
post Feb 5 2013, 06:59 PM

l Audio Paradise l
******
Senior Member
1,120 posts

Joined: May 2006
From: Klang, Serdang, Seri Kembangan,Cheras



QUOTE(iman_210 @ Feb 4 2013, 11:40 PM)
hows the price like for subsale for earlier phase?  thinking to purchase 1 for my sister
*
about rm250-260k


Redcoded
post Feb 9 2013, 11:42 PM

New Member
*
Newbie
4 posts

Joined: Jul 2011
Hi anyone have idea on EMBer project ??
ericlaiys
post Feb 16 2013, 01:53 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(Redcoded @ Feb 9 2013, 11:42 PM)
Hi anyone have idea on EMBer project ??
*
Went to Sales office to pay deposit on electricity and water. Checked out EMBER. Almost sold out . Total 198 units -only left 40+. Went to show unit, 3 room, kitchen consider large a bit. Yard is full tiled as well. Then i saw Phase 6 has under construction as well

This post has been edited by ericlaiys: Feb 16 2013, 01:53 PM
NelsonBoy
post Feb 16 2013, 11:24 PM

l Audio Paradise l
******
Senior Member
1,120 posts

Joined: May 2006
From: Klang, Serdang, Seri Kembangan,Cheras



QUOTE(ericlaiys @ Feb 16 2013, 01:53 PM)
Went to Sales office to pay deposit on electricity and water. Checked out EMBER. Almost sold out . Total 198 units -only left 40+. Went to show unit, 3 room, kitchen consider large a bit. Yard is full tiled as well. Then i saw Phase 6 has under construction as well
*
seriously speaking, those available unit is located near to sewage pond !

everything is good except IWK pond.


yee85
post Feb 22 2013, 02:36 PM

New Member
*
Newbie
3 posts

Joined: Feb 2013
Is that bandar putera 2 have the risk of flooding????
ericlaiys
post Feb 23 2013, 08:03 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(yee85 @ Feb 22 2013, 02:36 PM)
Is that bandar putera 2 have the risk of flooding????
*
Not at this moment. You can check our previous post that we have discussed about it. Flood only at Kampung Johan area
ericlaiys
post Mar 25 2013, 03:01 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Went to check my unit yesterday. They have locked the house and prevent people from going in. Saw the wall plate has mounted and door bell as well. Road has cleared and probably will "tar" it soon.
senapang
post Jun 9 2013, 09:06 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
Just went there checking my unit.. Tarmac for cadia n dura completed already together with road marking..so we expecting another 5% payment for roadworks and sewerage for next bill..

There will be connection road between basella and cadia at the back of the field..showhouse for ember is ready but only bare, without any furniture..and still ioi is so kedekut..cannot give more trees/plant ke around that playground area..haish..

Anyway, 2 or 3 month to VP..heheh
ericlaiys
post Jun 10 2013, 08:21 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


They already charge 5% for the road (Dura). Excited to saw the road plus my road address.
I went to site to check as well. Still doing touch up and painting gate. Drove all the way to end of EMBER and saw got one lake/swamp (not very sure but saw people fishing). Next to it is another phase under construction.

For tree, they planted 1 just for the house. smile.gif

I think Cadia will be late on getting the key (suppose end of May to hand over)

This post has been edited by ericlaiys: Jun 10 2013, 08:33 PM


Attached thumbnail(s)
Attached Image Attached Image
zery
post Jun 12 2013, 01:37 PM

New Member
*
Junior Member
22 posts

Joined: Dec 2010


Hello...just asking..

Why this project cnnot do with gov loan??
ericlaiys
post Jun 12 2013, 06:32 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(zery @ Jun 12 2013, 01:37 PM)
Hello...just asking..

Why this project cnnot do with gov loan??
*
Gov loan? Apply bank loan.
azmirsafuan
post Jun 14 2013, 03:56 PM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
QUOTE(zery @ Jun 12 2013, 01:37 PM)
Hello...just asking..

Why this project cnnot do with gov loan??
*
y kenot plak? i bought this house using govt loan..but Dura la...
ericlaiys
post Jun 20 2013, 03:03 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Another phase is up for sale. It's called FELICIA (20 X 65). Anyone know the selling price?
oxm8
post Jun 20 2013, 03:13 PM

Regular
******
Senior Member
1,458 posts

Joined: Jul 2011
went to check out EMBER...bilik semua comel2..but the hall is long...
zery
post Jun 24 2013, 07:55 AM

New Member
*
Junior Member
22 posts

Joined: Dec 2010


QUOTE(ericlaiys @ Jun 20 2013, 03:03 PM)
Another phase is up for sale. It's called FELICIA (20 X 65). Anyone know the selling price?
*
I bought one last Saturday.. corner lot RM328k (bumi) non bumi RM341k
zery
post Jun 24 2013, 07:57 AM

New Member
*
Junior Member
22 posts

Joined: Dec 2010


QUOTE(azmirsafuan @ Jun 14 2013, 03:56 PM)
y kenot plak? i bought this house using govt loan..but Dura la...
*
dunno la..they said this house got 2 SMP (x tau ape tu) huhu.. so they ask to go for private loan.
senapang
post Jun 27 2013, 08:10 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
QUOTE(ericlaiys @ Jun 10 2013, 08:21 PM)
They already charge 5% for the road (Dura). Excited to saw the road plus my road address.
I went to site to check as well. Still doing touch up and painting gate. Drove all the way to end of EMBER and saw got one lake/swamp (not very sure but saw people fishing). Next to it is another phase under construction.

For tree, they planted 1 just for the house. smile.gif

I think Cadia will be late on getting the key (suppose end of May to hand over)
*
Ermm cadia supposed to handover around august, based on the snp signed as i'm one of the earliest purchaser for cadia..

Dura i think a month after cadia launched kan? Probably cadia n dura will vp together-gether..

By the way, is the pictures are ur unit? Really like dura color compared to cadia..maybe will do new external painting for my unit..

Have anyone saw advertisement by top fellowship contractor? Is it good deal? Package around 13k for plasterceiling at hall, dining, wet kitchen together with cornish and lighting, L shaped kitchen kabinet with full height top cabinet, new internal painting works, full iron grilled..

This post has been edited by senapang: Jun 27 2013, 08:17 PM
ericlaiys
post Jun 29 2013, 12:43 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(senapang @ Jun 27 2013, 08:10 PM)
cadia supposed to handover around august, based on the snp signed as i'm one of the earliest purchaser for cadia..

Dura i think a month after cadia launched kan? Probably cadia n dura will vp together-gether..

By the way, is the pictures are ur unit? Really like dura color compared to cadia..maybe will do new external painting for my unit..

Have anyone saw advertisement by top fellowship contractor? Is it good deal? Package around 13k for plasterceiling at hall, dining, wet kitchen together with cornish and lighting, L shaped kitchen kabinet with full height top cabinet, new internal painting works, full iron grilled..
*
Hopefully but if i'm not mistaken Dura suppose to due on Nov 2013. regarding the picture, that is not my unit. Just happy on my house road with address so i just snap the picture. smile.gif

Just drove pass by cadia, i think they have lock the gate whereby dura still doing some external painting and water meter not yet in.

i do saw the advertisement by top fellowship @ facebook as well but the question is top fellowship a good contractor ? Look like they do renovation for Phase 1 & 2 as well. I will probably do some custom renovation rather than choose the package as advertise. Example:-

a) pattern of the iron grill . Probably different from the one that you like
b) Kitchen cabinet around 7K? hmm...look very expensive.





ericlaiys
post Jun 29 2013, 12:45 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(zery @ Jun 24 2013, 07:55 AM)
I bought one last Saturday.. corner lot RM328k (bumi) non bumi RM341k
*
Any idea on intermediate lot cost & do they have show unit ready?

This post has been edited by ericlaiys: Jun 29 2013, 12:45 AM
zery
post Jul 1 2013, 11:10 AM

New Member
*
Junior Member
22 posts

Joined: Dec 2010


QUOTE(ericlaiys @ Jun 29 2013, 12:45 AM)
Any idea on intermediate lot cost & do they have show unit ready?
*
yes they have.. just go and see.. the design very nice n look more modern huhu
intermediate Rm241k, endlot rm270k++...(if im not mistaken)

azmirsafuan
post Jul 2 2013, 09:16 AM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
QUOTE(ericlaiys @ Jun 29 2013, 12:43 AM)
Hopefully but if i'm not mistaken Dura suppose to due on Nov 2013. regarding the picture, that is not my unit. Just happy on my house road with address so i just snap the picture. smile.gif

Just drove pass by cadia, i think they have lock the gate whereby dura still doing some external painting and water meter not yet in.

i do saw the advertisement by top fellowship @ facebook as well but the question is top fellowship a good contractor ? Look like they do renovation for Phase 1 & 2 as well. I will probably do some custom renovation rather than choose the package as advertise. Example:-

a) pattern of the iron grill . Probably different from the one that you like
b) Kitchen cabinet around 7K? hmm...look very expensive.
*
for kitchen cabinet..what is the dimension? need to find quotation for my dura..
any recommendation for the contractor?
TFR seems to expensive..7.8K..
senapang
post Jul 3 2013, 02:04 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
just called ioi, cadia VP should be in this month or next month. But not sure on the MOT. anybody know when? need to check with snp laywer maybe kan?

For VP, purchaser need to pay for maintenance fee amounting RM450, cukai pintu and taksiran (if i'm not mistaken). so total around RM550++ la u need to prepare.
ericlaiys
post Jul 4 2013, 03:57 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(senapang @ Jul 3 2013, 02:04 PM)
just called ioi, cadia VP should be in this month or next month. But not sure on the MOT. anybody know when? need to check with snp laywer maybe kan?

For VP, purchaser need to pay for maintenance fee amounting RM450, cukai pintu and taksiran (if i'm not mistaken). so total around RM550++ la u need to prepare.
*
Thank for the info. by the way, MOT= Master of Title, need to check with lawyer. That will cost 5K+ based on my finding last time when sign S & P.

This post has been edited by ericlaiys: Jul 4 2013, 05:24 PM
ericlaiys
post Jul 4 2013, 05:26 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(azmirsafuan @ Jul 2 2013, 09:16 AM)
for kitchen cabinet..what is the dimension? need to find quotation for my dura..
any recommendation for the contractor?
TFR seems to expensive..7.8K..
*
Did you manage to get the dimension? Besides, your layout could be different(depend your kitchen on left side /right side) and you may different depend on where you want to put fridge and washing machine

This post has been edited by ericlaiys: Jul 4 2013, 05:27 PM
azmirsafuan
post Jul 6 2013, 02:39 PM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
QUOTE(ericlaiys @ Jul 4 2013, 05:26 PM)
Did you manage to get the dimension? Besides, your layout could be different(depend your kitchen on left side /right side) and you may different depend on where you want to put fridge and washing machine
*
xbrkesempatan lg melawat umah..this week blk kampung..insha allah will measured after this.
i think my kitchen is on the left side..got door at the left if you entered from the main door.
did u managed to get the dimension too bro?
ericlaiys
post Jul 6 2013, 07:45 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(azmirsafuan @ Jul 6 2013, 02:39 PM)
xbrkesempatan lg melawat umah..this week blk kampung..insha allah will measured after this.
i think my kitchen is on the left side..got door at the left if you entered from the main door.
did u managed to get the dimension too bro?
*
my kitchen is on the right side. My dimension is around 2.23m X 2.56m (windows glass side)

This post has been edited by ericlaiys: Jul 6 2013, 07:46 PM
zery
post Jul 7 2013, 12:50 PM

New Member
*
Junior Member
22 posts

Joined: Dec 2010


QUOTE(azmirsafuan @ Jul 2 2013, 09:16 AM)
for kitchen cabinet..what is the dimension? need to find quotation for my dura..
any recommendation for the contractor?
TFR seems to expensive..7.8K..
*
U can try to.contact mr.herri 0182858562..price very reasonable.suggested by my fren.try la...
ericlaiys
post Jul 13 2013, 09:26 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Today, i just visited Felicia show unit while checking my unit. This phase came with 3 room + 2 bathroom. Show unit open till 7pm.
Meanwhile EMBER phase construction seem very fast.

This post has been edited by ericlaiys: Jul 13 2013, 09:28 PM
zsajiu
post Jul 15 2013, 11:21 AM

New Member
*
Newbie
2 posts

Joined: Jul 2013
Hi there. I'm just a newbie here.

Anyway, yesterday I also have a look at the show unit for Felicia.

It was a end lot right? 20x65. With around 4-5 feet extra right?

Anyhow.. upon checking the house, the house was actually around 15-16feet wide and around 35-37 feet long. That's mean yes, the land is 20x65 but the built up house just around 16x37 feet only. (I calculated based on the tiles as the tiles is around 1 feet).

What do you guys think?
ericlaiys
post Jul 15 2013, 02:33 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(zsajiu @ Jul 15 2013, 11:21 AM)
Hi there. I'm just a newbie here.

Anyway, yesterday I also have a look at the show unit for Felicia.

It was a end lot right? 20x65. With around 4-5 feet extra right?

Anyhow.. upon checking the house, the house was actually around 15-16feet wide and around 35-37 feet long. That's mean yes, the land is 20x65 but the built up house just around 16x37 feet only. (I calculated based on the tiles as the tiles is around 1 feet).

What do you guys think?
*
rclxms.gif You really calculated. Got 2 show unit (1 is corner and another one is just next to it(intermediate unit). Well, i just busy body and go checked up since new unit. I'm not sure what is the built up area. Like Dura is 20 X 70 but built up area is 20' X 50'. 20' go to car porch. Too bad the web site did not put Ember and Felicia Floor plan.
zsajiu
post Jul 15 2013, 03:37 PM

New Member
*
Newbie
2 posts

Joined: Jul 2013
ericlaiys,

Yup, have to calculate as the price is a bit high compare to the unit that I book at Jalan Kebun that just around 5 minutes from Felicia. I book for an end lot house 28x69 / free hold / build up 20x43 (building), 20x53 (to car porch) and 20x63 (to gate). 8 feet balance at my right side and 6 feet balance at the back. The price is just RM234800. Well, but the fencing is just a normal fencing and the car porch is just cement render. That's the only setback. Apart from that, should be no prob. Furthermore.. this is Freehold + Malay Reserve. 4r2b unit. I heard that they will be open a new phase at Bukit Naga but for 3r2b with price RM2++,000 soon. The previous Bukit Naga already finished, sold like hot cake the agent said.

The Felicia is leasehold and comparing the price.. well for me it a bit expensive. Anyhow, refer to our current house price in Klang, the price might be reasonable.

This post has been edited by zsajiu: Jul 15 2013, 03:51 PM
azmirsafuan
post Jul 24 2013, 08:04 AM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
cadia bila dpt kunci?
ericlaiys
post Jul 25 2013, 02:12 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(azmirsafuan @ Jul 24 2013, 08:04 AM)
cadia bila dpt kunci?
*
Yalor...i'm also waiting. Once Cadia get key, please let us know asap so it's dura turn. icon_idea.gif

This post has been edited by ericlaiys: Jul 25 2013, 02:12 PM
azmirsafuan
post Jul 25 2013, 04:12 PM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
QUOTE(ericlaiys @ Jul 25 2013, 02:12 PM)
Yalor...i'm also waiting. Once Cadia get key, please let us know asap so it's dura turn.  icon_idea.gif
*
huhu..sama la..harap2 cpt dapat cadia n dura...
ericlaiys
post Jul 30 2013, 10:43 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


any owner Phase 1 and phase 2? Need to check if got unifi or maxis fibre channel connectivity at bandar putera 2 klang? I just check coverage by using searching "Jalan Johan Setia". Found got coverage mentioned by both site.

From searching "Jalan Kebun Nenas" got coverage till KEBUN NENAS 4G/K8. Hopefully got.

This post has been edited by ericlaiys: Jul 30 2013, 10:51 PM
skcJVN
post Jul 30 2013, 11:15 PM

Regular
******
Senior Member
1,131 posts

Joined: Dec 2012
Why bandar putera klang in LYN hotter than bandar puteri klang ? No investors active here ?
langsk
post Aug 5 2013, 06:05 PM

Getting Started
**
Junior Member
179 posts

Joined: Sep 2008


Cadia owner here... I'm also waiting for key.... late 3 month my wife call the developer.. they say will be on aug...
ericlaiys
post Aug 5 2013, 07:02 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Dura update- They have put house number plate and lock the gate. So cannot visit except view from outside.
ericlaiys
post Aug 5 2013, 07:05 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(langsk @ Aug 5 2013, 06:05 PM)
Cadia owner here... I'm also waiting for key.... late 3 month my wife call the developer.. they say will be on aug...
*
Most likely will be sept as Hari Raya is around the corner. anyway, keep us update when they call you to get the key. Next will be dura. smile.gif
sikhwan3
post Aug 13 2013, 12:15 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


hai guys...i'm cadia owner... CD006 (facing basketball court) ... can't wait to get the keys.... rclxm9.gif rclxm9.gif rclxm9.gif rclxm9.gif

This post has been edited by sikhwan3: Aug 13 2013, 12:16 PM
ericlaiys
post Aug 13 2013, 12:44 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Aug 13 2013, 12:15 PM)
hai guys...i'm cadia owner... CD006 (facing basketball court) ... can't wait to get the keys.... rclxm9.gif  rclxm9.gif  rclxm9.gif  rclxm9.gif
*
Hi cadia owner,
Did you check that your electric and water meter has in?
sikhwan3
post Aug 13 2013, 02:38 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(ericlaiys @ Aug 13 2013, 12:44 PM)
Hi cadia owner,
Did you check that your electric and water meter has in?
*
emmmmmm....last few days before raya i go there...not yet install... sad.gif sad.gif sad.gif
ericlaiys
post Aug 13 2013, 02:45 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Aug 13 2013, 02:38 PM)
emmmmmm....last few days before raya i go there...not yet install... sad.gif  sad.gif  sad.gif
*
one stupid question. If not yet install, how to get CF? Is this normal as i saw no meter for Dura as well. i thought it is normal as they focused at Cadia right now.
In order to get CF, does the house need to has electric and water meter?
sikhwan3
post Aug 13 2013, 02:54 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(ericlaiys @ Aug 13 2013, 02:45 PM)
one stupid question. If not yet install, how to get CF? Is this normal as i saw no meter for Dura as well. i thought it is normal as they focused at Cadia right now.
In order to get CF, does the house need to has electric and water meter?
*
yaa loo....so when exactly IOI will install those things??emmmm... sad.gif sad.gif sad.gif

i ask them they said last week or this week should get CF... hmm.gif hmm.gif hmm.gif


vmad.gif vmad.gif vmad.gif vmad.gif
senapang
post Aug 15 2013, 12:25 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
just called ioi..expected the vp date will be on end of this month..

they will issue the letter, and after bank release the money to them, then only we can set for appointment with the person incharge..

it is ok for me coz my snp is 11 september..just checked last night.. i tot august..hahaha.. still they ahead the schedule la..
ericlaiys
post Aug 15 2013, 12:41 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(senapang @ Aug 15 2013, 12:25 PM)
just called ioi..expected the vp date will be on end of this month..

they will issue the letter, and after bank release the money to them, then only we can set for appointment with the person incharge..

it is ok for me coz my snp is 11 september..just checked last night.. i tot august..hahaha.. still they ahead the schedule la..
*
Good to hear that. Remember to post when they call and inspection time.
ericlaiys
post Aug 22 2013, 06:17 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Something to share. Crimes happened at our area (with grill):- http://www.youtube.com/watch?v=3tz8QGGXbkc&feature=youtu.be
langsk
post Aug 26 2013, 06:22 PM

Getting Started
**
Junior Member
179 posts

Joined: Sep 2008


any one got the exact floor measurement for Cadia... there are not much information in the floor plan in SPA.



This post has been edited by langsk: Aug 26 2013, 06:23 PM
langsk
post Aug 28 2013, 12:34 AM

Getting Started
**
Junior Member
179 posts

Joined: Sep 2008


Yes Yes Yes..... I got the letter from IOI to collect the key....
PiGGy ^(oo)^
post Aug 28 2013, 11:25 AM

Getting Started
**
Junior Member
63 posts

Joined: Oct 2011
Still pending for bank final disbursement....next week only can make appointment for key collection....
ericlaiys
post Aug 28 2013, 07:25 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(langsk @ Aug 28 2013, 12:34 AM)
Yes Yes Yes..... I got the letter from IOI to collect the key....
*
Cool. Do report any defect on your finding and share your procedure/experience
sikhwan3
post Aug 28 2013, 08:14 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


So weird..why i need to pay rm700++ for general maintenance fees?does everybody here know why?
sikhwan3
post Aug 28 2013, 08:21 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


General & infra maintenance fee = rm720
Quit rent = rm16.16
2nd half assesment = rm 37.52

Total = rm733.68

What are this payments for?

It is normal to pay before collect the key?

ericlaiys
post Aug 28 2013, 08:37 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Aug 28 2013, 08:21 PM)
General & infra maintenance fee = rm720
Quit rent = rm16.16
2nd half assesment = rm 37.52

Total = rm733.68

What are this payments for?

It is normal to pay before collect the key?
*
Yes. You need to pay. It is mentioned in the S & P. Wait till laywer call you to pay Master title ( i think is 5K)

This post has been edited by ericlaiys: Aug 28 2013, 08:41 PM
langsk
post Aug 28 2013, 08:57 PM

Getting Started
**
Junior Member
179 posts

Joined: Sep 2008


yap... I'm also need to paid the charges...

How is waiting our bank to make the last payment...


appointment of Key collection only can do on Monday - Saturday ..

This post has been edited by langsk: Aug 28 2013, 08:59 PM
sikhwan3
post Aug 28 2013, 09:25 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(ericlaiys @ Aug 28 2013, 08:37 PM)
Yes. You need to pay. It is mentioned in the S & P. Wait till laywer call you to pay Master title ( i think is 5K)
*
Ohh..i see..thanx cool2.gif
sikhwan3
post Aug 29 2013, 06:13 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(langsk @ Aug 28 2013, 08:57 PM)
yap... I'm also need to paid the charges...

How is waiting our bank to make the last payment...
appointment of Key collection only can do on Monday - Saturday ..
*
Same here bro....hope the bank approve the payment ASAP biggrin.gif biggrin.gif
ericlaiys
post Aug 29 2013, 09:03 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


oh my god!!!!! i also received letter (dura). Ask to pay 771.86 and then collect key. How come i no need to wait for bank to release money? But got mentioned, need 50+K. So what is the correct process

1. Pay RM700+
2. Wait for bank to release 50K
3. Call to make an appointment

And they say i must do within 14 days...... (unexpected thing happen). Why 14 days? I thought i will get the key by Nov. Anyone Dura owner who also having the same fate as mine?

This post has been edited by ericlaiys: Aug 30 2013, 07:09 AM
sikhwan3
post Aug 30 2013, 09:24 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(ericlaiys @ Aug 29 2013, 09:03 PM)
oh my god!!!!! i also received letter (dura). Ask to pay 771.86 and then collect key. How come i no need to wait for bank to release money? But got mentioned, need 50+K. So what is the correct process

1. Pay RM700+
2. Wait for bank to release 50K
3. Call to make an appointment

And they say i must do within 14 days...... (unexpected thing happen). Why 14 days? I thought i will get the key by Nov. Anyone Dura owner who also having the same fate as mine?
*
congrats bro... rclxm9.gif rclxm9.gif
ericlaiys
post Aug 30 2013, 10:53 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Alright just make a call.
Here is the info that i got:
1. Pay RM700+ (Settled before key collection)
2. Wait for bank to release 50K
3. Once release, call to make an appointment - must call to Putrajaya office (Not Bandar Puteri) - 03-89478636

Going to make payment this week. According to Sales Office Bandar Puteri, they are open tomorrow and also Sunday.

Then not restricted to 14 days as long you do so within a month to collect the key. If you dont collect , Putrajaya officer will call you and ask you to collect.

Wow....now so excited already as i know Maybank will make payment very fast. (hopefully)

This post has been edited by ericlaiys: Aug 30 2013, 10:59 AM
ericlaiys
post Aug 30 2013, 10:04 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Aug 28 2013, 08:21 PM)
General & infra maintenance fee = rm720
Quit rent = rm16.16
2nd half assesment = rm 37.52

Total = rm733.68

What are this payments for?

It is normal to pay before collect the key?
*
Total not correct. It is not 733. You sure posted correct amount?

This post has been edited by ericlaiys: Aug 30 2013, 10:12 PM
senapang
post Aug 31 2013, 12:26 AM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
Does it really must collect the key within 1 month? Is the maintenance fee is same for all unit ke or follow lot size? Mine also received already, need to go back parent house to collect n see..donno what is the figure to pay..cannot pay time collect key tu ke?
ericlaiys
post Aug 31 2013, 08:03 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(senapang @ Aug 31 2013, 12:26 AM)
Does it really must collect the key within 1 month? Is the maintenance fee is same for all unit ke or follow lot size? Mine also received already, need to go back parent house to collect n see..donno what is the figure to pay..cannot pay time collect key tu ke?
*
Your case similar like mine. I find out from my parent as i put my mailing address there.
So this is was the feedback that i have gathered when called them

a) within 14 days - should collect key. After 14 days then it is confirmed that developer has deliver the house and we cannot ask they to pay LAD for late deliver the house
b) within 1 month - developer want to collect all $$ and make profit . smile.gif Let say if you cannot make it, then u can assign another person (together with developer + your authorize letter). Called Putrajaya to let them know.
If i'm not mistaken, Bank will hold last 5% till you check for defect. So you must check or you just take the key and sign. smile.gif
d) Fees not sure if all the same. Based on the letter that i read yesterday (purposely went back hometown to get the letter)
My unit (Dura) breakdown (intermediate)
- General & infra maintenance - RM720
-Quit rent (9 Sept 2013 - 31- Dec 2013) - RM15.62
-2nd Half Assessment (9 Sept 2013-31 Dec 2013) - RM36.24

Total = 771.86

Payment by cash or bank draft. If credit card, there will be an extra charges. You can also pay during collect key.

This post has been edited by ericlaiys: Aug 31 2013, 08:05 AM
sikhwan3
post Aug 31 2013, 11:32 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(ericlaiys @ Aug 30 2013, 10:04 PM)
Total not correct. It is not 733. You sure posted correct amount?
*
Typo error... 773.68 the correct amount

cool2.gif cool2.gif
ericlaiys
post Aug 31 2013, 03:57 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Aug 31 2013, 11:32 AM)
Typo error... 773.68 the correct amount

cool2.gif  cool2.gif
*
wah....why your one slight expensive then mine. How they calculate? Izzit based on purchase price?
sikhwan3
post Aug 31 2013, 06:02 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(ericlaiys @ Aug 31 2013, 03:57 PM)
wah....why your one slight expensive then mine. How they calculate? Izzit based on purchase price?
*
hmm.gif hmm.gif dont know also...if based on purchase price i think your dura should pay more right....?because my cadia is intermidiate unit..the price should be less than dura.... hmm.gif hmm.gif
ericlaiys
post Aug 31 2013, 07:01 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Aug 31 2013, 06:02 PM)
hmm.gif  hmm.gif  dont know also...if based on purchase price i think your dura should  pay more right....?because my cadia is intermidiate unit..the price should be less than dura.... hmm.gif  hmm.gif
*
Yalor. My purchase price is RM263800. Unless your cadia is higher than that amount. tongue.gif

By the way, anyone engage top fellowship for their service?

senapang
post Aug 31 2013, 08:52 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
So bila u all nak collect the key? Maybe can meet u all there berkenal kenalan..hehe

I'm maybe next saturday..do we need to check for defect during collect key or can set another appointment for defect?
ericlaiys
post Aug 31 2013, 09:03 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(senapang @ Aug 31 2013, 08:52 PM)
So bila u all nak collect the key? Maybe can meet u all there berkenal kenalan..hehe

I'm maybe next saturday..do we need to check for defect during collect key or can set another appointment for defect?
*
Your bank clear payment already? You need to wait till they clear the payment. If not when you call them, they will check the system .if bank not yet bank in then they will reject on any appointment.

Get key and joint inspection on defect checking is together

This post has been edited by ericlaiys: Aug 31 2013, 09:05 PM
sikhwan3
post Sep 1 2013, 06:57 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(ericlaiys @ Aug 31 2013, 07:01 PM)
Yalor. My purchase price is RM263800. Unless your cadia is higher than that amount. tongue.gif

By the way, anyone engage top fellowship for their service?
*
I do...i ask them to do small renovation for my house...
ericlaiys
post Sep 1 2013, 07:07 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Sep 1 2013, 06:57 AM)
I do...i ask them to do small renovation for my house...
*
Did you take promo package? from their promo, if we dont want certain thing, will the price remain same or expensive. I'm not yet see them.
mind to share small renovation? Not sure what other services that they offered .
by the way, do we need to get council permit for small reno?
sikhwan3
post Sep 1 2013, 07:48 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(ericlaiys @ Sep 1 2013, 07:07 AM)
Did you take promo package? from their promo, if we dont want certain thing, will the price remain same or expensive. I'm not yet see them.
mind to share small renovation? Not sure what other services that they offered .
by the way, do we need to get council permit for small reno?
*
Yes..i do take the promo package...but i upgrade few things...u can nego if u dont want certain things...the price i think can be reduce...

I take the promo package + change the sliding door to safety door...only major renovation i think u need MPK permits..
ericlaiys
post Sep 1 2013, 06:47 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Sep 1 2013, 07:48 AM)
Yes..i do take the promo package...but i upgrade few things...u can nego if u dont want certain things...the price i think can be reduce...

I take the promo package + change the sliding door to safety door...only major renovation i think u need MPK permits..
*
hmmm....what is safety door? I thought just put grill. I also plan to remove some and add some. Probably i need to convert my yard to wet kitchen . Therefore, i may change yard wall to full wall and put roof. (may be this need permit).

By the way, i just make my payment to IOI. There is a counter for payment.
sikhwan3
post Sep 1 2013, 09:27 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(ericlaiys @ Sep 1 2013, 06:47 PM)
hmmm....what is safety door? I thought just put grill. I also plan to remove some and add some. Probably i need to convert my yard to wet kitchen . Therefore, i may change yard wall to full wall and put roof. (may be this need permit).

By the way, i just make my payment to IOI. There is a counter for payment.
*
Solid wood door...i think the contractor call it safety door since the door have 2 layers...very thick....i dont know how to describe but when you pass along earlier phase houses u can see a lot of other houses using it....

I plan maybe tomorrow or the day after tomorrow im going to make a payment...or maybe after bank release the ffinal payment...

ericlaiys
post Sep 1 2013, 09:41 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Sep 1 2013, 09:27 PM)
Solid wood door...i think the contractor  call it safety door  since the door have 2 layers...very thick....i dont know how to describe but when you pass along earlier phase houses u can see a lot of other houses using it....

I plan maybe tomorrow or the day after tomorrow  im going to make a payment...or maybe after bank release the ffinal payment...
*
May i know how much does it cost? By the way, once we put that, do you put grill? (more secure) smile.gif
sikhwan3
post Sep 2 2013, 10:04 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(ericlaiys @ Sep 1 2013, 09:41 PM)
May i know how much does it cost? By the way, once we put that, do you put grill?  (more secure) smile.gif
*
hmmm...im not remember...maybe around 7k++ u need to add from the promo package....u dont have to put extra grill bro...i think thats why they call it "safety door"...haha

thumbup.gif thumbup.gif
langsk
post Sep 2 2013, 01:59 PM

Getting Started
**
Junior Member
179 posts

Joined: Sep 2008


QUOTE(ericlaiys @ Aug 31 2013, 07:01 PM)
Yalor. My purchase price is RM263800. Unless your cadia is higher than that amount. tongue.gif

By the way, anyone engage top fellowship for their service?
*
I'm get the grill from them.. their kitchen package is quit expensive .
ericlaiys
post Sep 2 2013, 05:35 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(langsk @ Sep 2 2013, 01:59 PM)
I'm get the grill from them.. their kitchen package is quit expensive .
*
so split from package. Does the price remain the same or more expensive (grill)? I have looking around and compare. Seem like kitchen cabinet using concrete tiles is more expensive. So i think top fellowship price is reasonable
sikhwan3
post Sep 4 2013, 11:38 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


just went back from IOI sales office bandar puteri...paying maintenance fee rm790.51....got extra charge rm16.83 for interest advice....suppose to be only rm773.68... mad.gif mad.gif
ericlaiys
post Sep 4 2013, 08:44 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Sep 4 2013, 11:38 AM)
just went back from IOI sales office bandar puteri...paying maintenance fee rm790.51....got extra charge rm16.83 for interest advice....suppose to be only rm773.68... mad.gif  mad.gif
*
Why your one got interest?
sikhwan3
post Sep 5 2013, 10:52 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(ericlaiys @ Sep 4 2013, 08:44 PM)
Why your one got interest?
*
dont know..they told me i have late payment...not sure which one...maybe for the first payment..bank few days late for loan approval.... hmm.gif hmm.gif hmm.gif
ericlaiys
post Sep 5 2013, 02:50 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Sep 5 2013, 10:52 AM)
dont know..they told me i have late payment...not sure which one...maybe for the first payment..bank few days late for  loan approval.... hmm.gif  hmm.gif  hmm.gif
*
oh...you did not chase them to release 1st payment. I still recalled that i've chased the lawyer and bank to release 1st payment. Lucky i make it on times.
You consider lucky that it is not a lot.
sikhwan3
post Sep 5 2013, 04:54 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(ericlaiys @ Sep 5 2013, 02:50 PM)
oh...you did not chase them to release 1st payment. I still recalled that i've chased the lawyer and bank to release 1st payment. Lucky i make it on times.
You consider lucky that it is not a lot.
*
ya lor...by da way..do you know how much cost for "pecah lot" ?? they told me i need to pay around rm3k++ (maybe higher than that) ... i thought this payment included in loan but its not... haiyaaa...lari bajet looo rclxub.gif rclxub.gif rclxub.gif
ericlaiys
post Sep 5 2013, 05:11 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Sep 5 2013, 04:54 PM)
ya lor...by da way..do you know how much cost for "pecah lot" ?? they told me i need to pay around rm3k++ (maybe higher than that) ... i thought this payment included in loan but its not... haiyaaa...lari bajet looo   rclxub.gif  rclxub.gif  rclxub.gif
*
Do you mean change house master title to individual title? Dura cost 5K. It is mentioned during when you buy the house. If sales people give you the catalog, it is listed there and you need to fork up that money. (the breakdown of cost)

Lawyer will call soon.

haiz, just checked with bank. They still not yet release $$$.

This post has been edited by ericlaiys: Sep 5 2013, 05:15 PM
thumbellyna
post Sep 5 2013, 10:03 PM

New Member
*
Junior Member
6 posts

Joined: Sep 2013
Hi..im new here..dura owner...nak join tp xfasih english sgt..boleh ke?
dapur bhgian blkg ni mmg xleh extent lbh kn?mcm kecik sgt je kitchen tu nnti...maybe 5" x 9"



Attached thumbnail(s)
Attached Image
ericlaiys
post Sep 5 2013, 10:48 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(thumbellyna @ Sep 5 2013, 10:03 PM)
Hi..im new here..dura owner...nak join tp xfasih english sgt..boleh ke?
dapur bhgian blkg ni mmg xleh extent lbh kn?mcm kecik sgt je kitchen tu nnti...maybe 5" x 9"
*
Boleh. BM atau English. Bahagian yang itu kita panggil yard. Saya memang ada bercadang pakai yang itu sebagai "wet kitchen". Tapi tak mau pecah dinding. Cuma separuh wall dijadikan dinding penuh dan tutup bahagian itu.

Option 2 (back to english mode. Not use to BM after long time)
- Seal it using grill. Not sure option 1 (use cement) which one is expensive. Need to meet top fellowship and discuss about it. Anyone has any idea which is cheaper and expensive.

And if i'm not mistaken, both also require MPK permit.

thumbellyna
post Sep 5 2013, 11:16 PM

New Member
*
Junior Member
6 posts

Joined: Sep 2013
QUOTE(ericlaiys @ Sep 5 2013, 10:48 PM)
Boleh. BM atau English. Bahagian yang itu kita panggil yard. Saya memang ada bercadang pakai yang itu sebagai "wet kitchen". Tapi tak mau pecah dinding. Cuma separuh wall dijadikan dinding penuh dan tutup bahagian itu.

Option 2 (back to english mode. Not use to BM after long time)
- Seal it using grill. Not sure option 1 (use cement) which one is expensive. Need to meet top fellowship and discuss about it. Anyone has any idea which is cheaper and expensive.

And if i'm not mistaken, both also require MPK permit.
*
Yard tu igt nk letak mesin basuh..cuma confuse psl peti ais cmne..kunci pun xleh collect lg tggu bank release...2days b4 ad g tgk rumh skrg kira safe skit sb guard ask surat dlu bru bg masuk...xd surat xleh masuk...sy lorong 4N
ericlaiys
post Sep 5 2013, 11:40 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(thumbellyna @ Sep 5 2013, 11:16 PM)
Yard tu igt nk letak mesin basuh..cuma confuse psl peti ais cmne..kunci pun xleh collect lg tggu bank release...2days b4 ad g tgk rumh skrg kira safe skit sb guard ask surat dlu bru bg masuk...xd surat xleh masuk...sy lorong 4N
*
Put washing machine without lock? You sure no one going to steal. I rather put at dry kitchen. Last sunday went there, saw the guard as well but they did not block me. I just passed by my house. Still no water and electricity meter. Is this normal? Now wonder when they going to put electric and water meter?

thumbellyna
post Sep 6 2013, 10:33 AM

New Member
*
Junior Member
6 posts

Joined: Sep 2013
QUOTE(ericlaiys @ Sep 5 2013, 11:40 PM)
Put washing machine without lock? You sure no one going to steal. I rather put at dry kitchen. Last sunday went there, saw the guard as well but they did not block me. I just passed by my house. Still no water and electricity meter. Is this normal? Now wonder when they going to put electric and water meter?
*
I think ok kut sb nnti wat grill kt gate ke...or kena tgk dlu cmne nk adjust balik sb peti ais kena pkir gak nk ltak kt kitchen...u can passed ur house?bkn ad lock kt gate house ke?cmne interence?
ericlaiys
post Sep 6 2013, 10:50 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(thumbellyna @ Sep 6 2013, 10:33 AM)
I think ok kut sb nnti wat grill kt gate ke...or kena tgk dlu cmne nk adjust balik sb peti ais kena pkir gak nk ltak kt kitchen...u can passed ur house?bkn ad lock kt gate house ke?cmne interence?
*
yup. they locked the house gate. Now the question is put grill also need MPK permit?
sikhwan3
post Sep 6 2013, 10:56 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


hai tumbelyna...berapa kos nak extend dapur tu? kalu murah2..i pun nak follow... :-)
ericlaiys
post Sep 6 2013, 12:10 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(thumbellyna @ Sep 6 2013, 10:33 AM)
I think ok kut sb nnti wat grill kt gate ke...or kena tgk dlu cmne nk adjust balik sb peti ais kena pkir gak nk ltak kt kitchen...u can passed ur house?bkn ad lock kt gate house ke?cmne interence?
*
Kalau washing machine letak di yard, then kena minta plumber pasang paip baru. Sudah minta quotation?

This post has been edited by ericlaiys: Sep 6 2013, 12:10 PM
thumbellyna
post Sep 6 2013, 08:50 PM

New Member
*
Junior Member
6 posts

Joined: Sep 2013
QUOTE(ericlaiys @ Sep 6 2013, 12:10 PM)
Kalau washing machine letak di yard, then kena minta plumber pasang paip baru. Sudah minta quotation?
*
Blum lg r..bru planning je dlu..hehhe5 pe2 pun kena tgk keadaan dlmn umh tu dlu bru leh pkir idea bernas..;p mybe btul kena mtk plumber psl paip tu sb washing machibe mmg xmuat kt kitchen lps peti ais pun ad skli...mmg perlu permit meh utk gate??igtkn xperlu
thumbellyna
post Sep 6 2013, 08:53 PM

New Member
*
Junior Member
6 posts

Joined: Sep 2013
QUOTE(sikhwan3 @ Sep 6 2013, 10:56 AM)
hai tumbelyna...berapa kos nak extend dapur tu? kalu murah2..i pun nak follow... :-)
*
Hi sikhwan..u owner dura jugak yea..kos x decide lg sb tggu dpt key bru leh pkir2 psl extend tu.tongue.gif ad kwn suggest kontrktor indon tp xsure lg psl dia punya quotation brp..cuma igt nnti gate dpn umh nk pecahkn utk 2 kete masuk..u think perlu permit jugak ke?
mimieukk
post Sep 6 2013, 11:57 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
Hi.i cadia owner.will get key this tuesday.i ada borak dgn nadia officer yg handle tu.dia kata kita kena push our bank to release cepat lg2 yg gomen nyerr.x perlu byr dulu maimtenance fee tu.nanti bank dah release.u call nadia set appoitment.n dtg awl byr maintenance fee tu masa ambil kunci.

I pun nak renovate my house.based on feedbAck alpania n basella owner.if u want to take top fellow.u kena confirm the price n brg betul2.n.bcoz kat site dia ckp lain.kat umah contoh lain.tu feedback early phase.

For me top fellow mahal but i heard klu kita ambil org luar dia kacau.not sure betul ketak
ericlaiys
post Sep 7 2013, 08:10 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


For release $$ by bank, i'm no hurry as it is earlier than expected (expect Nov). They will definitely release by this month since developer released the letter by 26th and i received it on 29th August.

Spoil my planning schedule... smile.gif

Mind share what feedback that previous phase give? So are you taking top?
Initially when i saw their promo, i also think that it is expensive on kitchen and rest of parts is cheap. But after survey long, realized some contractor even expensive. Example:
a) grill - cheaper than others. (other quote almost 3K for whole house)
b) plaster ceiling - no comment
c) kitchen cabinet - realize expensive due to concrete and tiles for more long lasting. Others did not offers concrete & plumbing, that why can go cheap. Now after comparing other contractor, it make no different.

Well, i'm going to meet them today afternoon and discuss (top - is my last meeting contractor coz i think they are expensive). Look like i'm going back to them. Let see how.

Thanks for the advise on price & products. No wonder they ask me to go direct show unit at bandar puteri. Need to be careful on this.

Stay tuned!

This post has been edited by ericlaiys: Sep 7 2013, 08:23 AM
mimieukk
post Sep 7 2013, 09:23 AM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
Yes their grill murah but only 1 design im not mistaken.if u nak yg lain will dff price.my sis in law cassia owner.if u realise all grill at cassia same design.i staying around they so i will take contractor kat situ jerr.my fil house kat taman sahjuga.
sikhwan3
post Sep 7 2013, 11:29 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(thumbellyna @ Sep 6 2013, 08:53 PM)
Hi sikhwan..u owner dura jugak yea..kos x decide lg sb tggu dpt key bru leh pkir2 psl extend tu.tongue.gif ad kwn suggest kontrktor indon tp xsure lg psl dia punya quotation brp..cuma igt nnti gate dpn umh nk pecahkn utk 2 kete masuk..u think perlu permit jugak ke?
*
Xla...i owner cadia...kalu nak buat major revno mcm tu kene permit rasanya... biggrin.gif biggrin.gif
sikhwan3
post Sep 7 2013, 11:42 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(mimieukk @ Sep 6 2013, 11:57 PM)
Hi.i  cadia owner.will get key this tuesday.i ada borak  dgn nadia officer yg  handle tu.dia kata kita kena push our bank to release cepat lg2 yg gomen nyerr.x perlu byr dulu maimtenance fee tu.nanti bank dah release.u call nadia set appoitment.n dtg awl byr maintenance fee tu masa ambil kunci.

I pun nak renovate my house.based on feedbAck alpania n basella owner.if u want to take top fellow.u  kena confirm the price  n brg betul2.n.bcoz kat site dia ckp lain.kat umah contoh lain.tu feedback early phase.

For me top fellow mahal but i heard klu kita ambil org luar dia kacau.not sure betul ketak
*
Hai...nanti dah inspection rumah boleh share experience ya... smile.gif
mimieukk
post Sep 7 2013, 01:31 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
Sambung yard x perlu permit
ericlaiys
post Sep 7 2013, 09:35 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mimieukk @ Sep 7 2013, 01:31 PM)
Sambung yard x perlu permit
*
Yard with full wall - require MPK permit as got touch the structure
Yard with just grill - not require MPK permit
ericlaiys
post Sep 7 2013, 10:43 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mimieukk @ Sep 7 2013, 09:23 AM)
Yes their grill murah but only 1 design im not mistaken.if u nak yg lain will dff price.my sis in law cassia owner.if u realise all grill at cassia same design.i staying around they so i will take contractor kat situ jerr.my fil house kat taman  sahjuga.
*
Just checked with them. Got few design that you can choose. But i end up choose high & solid quality. They bring me and show (low quality) and (high quality). Decided on high quality and end up paying extra 2K. (what to do, whole house)

By the way, cadia/dura promotion end tomorrow. Start monday the price will increase more.
mimieukk
post Sep 7 2013, 10:51 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
how much ur grill
ericlaiys
post Sep 7 2013, 10:54 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mimieukk @ Sep 7 2013, 10:51 PM)
how much ur grill
*
4 K. Deposit paid RM500.

Here is what i have gathered:-
a) Sink & tap for kitchen - you need to buy yourself
b) lighting -- you need to buy yourself
c) fan -- you need to buy yourself
d) promo package excluded wiring for extra plug pin, water heater, Astro, air con point, Unifi point etc

This post has been edited by ericlaiys: Sep 7 2013, 10:58 PM
mimieukk
post Sep 7 2013, 11:43 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013


Here is what i have gathered:-
a) Sink & tap for kitchen - you need to buy yourself
b) lighting -- you need to buy yourself
c) fan -- you need to buy yourself
d) promo package excluded wiring for extra plug pin, water heater, Astro, air con point, Unifi point etc
*

[/quote]






meaning?
ericlaiys
post Sep 8 2013, 12:42 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


[quote=mimieukk,Sep 7 2013, 11:43 PM]
Here is what i have gathered:-
a) Sink & tap for kitchen - you need to buy yourself
b) lighting -- you need to buy yourself
c) fan -- you need to buy yourself
d) promo package excluded wiring for extra plug pin, water heater, Astro, air con point, Unifi point etc
*

[/quote]
meaning?
*

[/quote]
meaning the promo package does not covered everything. (Cooking hob also need to get it yourself). Saw the kitchen cabinet, very solid. Today discussion not sufficient, tomorrow i'm going to discuss with them again. tongue.gif

This post has been edited by ericlaiys: Sep 8 2013, 12:43 AM
mimieukk
post Sep 8 2013, 08:29 AM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
Ooo.fan i dah beli.lampu will beli kedai kat puchong.very cheap but need to q bila nk bayar.ambil no ok.got 1 contractor estimate sambung blakang around 3k++.but need to ukur first.wiring my uncle can do..tgh survey blower .got some my hubby fren use it.n berbaloi.jimat duit.kurang pki aircond
ericlaiys
post Sep 8 2013, 12:25 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mimieukk @ Sep 8 2013, 08:29 AM)
Ooo.fan i dah beli.lampu will beli kedai kat puchong.very cheap but need to q bila nk bayar.ambil no ok.got 1 contractor estimate sambung blakang around 3k++.but need to ukur first.wiring my uncle can do..tgh survey blower .got some my hubby fren use it.n berbaloi.jimat duit.kurang pki aircond
*
Nama kedai? So fast, u already know which house area for lamp.
Sambung belakang - full wall & roof? or just grill

This post has been edited by ericlaiys: Sep 8 2013, 12:27 PM
mimieukk
post Sep 8 2013, 12:44 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
Im not sure nama kedai bcoz my hubby yg bawa.but everyday ramai org..kedai dia tepi jalan besar kat area puchong.
Sambung blakang full wall n roof.

Fan i beli online.dapat rm165.remote punya.ok tak..
ericlaiys
post Sep 8 2013, 01:20 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mimieukk @ Sep 8 2013, 12:44 PM)
Im not sure nama kedai bcoz my hubby yg bawa.but everyday ramai org..kedai dia tepi jalan besar kat area puchong.
Sambung blakang full wall n roof.

Fan i beli online.dapat rm165.remote punya.ok tak..
*
must be top 10 or house of lighting. Fan brand?

mimieukk
post Sep 8 2013, 01:51 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
Fan brand im not remember.buy 6 .2 already giiv my fil house.ook jerr dia guna
ericlaiys
post Sep 9 2013, 02:33 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


anyone plan to put air cond for Room 2(next to master bedroom)? By the way, developer only do 4 point fan. Anyone has any idea which area don't have fan?
mimieukk
post Sep 10 2013, 01:30 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
I got my key now.checking the defect.
mimieukk
post Sep 10 2013, 02:05 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
Meter electrik n air x masuk lagi.o far minor defect.

This post has been edited by mimieukk: Sep 10 2013, 02:14 PM
ericlaiys
post Sep 10 2013, 02:39 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mimieukk @ Sep 10 2013, 02:05 PM)
Meter electrik n air x masuk lagi.o far minor defect.
*
few question:-
a)they got mention when come in?
b)How long did you take to check?
c)your one is cadia/dura?
d) Is the sink there?
e)If just minor defect, then should be very fast they fix the problem and can start renovation.

This post has been edited by ericlaiys: Sep 10 2013, 02:41 PM
sikhwan3
post Sep 10 2013, 02:56 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


i call alliance bank just now...they told me they will release the final payment on 18 September....becoz thats the due date given by IOI..

aiyooooooo sad.gif sad.gif doh.gif doh.gif
mimieukk
post Sep 10 2013, 02:57 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
QUOTE(ericlaiys @ Sep 10 2013, 02:39 PM)
few question:-
a)they got mention when come in?
b)How long did you take to check?
c)your one is cadia/dura?
d) Is the sink there?
e)If just minor defect, then should be very fast they fix the problem and can start renovation.
*
Nope.they said dah ada but i saw tnb van outside
For checking with oifficer about 1 and half hour i think.then i proceed the checking n fill in the defect form and sed back to ioi bandar puteri.
Cadia
Yes sink is there.only xda paip.
Dalam seminggu mungkin.

I sambung blakang get about 8k.
Sambung blakNG
TABLE TOP
Change toilet duduk to toilet cangkung
Tambah 1 bilik air


Deal dgn nyanmar keje buat rumah situ
sikhwan3
post Sep 10 2013, 03:00 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(mimieukk @ Sep 10 2013, 02:57 PM)
Nope.they said dah ada but i saw tnb van outside
For checking with oifficer about 1 and half hour i think.then i proceed the checking n fill in the defect form and sed back to ioi bandar puteri.
Cadia
Yes sink is there.only xda paip.
Dalam seminggu mungkin.

I sambung blakang get about 8k.
Sambung blakNG
TABLE TOP
Change toilet duduk to toilet cangkung
Tambah 1 bilik air
Deal dgn nyanmar keje buat rumah situ
*
kepala paip kene beli sendri ke atau sepatutnya pemaju letak...?
mimieukk
post Sep 10 2013, 03:03 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
diaorg bg.masa nak pindah diaorg install panggil plumber
ericlaiys
post Sep 10 2013, 03:07 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mimieukk @ Sep 10 2013, 02:57 PM)
Nope.they said dah ada but i saw tnb van outside
For checking with oifficer about 1 and half hour i think.then i proceed the checking n fill in the defect form and sed back to ioi bandar puteri.
Cadia
Yes sink is there.only xda paip.
Dalam seminggu mungkin.

I sambung blakang get about 8k.
Sambung blakNG
TABLE TOP
Change toilet duduk to toilet cangkung
Tambah 1 bilik air
Deal dgn nyanmar keje buat rumah situ
*
Need to immediate send defect form? Don't give extra time to check. Can come back and submit later.
8K is cheap. Cement & Roof (seal everything)?
Got place to put toilet? Wow...3 toilet in a house...hmmm
mimieukk
post Sep 10 2013, 04:13 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
No need.u can send later.since i cuti 1 hari .i settle semua..and gud thing today raining so senang tgk mana bocor.8k except we need beli mozek and sinki if we dont want used the current on n mangkuk cangkung.all he provided
mimieukk
post Sep 10 2013, 04:16 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
I sambung the yard.so tutup tingkap bilik blakang buat anoher bilik air.
The nyanmar said if dpn tambah mozek pecah untuk masuk 2 keta.dia ambil 3 k except mozek belik sendiri n also gate.
eddie368
post Sep 10 2013, 04:20 PM

Getting Started
**
Junior Member
56 posts

Joined: Jun 2009
QUOTE(netcrawler @ Nov 22 2011, 09:40 PM)
anything wrong with Indian? Please don't be racist as majority of Indian are good citizens. Only small portion especially those
living near Taman Sentosa are notorious for their gangster-ism. Then again. goverment should be blame for not treat them equally.
*
This is not racist just voice out... i agree with them... i knew alot of indians will protect their own race when something bads happened to them.
I have indian and singh frens too... many of them don't even like their race... they feel humilate.
mimieukk
post Sep 10 2013, 04:21 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
The 8k include i suruh touchip the cyiling since x leh renovate.ada 2 tahun waranty.
ericlaiys
post Sep 10 2013, 04:23 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mimieukk @ Sep 10 2013, 04:21 PM)
The 8k include i suruh touchip the cyiling since x leh renovate.ada 2 tahun waranty.
*
better minimize reno. I only do kitchen cabinet , turn yard to wet kitchen and grill
mimieukk
post Sep 10 2013, 04:33 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
Cyiling i x buat apa2 just the garis2 kayu tu i suruh touch ip sikit.nampak kemas.x nampak bersegi2.
ericlaiys
post Sep 12 2013, 12:09 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Yeah!....Bank has released $$$ but developer not yet receive the $$$. Anyway, according to them appointment to collect key has full till 23 Sept. So tomorrow need to call again to double check if they receive payment & make appointment.
Wonder why no one post feedback on collect key & check defect. (so far only see 1 response)
sikhwan3
post Sep 12 2013, 01:49 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(ericlaiys @ Sep 12 2013, 12:09 PM)
Yeah!....Bank has released $$$ but developer not yet receive the $$$. Anyway, according to them appointment to collect key has full till 23 Sept. So tomorrow need to call again to double check if they receive payment & make appointment.
Wonder why no one post feedback on collect key & check defect. (so far only see 1 response)
*
congratss bro..u make me jealous...hahaha tongue.gif tongue.gif
ericlaiys
post Sep 13 2013, 10:12 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Sep 12 2013, 01:49 PM)
congratss bro..u make me jealous...hahaha tongue.gif  tongue.gif
*
haha...no need to jealous. you will get the key soon as well. Well, just checked with developer, they not yet receive $$$ yet. I thought nowaday electronic system should be faster.

Additional info:-
a) 1 day only can take 5 appointments.
b) Each appointment duration is 1 hour and 30 minute.

Well, try call them again next week.
sikhwan3
post Sep 13 2013, 10:35 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(ericlaiys @ Sep 13 2013, 10:12 AM)
haha...no need to jealous. you will get the key soon as well. Well, just checked with developer, they not yet receive $$$ yet. I thought nowaday electronic system should be faster.

Additional info:-
a) 1 day only can take 5 appointments.
b) Each appointment duration is 1 hour and 30 minute.

Well, try call them again next week.
*
as far as i know...bank will issue cheque to lawyer...this may take few days for developer to get the money.....
ericlaiys
post Sep 15 2013, 05:51 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Sink is already installed
Electricity meter has installed as well.
Water meter still not yet.
Today i saw one unit of Dura has started renovation. Went to site visit and discuss with my contractor about my renovation design. They have put the banner at my gate. Saw few house is also the same. Most likely they are getting the same contractor.

Cadia /dura owner (which has took the key), is your water meter in?

This post has been edited by ericlaiys: Sep 16 2013, 10:57 AM
senapang
post Sep 15 2013, 09:38 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
QUOTE(mimieukk @ Sep 10 2013, 04:21 PM)
The 8k include i suruh touchip the cyiling since x leh renovate.ada 2 tahun waranty.
*
Hi there, what actually they do for the ceiling? What do u mean by touch up? Is it they skim coat and then they paint it all over again? How much they quoted u for that?
mimieukk
post Sep 16 2013, 08:50 AM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
Since ada waranty 2 tahun.ix leh buat palster ceiling lg.so wat i ask just sekatakan the ceiling.yeP i think they said skim coat.i x pastii.after discusing.change our mind.x jd buat 2 toilet.we just extend the kitchen n bathroom.bilik air blakang kecik ok.

This post has been edited by mimieukk: Sep 16 2013, 07:11 PM
ericlaiys
post Sep 16 2013, 09:03 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mimieukk @ Sep 16 2013, 08:50 AM)
Since ada waranty 2 tahun.ix leh buat palster ceiling lg.so wat i ask just sekatakan the  ceiling.yeP i think they said skim coat.i x pastii.after discusing.change our mind.x jd buat 2 toilet.we just extend the kitchen n bathroom.bilik air blakang kecik ok.then buat table top then change toilet to toilet cangkung.sekatakan skim coat..we get 6500.tp mozek  magkuk toilet n sinki kena beli sendiri..wat do you thng...
*
just check, room that next to yard and dining hall don't have fan hook . Am i correct?
mimieukk
post Sep 16 2013, 09:22 AM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
Second room ceiling tinggi.kena pakai kipas dinding .yeap dining hall xda hook.kena buat sendiri
ericlaiys
post Sep 16 2013, 10:06 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mimieukk @ Sep 16 2013, 09:22 AM)
Second room  ceiling tinggi.kena pakai kipas dinding .yeap dining hall xda hook.kena buat sendiri
*
I saw third room don't have fan hook. Not sure about 2nd room (next to masterbedroom).

This post has been edited by ericlaiys: Sep 16 2013, 10:55 AM
mimieukk
post Sep 16 2013, 10:51 AM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
Opps lupa .yep 3rd room xda juga
ericlaiys
post Sep 16 2013, 10:52 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Another question:
On the master bedroom bathroom, is the water from direct pipe or from tank? Very important to know as need to think about getting water heater type?
Then another bathroom (2)- anyone put water heater? If yes, need to know the water from direct or from tank?
Thanks
ericlaiys
post Sep 16 2013, 10:53 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mimieukk @ Sep 16 2013, 10:51 AM)
Opps lupa .yep 3rd room xda juga
*
According to developer catalog, suppose got 4 fan? Then where is 1 fan located.
fan 1 - master bedroom
fan 2 - living room
fan 3 - room 4
fan 4 - missing???? ( or located in room 2)
ericlaiys
post Sep 16 2013, 10:55 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Another question regarding tap:-
a) Is tap provided for kitchen sink, basin @ masterbedroom bath room and bathroom 2(outside)? I dont see any tap as well. Are we suppose to buy ourself?

This post has been edited by ericlaiys: Sep 16 2013, 11:06 AM
mimieukk
post Sep 16 2013, 12:26 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
I have..when u take the key.ari tu baru dia install.but not sure klu dah install dulu then org curi
mimieukk
post Sep 16 2013, 12:31 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
QUOTE(ericlaiys @ Sep 16 2013, 10:52 AM)
Another question:
On the master bedroom bathroom, is the water from direct pipe or from tank? Very important to know as need to think about getting water heater type?
Then another bathroom (2)- anyone put water heater? If yes, need to know the water from direct or from tank?
Thanks
*
All ffrom tankr
mimieukk
post Sep 16 2013, 12:32 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
QUOTE(ericlaiys @ Sep 16 2013, 10:53 AM)
According to developer catalog, suppose got 4 fan? Then where is 1 fan located.
fan 1 - master bedroom
fan 2 - living room
fan 3 - room 4
fan 4 - missing???? ( or located in room 2)
*
Second room
mimieukk
post Sep 16 2013, 12:33 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
QUOTE(ericlaiys @ Sep 16 2013, 10:55 AM)
Another question regarding tap:-
a) Is tap provided for kitchen sink, basin @ masterbedroom bath room and bathroom 2(outside)? I dont see any tap as well. Are we suppose to buy ourself?
*
I ada.mungkin maa ambil key baru install kot.takut ilang
ericlaiys
post Sep 16 2013, 01:40 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mimieukk @ Sep 16 2013, 12:26 PM)
I have..when u take the key.ari tu baru dia install.but not sure klu dah install dulu then  org curi
*
I saw from outside kitchen windows, it is not there. Still cannot access as i not yet get the key. Will double check when get the key
ericlaiys
post Sep 16 2013, 01:41 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mimieukk @ Sep 16 2013, 12:31 PM)
All ffrom tankr
*
from tank, then need to buy water heater with pump. sad.gif
ericlaiys
post Sep 16 2013, 01:42 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mimieukk @ Sep 16 2013, 12:33 PM)
I ada.mungkin maa ambil key baru install kot.takut ilang
*
may be. thank for the clarification
ericlaiys
post Sep 16 2013, 01:44 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mimieukk @ Sep 16 2013, 12:32 PM)
Second room
*
if 2nd room, then no need to install wall fan. smile.gif
Just a bit high from ceiling. Wonder if air can travel down. Well, that room i already plan to install air-con. So should be ok
Since room 3 dont have fan, then best is convert it to store room. smile.gif

This post has been edited by ericlaiys: Sep 16 2013, 01:45 PM
mimieukk
post Sep 16 2013, 01:48 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
QUOTE(ericlaiys @ Sep 16 2013, 01:44 PM)
if 2nd room, then no need to install wall fan. smile.gif
Just a bit high from ceiling. Wonder if air can travel down. Well, that room i already plan to install air-con. So should be ok
Since room 3 dont have fan, then best is convert it to store room. smile.gif
*
Kn sebab tinggi ke tangki air ceiling dia
mimieukk
post Sep 16 2013, 01:48 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
Second room xda hook
ericlaiys
post Sep 16 2013, 01:49 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mimieukk @ Sep 16 2013, 01:48 PM)
Second room xda hook
*
dont have hook? then my original question is where the missing fan put? Suppose got 4 fan hook. rclxub.gif

This post has been edited by ericlaiys: Sep 16 2013, 01:50 PM
mimieukk
post Sep 16 2013, 02:09 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
Sorry.hook ada 3 point ada 4 .
ericlaiys
post Sep 16 2013, 02:10 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


from dura s & p agreement:-


Attached thumbnail(s)
Attached Image
ericlaiys
post Sep 16 2013, 02:13 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mimieukk @ Sep 16 2013, 02:09 PM)
Sorry.hook ada 3 point ada 4 .
*
(confused)- can help to list down where all the fan hook located?
mimieukk
post Sep 16 2013, 02:32 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
Hall master n 4th room
mimieukk
post Sep 16 2013, 03:08 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
Reno starting
ericlaiys
post Sep 16 2013, 03:11 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mimieukk @ Sep 16 2013, 03:08 PM)
Reno starting
*
Wow..so fast. No need to wait for defect fix? Mind tell us what each picture do
Pic 1: Look with sealing it. Where? Look like room 3
Pic 2: Hacking wet kitchen
Pic 3: Combine yard & wet kitchen. So are you going to seal yard to make it full cement? Without extra beam?

by the way got mpk permit?

This post has been edited by ericlaiys: Sep 16 2013, 03:52 PM
duckaton
post Sep 16 2013, 03:47 PM

Progress is Imminent
******
Senior Member
1,216 posts

Joined: Mar 2009
From: Cut Throat Land
QUOTE(mimieukk @ Sep 16 2013, 03:08 PM)
Reno starting
*
what did you do?

looks more like demolition than reno.
ericlaiys
post Sep 17 2013, 03:57 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


i just confirmed my appointment, Will collect my key on 27 Sept 2013-10.30am
ericlaiys
post Sep 18 2013, 10:46 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Hi new cadia/dura owner,

If you interested on UNIFI, kindly create a demand list to Telekom in this site:-
https://occ.unifi.my/HSBBCustomerPortal/HSB...e_checkcoverage

Type:- Bandar Putera 2 Klang. (Search on the Address Keyword)
Then go down to the end of the page and click link to register

I've registered mine and hopefully they can pull fibre to our area if got a lot of demand. Cannot survive without fixed Internet.

So please register (if you interested)

This post has been edited by ericlaiys: Sep 18 2013, 10:49 AM
azmirsafuan
post Sep 18 2013, 04:22 PM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
BPP x release payment lg...huhuhuh
ericlaiys
post Sep 18 2013, 05:15 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(azmirsafuan @ Sep 18 2013, 04:22 PM)
BPP x release payment lg...huhuhuh
*
Bpp ? what bank is that?
mimieukk
post Sep 18 2013, 10:42 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
bpp ni gomen nyerr loan ehh
mimieukk
post Sep 18 2013, 10:48 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
hampir.siap


Attached thumbnail(s)
Attached Image
azmirsafuan
post Sep 19 2013, 09:05 AM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
QUOTE(mimieukk @ Sep 18 2013, 10:48 PM)
hampir.siap
*
u wat reno ape je kt umah tuh? ce cite sket
mimieukk
post Sep 19 2013, 09:28 AM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
QUOTE(azmirsafuan @ Sep 19 2013, 09:05 AM)
u wat reno ape je kt umah tuh? ce cite sket
*
i pecah tepi.besarkan dapur n bilik air.if current nyerr dapur.buat table top terus kecik.cannot letak peti ais .bilik air pun dinding tepi yard tu i pecah teus sambungkan .besarkan juga.bilik air juga kecik.susah woo.my mum always basuh baju dia pakai tangan..
azmirsafuan
post Sep 19 2013, 09:48 AM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
QUOTE(mimieukk @ Sep 19 2013, 09:28 AM)
i pecah tepi.besarkan dapur n bilik air.if current nyerr dapur.buat table top terus kecik.cannot letak peti ais .bilik air pun dinding tepi yard tu i pecah teus sambungkan .besarkan juga.bilik air juga kecik.susah woo.my mum always basuh baju dia pakai tangan..
*
how much kena? leh site visit ke rumah u? hahahah
mimieukk
post Sep 19 2013, 09:53 AM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
QUOTE(azmirsafuan @ Sep 19 2013, 09:48 AM)
how much kena? leh site visit ke rumah u? hahahah
*
total below 10k

plus
1.change the toilet bowl to cangkung nyerr -kena beli baru
2.mozek i beli sendiri ngan table top nyerr-suggest kat puchong.cheap .2x2.design kat sini about rm25 but kat sana rm19 only.
3.sinki also beli sendiri.


rumah u no berapa.i buat ngan nyanmar situ gak.if luar for sure kena tunggu bcoz air x masuk lg.diaorg buat cepat n byr sikit2.

i also suruh diaorg plaster back ceiling sekatakan .baru nampak lawa.

This post has been edited by mimieukk: Sep 19 2013, 09:55 AM
azmirsafuan
post Sep 19 2013, 10:12 AM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
QUOTE(mimieukk @ Sep 19 2013, 09:53 AM)
total below 10k

plus
1.change the toilet bowl to cangkung nyerr -kena beli baru
2.mozek i beli sendiri ngan table top nyerr-suggest kat puchong.cheap .2x2.design kat sini about rm25 but kat sana rm19 only.
3.sinki also beli sendiri.
rumah u no berapa.i buat ngan nyanmar situ gak.if luar for sure kena tunggu bcoz air x masuk lg.diaorg buat cepat n byr sikit2.

i also suruh diaorg plaster back ceiling sekatakan .baru nampak lawa.
*
i rasa no.49 kot..i beli dura..umah u no brape??
mcm ok price dia tp kn cek dulu duit..plan nk wat mininum reno je..limited budjet..
weken ni plan nk site survey..

mimieukk
post Sep 19 2013, 10:18 AM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
QUOTE(azmirsafuan @ Sep 19 2013, 10:12 AM)
i rasa no.49 kot..i beli dura..umah u no brape??
mcm ok price dia tp kn cek dulu duit..plan nk wat mininum reno je..limited budjet..
weken ni plan nk site survey..
*
i cadia.mmg min reno pun ni.tak buat byk just dapur jerr..kitchen cabinet pun tak buat.just table top.mls nak beli perabut dapur.

i ari2 pergi site.rumah kat sini2 juga

sikhwan3
post Sep 19 2013, 10:41 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


yeee haaaa....appointment ambil kunci 25 september ni....

rclxm9.gif rclxm9.gif rclxm9.gif rclxm9.gif
mimieukk
post Sep 19 2013, 10:45 AM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
QUOTE(sikhwan3 @ Sep 19 2013, 10:41 AM)
yeee haaaa....appointment ambil kunci 25 september ni....

rclxm9.gif  rclxm9.gif  rclxm9.gif  rclxm9.gif
*
u dura kerr cadia
sikhwan3
post Sep 19 2013, 11:01 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(mimieukk @ Sep 19 2013, 10:45 AM)
u dura kerr cadia
*
cadia....umah mengadap padang permainan...dekat2 ngan stesen TNB smile.gif smile.gif
azmirsafuan
post Sep 19 2013, 11:10 AM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
QUOTE(mimieukk @ Sep 19 2013, 10:18 AM)
i cadia.mmg min reno pun ni.tak buat byk just dapur jerr..kitchen cabinet pun tak buat.just table top.mls nak beli perabut dapur.

i ari2 pergi site.rumah kat sini2 juga
*
boleh ke klu i g umh u tgk camne? kot2 bini berkenan leh la wat gak cam u..huhuh...tongue.gif
sikhwan3
post Sep 19 2013, 11:27 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(azmirsafuan @ Sep 19 2013, 11:10 AM)
boleh ke klu i g umh u tgk camne? kot2 bini berkenan leh la wat gak cam u..huhuh...tongue.gif
*
nak follow jugak...boleh buat reference nanti... biggrin.gif biggrin.gif
azmirsafuan
post Sep 19 2013, 11:28 AM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
QUOTE(sikhwan3 @ Sep 19 2013, 11:27 AM)
nak follow jugak...boleh buat reference nanti...  biggrin.gif  biggrin.gif
*
kn tgu tuan tanah bg approval dulu..huhu..
tgk kt fesbuk..mcm best je komuniti ni..
mimieukk
post Sep 19 2013, 11:35 AM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
boleh jerrr.

This post has been edited by mimieukk: Sep 19 2013, 11:38 AM
mimieukk
post Sep 19 2013, 11:41 AM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
QUOTE(sikhwan3 @ Sep 19 2013, 10:41 AM)
yeee haaaa....appointment ambil kunci 25 september ni....

rclxm9.gif  rclxm9.gif  rclxm9.gif  rclxm9.gif
*
waaa.bagus ahhh...check defect tul2.hahah.i nyerr defect mozek dah settle.just tingkap jerr
mimieukk
post Sep 19 2013, 11:42 AM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
QUOTE(sikhwan3 @ Sep 19 2013, 11:01 AM)
cadia....umah mengadap padang permainan...dekat2 ngan stesen TNB  smile.gif  smile.gif
*
ooo situ..syok lahhh dpn taman....
sikhwan3
post Sep 19 2013, 11:51 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(mimieukk @ Sep 19 2013, 11:41 AM)
waaa.bagus ahhh...check defect tul2.hahah.i nyerr defect mozek dah settle.just tingkap jerr
*
orait sis... x sabar pulak rasa hati ni...haha tongue.gif tongue.gif
mimieukk
post Sep 19 2013, 11:54 AM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
QUOTE(sikhwan3 @ Sep 19 2013, 11:51 AM)
orait sis... x sabar pulak rasa hati ni...haha  tongue.gif  tongue.gif
*
masa u ambil kunci mesti ada kontractor cina dtg offer u ambil pakej kat dia.diaorg mmg duk situ jerr tunggu owner ambil kunci
sikhwan3
post Sep 19 2013, 12:00 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(mimieukk @ Sep 19 2013, 11:54 AM)
masa u ambil kunci mesti ada kontractor cina dtg offer u ambil pakej kat dia.diaorg mmg duk situ jerr tunggu owner ambil kunci
*
TFR ke??mmg dorang selalu dah offer...masa g tgk2 rumah dulu pun dorang ade... tongue.gif tongue.gif
mimieukk
post Sep 19 2013, 12:13 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
Yeap.but i dont like diaorg nyerr attitude.
B4 i dpt kunci melambak msg i dpt diaorg offer.like pushing ppl ambil ngan diaorg.
PiGGy ^(oo)^
post Sep 19 2013, 12:13 PM

Getting Started
**
Junior Member
63 posts

Joined: Oct 2011
Anyone wanna build a duplex in room 2? height 17ft....
mimieukk
post Sep 20 2013, 03:41 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
Clear pic after pecahkan dinding n letak roof.


Attached thumbnail(s)
Attached Image Attached Image Attached Image
azmirsafuan
post Sep 20 2013, 04:37 PM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
QUOTE(mimieukk @ Sep 20 2013, 03:41 PM)
Clear pic after pecahkan dinding n letak roof.
*
wahh....dah pecah..
no brape rumah?
esok nk g sana tgk umah n sambil2 tu leh la site visit umah u...
tongue.gif

mimieukk
post Sep 20 2013, 07:56 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
QUOTE(azmirsafuan @ Sep 20 2013, 04:37 PM)
wahh....dah pecah..
no brape rumah?
esok nk g sana tgk umah n sambil2 tu leh la site visit umah u...
tongue.gif
*

Mai2.67
hulk11
post Sep 21 2013, 01:02 PM

New Member
*
Junior Member
6 posts

Joined: Sep 2013
hi newbie here..
im also cadia..berapa kaki ye ukuran dapur kalau nak buat KC..
kunci x dapat lgi.huhu
mimieukk
post Sep 21 2013, 03:29 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
QUOTE(hulk11 @ Sep 21 2013, 01:02 PM)
hi newbie here..
im also cadia..berapa kaki ye ukuran dapur kalau nak buat KC..
kunci x dapat lgi.huhu
*
I pun x tahu sbb x buat.
ericlaiys
post Sep 21 2013, 05:45 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(PiGGy ^(oo)^ @ Sep 19 2013, 12:13 PM)
Anyone wanna build a duplex in room 2? height 17ft....
*
what is duplex?
ericlaiys
post Sep 21 2013, 05:47 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Sep 19 2013, 10:41 AM)
yeee haaaa....appointment ambil kunci 25 september ni....

rclxm9.gif  rclxm9.gif  rclxm9.gif  rclxm9.gif
*
initially they told me 25 sept is also available, but i just take leave on 27 so i can do more checking (sat & sun) with the help of contractor. Remember to list down the defect after your inspection

This post has been edited by ericlaiys: Sep 21 2013, 05:49 PM
ericlaiys
post Sep 21 2013, 05:50 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(hulk11 @ Sep 21 2013, 01:02 PM)
hi newbie here..
im also cadia..berapa kaki ye ukuran dapur kalau nak buat KC..
kunci x dapat lgi.huhu
*
depend your kitchen on the left/right of the yard. Anyway, you can measure when get the key. Besides, the measurement will not correct as well if you plan to put washing machine/fridge there. Like my case, i put fridge at kitchen, then yard put washing machine.

This post has been edited by ericlaiys: Sep 21 2013, 05:51 PM
thumbellyna
post Sep 21 2013, 10:23 PM

New Member
*
Junior Member
6 posts

Joined: Sep 2013
reno need mpk permit x?masa collect key 101 person kata klu jiran x complain xpe xyah permit so confuse tkut wat reno kn mpk dtg..hbis
ericlaiys
post Sep 21 2013, 11:13 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(thumbellyna @ Sep 21 2013, 10:23 PM)
reno need mpk permit x?masa collect key 101 person kata klu jiran x complain xpe xyah permit so confuse tkut wat reno kn mpk dtg..hbis
*
here is the info that i've gathered:

a) if you do not modify the building structure, then you do not need to get permit. If inside the house (modify structure), no one will know. then ok. But outside can see structure change such as hacking/beam, etc, then you need to apply permit
b) grill - no need permit.

It is not necessary that neighbour complain but if MPK come, round and found that you modify the structure, then they will issue a fine.

I did ask my contractor about this and they confirm that statement above is correct. That's why previously i planned to covered the whole yard but then change plan to just install grill to cover up my yard.

This post has been edited by ericlaiys: Sep 21 2013, 11:14 PM
azmirsafuan
post Sep 23 2013, 07:40 AM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
QUOTE(ericlaiys @ Sep 21 2013, 05:50 PM)
depend your kitchen on the left/right of the yard. Anyway, you can measure when get the key. Besides, the measurement will not correct as well if you plan to put washing machine/fridge there. Like my case, i put fridge at kitchen, then yard put washing machine.
*
if you put your fridge at the kitechen? doesnt it makes your kitchen smaller?
ke ada plan nk pecahkan bilik or something?
mind to share..
smlm g sana..tgk rumah yg TFR wat showhouse tu..overall design mcm ok..simple n nice..
sikhwan3
post Sep 23 2013, 08:04 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(azmirsafuan @ Sep 23 2013, 07:40 AM)
if you put your fridge at the kitechen? doesnt it makes your kitchen smaller?
ke ada plan nk pecahkan bilik or something?
mind to share..
smlm g sana..tgk rumah yg TFR wat showhouse tu..overall design mcm ok..simple n nice..
*
show house TFR kat bandar puteri tu ke bro?
PiGGy ^(oo)^
post Sep 23 2013, 09:00 AM

Getting Started
**
Junior Member
63 posts

Joined: Oct 2011
QUOTE(ericlaiys @ Sep 21 2013, 05:45 PM)
what is duplex?
*
build a 2nd floor in room 2...still sourcing for quotation. Planning to use security door (frt + back). No plan extend backyard as it cost a fortune!
azmirsafuan
post Sep 23 2013, 10:01 AM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
QUOTE(sikhwan3 @ Sep 23 2013, 08:04 AM)
show house TFR kat bandar puteri tu ke bro?
*
tak..kt area umah kita gak la...diorang sewa or pinjam rumah org yg dah reno ngan diorang jadikan showhouse utk cadia/dura..sapa2 nk tgk camne design leh la g tgk..
sikhwan3
post Sep 23 2013, 11:48 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(azmirsafuan @ Sep 23 2013, 10:01 AM)
tak..kt area umah kita gak la...diorang sewa or pinjam rumah org yg dah reno ngan diorang jadikan showhouse utk cadia/dura..sapa2 nk tgk camne design leh la g tgk..
*
owh ye ke..nanti hari rabu nak gi tgk laa...tq for info smile.gif smile.gif
mimieukk
post Sep 23 2013, 02:10 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
QUOTE(PiGGy ^(oo)^ @ Sep 23 2013, 09:00 AM)
build a 2nd floor in room 2...still sourcing for quotation. Planning to use security door (frt + back). No plan extend backyard as it cost a fortune!
*
Buat 2 bilik kan.
mimieukk
post Sep 23 2013, 02:11 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
When u all move in.
ericlaiys
post Sep 23 2013, 02:16 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(azmirsafuan @ Sep 23 2013, 07:40 AM)
if you put your fridge at the kitechen? doesnt it makes your kitchen smaller?
ke ada plan nk pecahkan bilik or something?
mind to share..
smlm g sana..tgk rumah yg TFR wat showhouse tu..overall design mcm ok..simple n nice..
*
lol...initially i plan to put fridge and washing machine in the same room. After think twice then plan changed. So just fridge. My kitchen is on right (if you from main door). So my fridge just put near to windows. Fit well (just block a bit of windows). For washing machine, i put at yard so wont cramp the kitchen.

I did not break the wall . All maintain the same as i want to claim warranty if any issue. Just convert my yard to wet kitchen. Therefore i seal the entire yard with grill. The grill will follow the pattern as entire house. So look nicer and roof i put skylight. Full cement at yard is very expensive as they need to put extra beam. Besides, need permit and architect design. So mafan, then decide to use grill and skylight instead.

I follow the same design as TFR kitchen. Just that i remove the cooking hob and put extra wall cabinet (add rm600 for it).
ericlaiys
post Sep 23 2013, 02:18 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mimieukk @ Sep 23 2013, 02:11 PM)
When u all move in.
*
when defect and renovation complete. I expect
a) defect - 1 month
b) reno - 1 month
so if nothing wrong should be Dec 2013.

Still waiting for telekom reply on UNIFI. Without fixed Internet can die faster

This post has been edited by ericlaiys: Sep 23 2013, 02:47 PM
ericlaiys
post Sep 23 2013, 02:23 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(PiGGy ^(oo)^ @ Sep 23 2013, 09:00 AM)
build a 2nd floor in room 2...still sourcing for quotation. Planning to use security door (frt + back). No plan extend backyard as it cost a fortune!
*
any design/ picture? Still wonder how to put fan since the ceiling is so high.

Security door cost a lot. I fully utilize it by convert yard to wet kitchen. Wet kitchen to dry kitchen. Heard a lot of experience people say " cooking dont put inside the house as very oily and smoke. Even got hob also pointless.
ericlaiys
post Sep 23 2013, 02:23 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


anyone change plumbing (bathroom) to use direct pipe? heard that both bathroom is using water tank.
PiGGy ^(oo)^
post Sep 23 2013, 02:36 PM

Getting Started
**
Junior Member
63 posts

Joined: Oct 2011
QUOTE(mimieukk @ Sep 23 2013, 02:10 PM)
Buat 2 bilik kan.
*
Buat 2 tingkat donk...dlm bilik 2....atas tido, bawah tv goyang kaki...
PiGGy ^(oo)^
post Sep 23 2013, 02:40 PM

Getting Started
**
Junior Member
63 posts

Joined: Oct 2011
QUOTE(ericlaiys @ Sep 23 2013, 02:23 PM)
any design/ picture? Still wonder how to put fan since the ceiling is so high.

Security door cost a lot. I fully utilize it by convert yard to wet kitchen. Wet kitchen to dry kitchen. Heard a lot of  experience people say " cooking dont put inside the house as very oily and smoke. Even got hob also pointless.
*
I plan hack room 4 extended become kitchen, will install sliding glass door between dining area & kitchen. Can block oil & smell lor. Duplex me still waiting for quotation lor....design i follow Taiwan style. M thinking since the ceiling so high, no do duplex wasted lor.
ericlaiys
post Sep 23 2013, 02:53 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(PiGGy ^(oo)^ @ Sep 23 2013, 02:40 PM)
I plan hack room 4 extended become kitchen, will install sliding glass door between dining area & kitchen. Can block oil & smell lor. Duplex me still waiting for quotation lor....design i follow Taiwan style. M thinking since the ceiling so high, no do duplex wasted lor.
*
wow...too bad. I need the extra room as store room. My dry kitchen and yard will put sliding door as well. (recommend by my contractor).
Duplex should be very expensive . But would like to know as well. Keep us updated as well. If price ok, then i will convert as well
azmirsafuan
post Sep 23 2013, 04:28 PM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
QUOTE(ericlaiys @ Sep 23 2013, 02:23 PM)
anyone change plumbing (bathroom) to use direct pipe? heard that both bathroom is using water tank.
*
me also thought the same idea coz some said the pressure kdg2 slow klu guna from tank..
brape quotayion to change that system ek?
azmirsafuan
post Sep 23 2013, 04:29 PM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
alhamdulillah...

dah boleh amik kunci...

c u later guys...
ericlaiys
post Sep 23 2013, 06:12 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(azmirsafuan @ Sep 23 2013, 04:28 PM)
me also thought the same idea coz some said the pressure kdg2 slow klu guna from tank..
brape quotayion to change that system ek?
*
dunno. will discuss with contractor this friday when collect my key. Hopefully no need to damage the tiles. Dura unit is full tiles @ bathroom.
Will let you know later
azmirsafuan
post Sep 24 2013, 04:32 PM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
QUOTE(ericlaiys @ Sep 23 2013, 06:12 PM)
dunno. will discuss with contractor this friday when collect my key. Hopefully no need to damage the tiles. Dura unit is full tiles @ bathroom.
Will let you know later
*
keep updating bro..
i'll collecting my keys on 3 Oct..
ericlaiys
post Sep 25 2013, 03:30 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Sep 19 2013, 10:41 AM)
yeee haaaa....appointment ambil kunci 25 september ni....

rclxm9.gif  rclxm9.gif  rclxm9.gif  rclxm9.gif
*
so how? Too many defect till speechless .
azmirsafuan
post Sep 25 2013, 03:31 PM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
QUOTE(ericlaiys @ Sep 25 2013, 03:30 PM)
so how? Too many defect till speechless .
*
ur house got so many defect ke?

what defect u can observed bro?

major? minor?
TScrazeeclan
post Sep 25 2013, 05:35 PM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



Is common to have defect. Anyway just bought another properties from IOI. When to see Felicia showroom. Not bad for that price and bought it for future investment. FYI im Cassia owner....
sikhwan3
post Sep 25 2013, 05:51 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(ericlaiys @ Sep 25 2013, 03:30 PM)
so how? Too many defect till speechless .
*
No laaa..hahaa...just got back ...my opppoinment at 1pm...

So far no major defect..only 1 defect ... 2 skirting tiles missing at car porch...thats all..

This saturday i will continue checking my house again...

biggrin.gif biggrin.gif
sikhwan3
post Sep 25 2013, 05:53 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(azmirsafuan @ Sep 25 2013, 03:31 PM)
ur house got so many defect ke?

what defect u can observed bro?

major? minor?
*
So far minor defect jer bro...x penah jumpe lagi yg major2...
ericlaiys
post Sep 25 2013, 08:58 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Sep 25 2013, 05:53 PM)
So far minor defect jer bro...x penah jumpe lagi yg major2...
*
According to my contractor, they said got minor defect. But not so major compare to Double storey house.
ericlaiys
post Sep 25 2013, 08:59 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(crazeeclan @ Sep 25 2013, 05:35 PM)
Is common to have defect. Anyway just bought another properties from IOI. When to see Felicia showroom. Not bad for that price and bought it for future investment. FYI im Cassia owner....
*
Double welcome....it is 20 X 65 and around 240+ (if i'm not mistaken)
sikhwan3
post Sep 25 2013, 09:32 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


Anyone here know how much cost for aircond installation...?plan to install aircond at living hall and master bedroom...TFR quote me rm1.6k only for wiring and piping....emmmmm...is it quite expensive right?
ericlaiys
post Sep 25 2013, 09:51 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Sep 25 2013, 09:32 PM)
Anyone here know how much cost for aircond installation...?plan to install aircond  at living hall and master bedroom...TFR quote me rm1.6k only for wiring and piping....emmmmm...is it quite expensive right?
*
it is conceal. that's why it is expensive. I saw they do the same for one of the house at Dura. They hack and put the wiring piping inside the wall. Then seal it with cement.
May be that's why it is expensive. Then the compressor is put outside (near to water tank).

Did you engage them for your house renovation as well? How about water heater & other plug point?

Here is some people feedback about conceal and air con installation discussion:- https://forum.lowyat.net/topic/1832083
(2 or 3 year discussion. The price already hit till RM1800 for 6 pipe) Calculation based on feet

This post has been edited by ericlaiys: Sep 26 2013, 12:06 AM
h4dRi
post Sep 26 2013, 12:15 AM

Getting Started
**
Junior Member
97 posts

Joined: Dec 2009
How much felicia unit will cost?
sikhwan3
post Sep 26 2013, 08:11 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(ericlaiys @ Sep 25 2013, 09:51 PM)
it is conceal. that's why it is expensive. I saw they do the same for one of the house at Dura. They hack and put the wiring piping inside the wall. Then seal it with cement.
May be that's why it is expensive. Then the compressor is put outside (near to water tank).

Did you engage them for your house renovation as well? How about water heater & other plug point?

Here is some people feedback about conceal and air con installation discussion:- https://forum.lowyat.net/topic/1832083
(2 or 3 year discussion. The price already hit till RM1800 for 6 pipe) Calculation based on feet
*
yes...i just take the promotional package from them..i dont have plan to use water heater or add extra plug point at the moment..


owhhh i see...if 1.6k for aircond wiring & piping is reasonable maybe i can consider their offer again before they start reno my ceiling....
azmirsafuan
post Sep 26 2013, 08:49 AM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
QUOTE(sikhwan3 @ Sep 26 2013, 08:11 AM)
yes...i just take the promotional package from them..i dont have plan to use water heater or add extra plug point at the moment..
owhhh i see...if 1.6k for aircond wiring & piping is reasonable maybe i can consider their offer again before they start reno my ceiling....
*
are conceal mean the hack to our wall and plant the wire and all into it? so look not messy?

if we do normal piping i think the cost is more cheaper rite?

RM1.6 k quite a money i guess..


TScrazeeclan
post Sep 26 2013, 09:18 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(ericlaiys @ Sep 25 2013, 08:59 PM)
Double welcome....it is 20 X 65 and around 240+ (if i'm not mistaken)
*
yes...is 20 x 65....RM250,800 to be exact....hope that it will turn out to be a good investment for me....
TScrazeeclan
post Sep 26 2013, 09:20 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(sikhwan3 @ Sep 25 2013, 09:32 PM)
Anyone here know how much cost for aircond installation...?plan to install aircond  at living hall and master bedroom...TFR quote me rm1.6k only for wiring and piping....emmmmm...is it quite expensive right?
*
u may try to get quoter from other contractor... standard as i know is around RM180 to RM 200 for conceal piping and wiring..
TScrazeeclan
post Sep 26 2013, 09:21 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(h4dRi @ Sep 26 2013, 12:15 AM)
How much felicia unit will cost?
*
RM250,800 for intermidiate lot. Corner lot with additional 5ft land is RM280,800 but fully sold out.
azmirsafuan
post Sep 26 2013, 09:28 AM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
QUOTE(crazeeclan @ Sep 26 2013, 09:20 AM)
u may try to get quoter from other contractor... standard as i know is around RM180 to RM 200 for conceal piping and wiring..
*
rm200 for conceal? just now somebody said TFR quote rm 1.8k for conceal?
huhuhu...very different gap indeed..
sikhwan3
post Sep 26 2013, 09:32 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(azmirsafuan @ Sep 26 2013, 08:49 AM)
are conceal mean the hack to our wall and plant the wire and all into it? so look not messy?

if we do normal piping i think the cost is more cheaper rite?

RM1.6 k quite a money i guess..
*
yes...agreed....i plan nk pasang aircond...even pay 1.6k...aircond compressor for living hall letak kat tepi water tank (its ok)...tapi rasa x best laa letak compressor utk master bedroom kat car porch..ingat nak letak kat dinding yard belakang...ade sape2 penah buat ke?
sikhwan3
post Sep 26 2013, 09:33 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(crazeeclan @ Sep 26 2013, 09:20 AM)
u may try to get quoter from other contractor... standard as i know is around RM180 to RM 200 for conceal piping and wiring..
*
thanx bos..i'll try... biggrin.gif
h4dRi
post Sep 26 2013, 11:06 AM

Getting Started
**
Junior Member
97 posts

Joined: Dec 2009
QUOTE(crazeeclan @ Sep 26 2013, 09:21 AM)
RM250,800 for intermidiate lot. Corner lot with additional 5ft land is RM280,800 but fully sold out.
*
Yes I just called them, only intermidiate lot still available, going to have a look its surrounding area before decide to buy
imagoodboy
post Sep 26 2013, 02:10 PM

New Member
*
Newbie
2 posts

Joined: Aug 2009


QUOTE(ericlaiys @ Sep 23 2013, 02:53 PM)
wow...too bad. I need the extra room as store room. My dry kitchen and yard will put sliding door as well. (recommend by my contractor).
Duplex should be very expensive . But would like to know as well. Keep us updated as well. If price ok, then i will convert as well
*
Sliding door on kitchen? are you engaged to TFR? they told me no sliding door
imagoodboy
post Sep 26 2013, 02:11 PM

New Member
*
Newbie
2 posts

Joined: Aug 2009


QUOTE(mimieukk @ Sep 20 2013, 03:41 PM)
Clear pic after pecahkan dinding n letak roof.
*
nice? mind to share how much to hack the backyard and get it extend?
suadrifhailaways
post Sep 26 2013, 02:39 PM

New Member
*
Junior Member
35 posts

Joined: Sep 2013
i just received my keys for dura last Monday..lots of defect(I think it minor), still checking..not informing them yet..one day not enough to observe it all. I check there is some leaking at my ceiling..found some water marks..anybody face the same?4th room has no fan hook..manhole has hole on it..hahahahahaha..why does it made by plastics not iron/steel?
ericlaiys
post Sep 26 2013, 02:55 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(imagoodboy @ Sep 26 2013, 02:10 PM)
Sliding door on kitchen? are you engaged to TFR? they told me no sliding door
*
Got. Initially it is the door from developer. So that door maintain. Grill add as sliding door.
Yup- i'm engaged TFR. Who is your main contact person

This post has been edited by ericlaiys: Sep 26 2013, 05:23 PM
ericlaiys
post Sep 26 2013, 02:57 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(suadrifhailaways @ Sep 26 2013, 02:39 PM)
i just received my keys for dura last Monday..lots of defect(I think it minor), still checking..not informing them yet..one day not enough to observe it all. I check there is some leaking at my ceiling..found some water marks..anybody face the same?4th room has no fan hook..manhole has hole on it..hahahahahaha..why does it made by plastics not iron/steel?
*
I will let u know tomorrow. Currently dunno yet. How many and where each fan hook that you notice?
By the way, is water meter in for dura?

This post has been edited by ericlaiys: Sep 26 2013, 08:26 PM
ericlaiys
post Sep 26 2013, 02:59 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Sep 26 2013, 09:33 AM)
thanx bos..i'll try... biggrin.gif
*
Most quote 180-200 for just 10 feet. Extra is different charges. Still undecided on how ?
TScrazeeclan
post Sep 26 2013, 03:16 PM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(azmirsafuan @ Sep 26 2013, 09:28 AM)
rm200 for conceal? just now somebody said TFR quote rm 1.8k for conceal?
huhuhu...very different gap indeed..
*
i did mine previously by my contractor...i let them reno my whole hse including wiring job...they charge me RM160 only conceal pipe and power wiring for aircond...but my length is short....the longest is also around 6ft only..mostly is back to back or 3ft long....even my water heater wiring is also RM160 and all the price inclusive of 20A switch.
sikhwan3
post Sep 26 2013, 03:51 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(ericlaiys @ Sep 26 2013, 02:59 PM)
Most quote 180-200 for just 10 feet. Extra is different charges. Still undecided on how ?
*
if 10ft is around rm180-200 ...so let say 30 ft should be around rm600 right?i dont think the pipe & wiring will be longer than that. hmm.gif hmm.gif hmm.gif

but why up to 1.6k...??emmmm blink.gif blink.gif
ericlaiys
post Sep 26 2013, 05:21 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


anyone submitted defect list and how long IOI need to take for fixing the defect?
azmirsafuan
post Sep 27 2013, 07:49 AM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
QUOTE(crazeeclan @ Sep 26 2013, 03:16 PM)
i did mine previously by my contractor...i let them reno my whole hse including wiring job...they charge me RM160 only conceal pipe and power wiring for aircond...but my length is short....the longest is also around 6ft only..mostly is back to back or 3ft long....even my water heater wiring is also RM160 and all the price inclusive of 20A switch.
*
what is ur contractor contact no?
maybe need some 2 or 3 quotation besides TFR..
currently lots of people from cadia/dura engaged with TFR..
i wonder if they got so many workers to complete all the renovation for those people in time..
in worst case they did cincai2 jeee as long they complete the job.. hmm.gif

i just want to do minor reno (concrete table top + kitchen cabinet + plaster ceiling je).. drool.gif icon_question.gif
sikhwan3
post Sep 27 2013, 02:38 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(ericlaiys @ Sep 26 2013, 05:21 PM)
anyone submitted defect list and how long IOI need to take for fixing the defect?
*
bro..so how you house?? lots of defect?
suadrifhailaways
post Sep 27 2013, 04:46 PM

New Member
*
Junior Member
35 posts

Joined: Sep 2013
QUOTE(ericlaiys @ Sep 26 2013, 02:57 PM)
I will let u know tomorrow. Currently dunno yet. How many and where each fan hook that you notice?
By the way, is water meter in for dura?
*
yes, water meter are in for dura..
electric main fuse oso being given by the time you take the keys.

FYI, my dura is the end row of dura house which next to ember..


suadrifhailaways
post Sep 27 2013, 04:50 PM

New Member
*
Junior Member
35 posts

Joined: Sep 2013
QUOTE(ericlaiys @ Sep 26 2013, 05:21 PM)
anyone submitted defect list and how long IOI need to take for fixing the defect?
*
me not yet..still pending for full checking..maybe dis weekend will finish do the checking..as for now..i think the defect list maybe more than 20 items..so lots of defect..i could not differentiate whether it is minor or major.. drool.gif

siapa yang dah hantar?response time deorang lama x?
want to know about it too..

who got others quotation for full house grill(door& windows) except TFR? icon_question.gif

This post has been edited by suadrifhailaways: Sep 27 2013, 04:52 PM
PiGGy ^(oo)^
post Sep 27 2013, 05:11 PM

Getting Started
**
Junior Member
63 posts

Joined: Oct 2011
QUOTE(ericlaiys @ Sep 26 2013, 05:21 PM)
anyone submitted defect list and how long IOI need to take for fixing the defect?
*
just get my defet done this monday, its take appox 2 weeks. So far acceptable la....
PiGGy ^(oo)^
post Sep 27 2013, 05:16 PM

Getting Started
**
Junior Member
63 posts

Joined: Oct 2011
strongly suggest to compare few quotation before start renovation. For me TFR price quite costly. My parents house reno 2 yrs ago, i understand material all up up but as i compare back the quotation he gave...i just can said WOW....i'm getting my previous contractor to quote the same thing, lets see what's the diff....
ericlaiys
post Sep 27 2013, 09:19 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Sep 27 2013, 02:38 PM)
bro..so how you house?? lots of defect?
*
I've spent the whole day from 10.00 - 6.30 pm to check my house from A-Z. Too many defect till I don't believe it. The worse is outside which got a lot of cracking. I even check defect on my post box and crawl inside the dustbin. Surprise to found crack and poor workmanship.

My defect list is already 6 pages with 130+ picture.
Tomorrow going to final check again.

This post has been edited by ericlaiys: Sep 27 2013, 10:28 PM
ericlaiys
post Sep 27 2013, 09:22 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(suadrifhailaways @ Sep 27 2013, 04:46 PM)
yes, water meter are in for dura..
electric main fuse oso being given by the time you take the keys.

FYI, my dura is the end row of dura house which next to ember..
*
Yup got mine. Today I just tested water to tank. So far it is working fine. Just need to wait 1-2 hours for the water to fill up before it came out from the pipe.

All pipe get water from tank. The only direct is outside & Kitchen only.

Tomorrow going to check the entire plug point.

Don't really 100% trust them after today inspection. Tomorrow going to be another days for full inspection

This post has been edited by ericlaiys: Sep 27 2013, 11:08 PM
ericlaiys
post Sep 27 2013, 09:23 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(PiGGy ^(oo)^ @ Sep 27 2013, 05:11 PM)
just get my defet done this monday, its take appox 2 weeks. So far acceptable la....
*
Yup. I also receive the same feedback. Let see how long mine going to take. (last check tomorrow before submission)
ericlaiys
post Sep 27 2013, 09:34 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(PiGGy ^(oo)^ @ Sep 27 2013, 05:16 PM)
strongly suggest to compare few quotation before start renovation. For me TFR price quite costly. My parents house reno 2 yrs ago, i understand material all up up but as i compare back the quotation he gave...i just can said WOW....i'm getting my previous contractor to quote the same thing, lets see what's the diff....
*
Well, I did compare with other renovation company before meet TFR. I end up taking TFR as not much different compare to other. Some contractor offered by low yat forum.

Here is my finding
a) TFR - grill is cheap. (2K). Other contractor quote me -3K. Anyway, I upgraded mine to better quality after see the end result from the house that they bring me
b) Kitchen cabinet. Everyone consider TFR expensive. I also think the same after see TFR promo price. Go look around this fair, that fair. Compare with them, more the less the same.
I even tried aluminum kitchen cabinet - which cost 10K (smaller size - due to I put fridge and washing together). After see TFR, the price not that expensive compare to others.
c) Convert yard to wet kitchen - extra renovation. (Not sure expensive or not but I choose to do full grill rather than cement & brick as too expensive.

Well, the above is my experience for the pass 6 month to look for quotation. TFR is the last contractor that I see. End up taking from them as least it is reliable. Found out a lot of people face problem with other contractor

p/s:- today they came and help me do inspection and told me which is the major defect. I never realize till them told me and I question back to developer. (Developer agreed is the major defect and ask me to jot down in defect form)

Hopefully I don't make the wrong choice on choosing them.

smile.gif


ericlaiys
post Sep 28 2013, 02:24 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Today final inspection, found 3 plug point do not have electricity power.
Since today got a lot of times (been there since 9am), go another round of defect check and wash kitchen floor, bath room 1 & 2 floor. (the only place with no defect)

Lastly ,submitted my defect list to IOI. According to them, need to wait 1 month to rectify but I can check back the status in another 2 week.

Contractor urgently want to fix grill and kitchen cabinet but I told them to hold on as too many defect including tiles, wall, door, windows, floor, ceiling, etc. (too many till out of count)

This post has been edited by ericlaiys: Sep 28 2013, 02:27 PM
sikhwan3
post Sep 28 2013, 02:43 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


My cadia still dont have syabas meter....just got back...haiya...banyak tension maaa...
ericlaiys
post Sep 28 2013, 05:46 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Sep 28 2013, 02:43 PM)
My cadia still dont have syabas meter....just got back...haiya...banyak tension maaa...
*
huh? our dura already installed. Your meter got stolen?
sikhwan3
post Sep 28 2013, 07:18 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(ericlaiys @ Sep 28 2013, 05:46 PM)
huh? our dura already installed. Your meter got stolen?
*
Not isntall yet.....jalan 4L infront padang permainan..i dont know why so late to install....all the hauses in this lane not yett install


This post has been edited by sikhwan3: Sep 28 2013, 07:19 PM
senapang
post Sep 28 2013, 09:47 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
QUOTE(sikhwan3 @ Sep 28 2013, 07:18 PM)
Not isntall yet.....jalan 4L infront padang permainan..i dont know why so late  to install....all the hauses in this lane not yett install
*
Owh yeke? When actually they planning to install it? How bout tnb? Hv power already? Street lighting functioning at nite?
sikhwan3
post Sep 29 2013, 10:54 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(senapang @ Sep 28 2013, 09:47 PM)
Owh yeke? When actually they planning to install it? How bout tnb? Hv power already? Street lighting functioning at nite?
*
Suppose mmg dh pasang meter tu...tapi syabas lorong lain dulu kot...minggu ni maybe setat pasang area sini...tnb meter no problem...street light x perasan..sebab x penah g sana waktu mlm...
ericlaiys
post Sep 29 2013, 09:04 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(senapang @ Sep 28 2013, 09:47 PM)
Owh yeke? When actually they planning to install it? How bout tnb? Hv power already? Street lighting functioning at nite?
*
I just came back from there. purposely wait till 7+. My side got street light functioning
senapang
post Sep 30 2013, 08:19 AM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
QUOTE(ericlaiys @ Sep 29 2013, 09:04 PM)
I just came back from there. purposely wait till 7+. My side got street light functioning
*
How much top fellowship quoted u for grill foe whole unit bro?

azmirsafuan
post Sep 30 2013, 08:25 AM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
any contractor for grill??
mimieukk
post Sep 30 2013, 12:22 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
Siap sudah


Attached thumbnail(s)
Attached Image
denesh87
post Sep 30 2013, 12:32 PM

New Member
*
Junior Member
41 posts

Joined: Apr 2010


QUOTE(zery @ Jun 24 2013, 07:55 AM)
I bought one last Saturday.. corner lot RM328k (bumi) non bumi RM341k
*
for real.. felicial is single storey terrace rite.. why up to 300k.. it's 250k only
azmirsafuan
post Sep 30 2013, 01:05 PM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
QUOTE(mimieukk @ Sep 30 2013, 12:22 PM)
Siap sudah
*
cepat..wat ngan TFR ke?

denesh87
post Sep 30 2013, 01:34 PM

New Member
*
Junior Member
41 posts

Joined: Apr 2010


Just had a visit to felicia show unit yesterday. What do you guys think.. Is it reasonable to pay 250k for leasehold property.. The tenure is 88 years only.. If it's freehold I'll book straight away.. Anymore house that i can get for this price range around this area.. Appreciate for your feedback guys..
sikhwan3
post Sep 30 2013, 02:53 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(mimieukk @ Sep 30 2013, 12:22 PM)
Siap sudah
*
nice..cantik table top.. drool.gif drool.gif
ericlaiys
post Sep 30 2013, 03:24 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(senapang @ Sep 30 2013, 08:19 AM)
How much top fellowship quoted u for grill foe whole unit bro?
*
Mine is 4K. Previous 2K (low quality). Change quality
ericlaiys
post Sep 30 2013, 03:24 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mimieukk @ Sep 30 2013, 12:22 PM)
Siap sudah
*
Wow...your toilet look more wider now.
ericlaiys
post Sep 30 2013, 03:27 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(denesh87 @ Sep 30 2013, 01:34 PM)
Just had a visit to felicia show unit yesterday. What do you guys think.. Is it reasonable to pay 250k for leasehold property.. The tenure is 88 years only.. If it's freehold I'll book straight away.. Anymore house that i can get for this price range around this area.. Appreciate for your feedback guys..
*
Dura (4th Phase) cost RM268K+ (the most expensive intermediate unit in entire Bandar Putera 2 phase, i think). Everywhere also leasehold and limited freehold. Freehold wont get 250K. Not sure but i think someone in previous post say got. Probably you can reverse and check previous post.
mimieukk
post Sep 30 2013, 03:32 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
QUOTE(azmirsafuan @ Sep 30 2013, 01:05 PM)
cepat..wat ngan TFR ke?
*
Nope other contractor
mimieukk
post Sep 30 2013, 03:35 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
QUOTE(sikhwan3 @ Sep 30 2013, 02:53 PM)
nice..cantik table top.. drool.gif  drool.gif
*
Hehee.tq
sikhwan3
post Sep 30 2013, 03:39 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(mimieukk @ Sep 30 2013, 03:35 PM)
Hehee.tq
*
curve kat tepi mmg smart
mimieukk
post Sep 30 2013, 03:46 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
QUOTE(sikhwan3 @ Sep 30 2013, 03:39 PM)
curve kat tepi mmg smart
*
Yeap.suggest by contractor
azmirsafuan
post Sep 30 2013, 04:00 PM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
QUOTE(mimieukk @ Sep 30 2013, 03:32 PM)
Nope other contractor
*
leh bg no contact ke? bape damaged utk semua tu?
mimieukk
post Sep 30 2013, 04:39 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
Since 3rd bilik xda tingkap.after i extend.they put batu ni.nice right.


Attached thumbnail(s)
Attached Image
sikhwan3
post Sep 30 2013, 05:25 PM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(mimieukk @ Sep 30 2013, 04:39 PM)
Since 3rd bilik xda tingkap.after i extend.they put batu ni.nice right.
*
tiba2 rasa mcm nak tiru pulak design reno ni..haha

thumbup.gif thumbup.gif
mimieukk
post Sep 30 2013, 06:54 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
Hahahahahaj.
ericlaiys
post Sep 30 2013, 08:24 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mimieukk @ Sep 30 2013, 04:39 PM)
Since 3rd bilik xda tingkap.after i extend.they put batu ni.nice right.
*
Now 2 room no windows? No ventilation.
senapang
post Sep 30 2013, 10:30 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
Eh ericlaiys, they quoted u 4k including ur yard rite?
What kind of materials hv u upgraded?

Anyone knows how much for basic door n windows grill?
mimieukk
post Sep 30 2013, 10:30 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
QUOTE(ericlaiys @ Sep 30 2013, 08:24 PM)
Now 2 room no windows? No ventilation.
*
i extend the bathroom until yard.the window i tutup.
mimieukk
post Sep 30 2013, 10:35 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
QUOTE(senapang @ Sep 30 2013, 10:30 PM)
Eh ericlaiys, they quoted u 4k including ur yard rite?
What kind of materials hv u upgraded?

Anyone knows how much for basic door n windows grill?
*
Dlm.2k++ but u rumah tepi kan.maybe lg.mahal.sebb ada pintu tepi
senapang
post Sep 30 2013, 10:43 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
Owh yeke..thanks for info mimieukk.. smile.gif
ericlaiys
post Sep 30 2013, 10:57 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(senapang @ Sep 30 2013, 10:30 PM)
Eh ericlaiys, they quoted u 4k including ur yard rite?
What kind of materials hv u upgraded?

Anyone knows how much for basic door n windows grill?
*
Nope. 4K for whole house. Different charges for yard grill (full coverage like "sangkar burung" and Polycarbonate Skylight‎. So my yard grill follow the same design as my whole house. He said my kitchen door is sliding grill so easy to move in/out to yard rather than normal grill open which blocked.
My kitchen door and room 3 has grill as well in case some one manage to break in from yard. Yard door full covered till almost neck so i can see easily to outside

Basic cost around 2K. Can't recall but according them is called copper brown. The best about this is thickness and their side dont have any no holes. So not easy to "kopek". Basic one, got holes and easy to kopek.

They bring me to another house (which has just completed renovated at bandar puteri which has installed with this grill. The cheap grill house is next to it. The house located at round about before we turn to bandar puteri.
I heard someone upgraded to security door and replace whole main glass door: cost 7K

This post has been edited by ericlaiys: Sep 30 2013, 11:09 PM
mimieukk
post Sep 30 2013, 11:31 PM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
QUOTE(senapang @ Sep 30 2013, 10:30 PM)
Eh ericlaiys, they quoted u 4k including ur yard rite?
What kind of materials hv u upgraded?

Anyone knows how much for basic door n windows grill?
*
Dlm.2k++ but u rumah tepi kan.maybe lg.mahal.sebb ada pintu tepi


If u ada masa maybe u can survey outside as i know top fellow also supp to other person.diaorg middle person only but if u mls ambil kat diaorg lah. But mahal sikitlah

denesh87
post Oct 1 2013, 07:56 AM

New Member
*
Junior Member
41 posts

Joined: Apr 2010


QUOTE(ericlaiys @ Sep 30 2013, 03:27 PM)
Dura (4th Phase) cost RM268K+ (the most expensive intermediate unit in entire Bandar Putera 2 phase, i think). Everywhere also leasehold and limited freehold. Freehold wont get 250K. Not sure but i think someone in previous post say got. Probably you can reverse and check previous post.
*
Yeah.. Hard to find freehold around 250k.. Check the previous post edy.. It was at bukit naga and jalan kebun.. But malay reserve land..

ericlaiys
post Oct 1 2013, 11:02 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(denesh87 @ Oct 1 2013, 07:56 AM)
Yeah.. Hard to find freehold around 250k.. Check the previous post edy.. It was at bukit naga and jalan kebun.. But malay reserve land..
*
that's why. It really depend what you really want
a) landed or condo or apartment (if not landed, get ready to pay high maintenance every month till you die)
b) freehold or leasehold. (if freehold, get ready to pay higher price)
c) budget
d) single storey or double storey.

For me single storey is better than apartment/condo. What to do limited budget? lol

I still remember that been hunting for house 2 years+, very difficult to find a house which is rm200+. At last found here, dont really care much and straight place order. And IOI is reputable company. At least the project wont abandon like my friend case.

This post has been edited by ericlaiys: Oct 1 2013, 11:03 AM
denesh87
post Oct 1 2013, 01:33 PM

New Member
*
Junior Member
41 posts

Joined: Apr 2010


QUOTE(ericlaiys @ Oct 1 2013, 11:02 AM)
that's why. It really depend what you really want
a) landed or condo or apartment (if not landed, get ready to pay high maintenance every month till you die)
b) freehold or leasehold. (if freehold, get ready to pay higher price)
c) budget
d) single storey or double storey.

For me single storey is better than apartment/condo. What to do limited budget? lol

I still remember that been hunting for house 2 years+, very difficult to find a house which is rm200+. At last found here, dont really care much and straight place order. And IOI is reputable company. At least the project wont abandon like my friend case.
*
Yeahh.. I agree with you... Thanks to you now I made up my mind already.. haha smile.gif
ericlaiys
post Oct 1 2013, 04:14 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


Saudara and saudari sekalian,

I just came back from MPK to ask about house permit. Here is some information that i've gathered.

1. Do awning for car porch - need MPK permit. But you can only do 2 feet. The car porch is 10 feet. So must leave 8 feet. If do , then it is illegal and they can fine us. So he advise dont do it as just 2 feet, no point.
2. Yard renovation (either grill, cement, skylight) as long you modify from current look (which is empty) but except kitchen door + grill. Then you need to apply permit.
3. Destroy the dusbin /reallocate. Then need permit as well.

This mpk guy just came back from Bandar putera 2 and he know our house very well. I did not show our house plan, he already draw it infront of me in less than 5 minute.

Well, look like i need to apply permit. He advise me to apply front (dustbin) & back (yard). Even i don't do, this permit is valid for a year. After a year just renew. Just extra RM70 on front & yard permit. so just apply together.

Other renovation is different price. He will provide explanation. Look like i need to read the whole panduan before apply.

This post has been edited by ericlaiys: Oct 1 2013, 04:17 PM
senapang
post Oct 1 2013, 09:37 PM

Casual
***
Junior Member
417 posts

Joined: Mar 2008
QUOTE(ericlaiys @ Oct 1 2013, 04:14 PM)
Saudara and saudari sekalian,

I just came back from MPK to ask about house permit. Here is some information that i've gathered.

1. Do awning for car porch - need MPK permit. But you can only do 2 feet. The car porch is 10 feet. So must leave 8 feet. If do , then it is illegal and they can fine us. So he advise dont do it as just 2 feet, no point.
2. Yard renovation (either grill, cement, skylight) as long you modify from current look (which is empty) but except kitchen door + grill. Then you need to apply permit.
3. Destroy the dusbin /reallocate. Then need permit as well.

This mpk guy just came back from Bandar putera 2 and he know our house very well. I did not show our house plan, he already draw it infront of me in less than 5 minute.

Well, look like i need to apply permit. He advise me to apply front (dustbin) & back (yard). Even i don't do, this permit is valid for a year. After a year just renew. Just extra RM70 on front & yard permit. so just apply together.

Other renovation is different price. He will provide explanation. Look like i need to read the whole panduan before apply.
*
Wow ericlaiys, thanks for the useful info and explanation. Especially the awning 1. i tot we can simply cover our porch area with awning, donno there is a regulation on that. the dustbin i know must submit for permit approval. if i just cover the porch area with some kind of canvas or polycarbonate roof also cannot exceed 2feet? haiya..

by the way, thanks mimieukk..now i hv general figure lah on the grill..i try search for another quotation..hopefully can get 2k and below..haha
ericlaiys
post Oct 1 2013, 10:13 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(senapang @ Oct 1 2013, 09:37 PM)
Wow ericlaiys, thanks for the useful info and explanation. Especially the awning 1.  i tot we can simply cover our porch area with awning, donno there is a regulation on that. the dustbin i know must submit for permit approval. if i just cover the porch area with some kind of canvas or polycarbonate roof also cannot exceed 2feet? haiya..

by the way, thanks mimieukk..now i hv general figure lah on the grill..i try search for another quotation..hopefully can get 2k and below..haha
*
i also thought the same but today i felt not satisfy answer from low yat forum that mentioned no need. So just drove from kl to mpk to seek the answer

Is your house car porch(side) longer than our intermediate?. If no, then same fate as mine. Don't care awning, skylight, roof, or any other material, etc. All having the same fate.

anything not listed in original floor plan is consider modify structure. (except grill to door/glass windows)

You can try your luck see they allow for your side house. Just buy Rm10 for buku panduan. They will give you free consultancy advice

This post has been edited by ericlaiys: Oct 1 2013, 10:19 PM
mimieukk
post Oct 2 2013, 12:22 AM

Getting Started
**
Junior Member
56 posts

Joined: May 2013
QUOTE(ericlaiys @ Sep 29 2013, 09:04 PM)
I just came back from there. purposely wait till 7+. My side got street light functioning
*
U dura kan.yesterday i check still no street light except the road kat guard tu.huhuhu.
ericlaiys
post Oct 2 2013, 08:05 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mimieukk @ Oct 2 2013, 12:22 AM)
U dura kan.yesterday i check still no street light except the road kat guard tu.huhuhu.
*
Yes. mine is dura. My side, the whole street on my house has ON the light. Why your side slow? by right, cadia should get the facilities first. Now it seem opposite
ericlaiys
post Oct 2 2013, 08:06 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(mimieukk @ Oct 2 2013, 12:22 AM)
U dura kan.yesterday i check still no street light except the road kat guard tu.huhuhu.
*
-delete- duplicate post

This post has been edited by ericlaiys: Oct 2 2013, 08:06 AM
sikhwan3
post Oct 2 2013, 08:26 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(ericlaiys @ Oct 2 2013, 08:05 AM)
Yes. mine is dura. My side, the whole street on my house has ON the light. Why your side slow? by right, cadia should get the facilities first. Now it seem opposite
*
yes agreed...cadia so slow...maybe because cadia is cheaper than dura...so IOI pay less attention...haha

laugh.gif laugh.gif laugh.gif
PiGGy ^(oo)^
post Oct 2 2013, 09:09 AM

Getting Started
**
Junior Member
63 posts

Joined: Oct 2011
i wonder owner of previous phase Alpina / Basella got applied permit for back yard extension?? hm....
I got quote to build a duplex in room 2 RM6k....with wood staircase. I'm sure gonna go for it....hehe
suadrifhailaways
post Oct 2 2013, 11:04 AM

New Member
*
Junior Member
35 posts

Joined: Sep 2013
QUOTE(ericlaiys @ Sep 30 2013, 10:57 PM)
Nope. 4K for whole house. Different charges for yard grill (full coverage like "sangkar burung" and Polycarbonate Skylight‎. So my yard grill follow the same design as my whole house. He said my kitchen door is sliding grill so easy to move in/out to yard rather than normal grill open which blocked.
My kitchen door and room 3 has grill as well in case some one manage to break in from yard. Yard door full covered till almost neck so i can see easily to outside

Basic cost around 2K. Can't recall but according them is called copper brown. The best about this is thickness and their side dont have any no holes. So not easy to "kopek". Basic one, got holes and easy to kopek.

They bring me to another house (which has just completed renovated at bandar puteri which has installed with this grill. The cheap grill house is next to it. The house located at round about before we turn to bandar puteri.
I heard someone upgraded to security door and replace whole main glass door: cost 7K
*
eric, do you have some pict for the grill? mine not decide yet grill to install. TFR show me the sample on the dura..design simple and cantik, kemas... but quality mcm kureng.. hmm.gif

your dura is intermediate rite? does your yard shared with your neighbour? do you discuss with your neighbour on the grill installed?

mine is shared with my neighbour(seems like my neighbour not yet claim his/her keys)...I plan to cover it all as your plan..but, neighbour issue macam mane? rclxub.gif
ericlaiys
post Oct 2 2013, 01:23 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(PiGGy ^(oo)^ @ Oct 2 2013, 09:09 AM)
i wonder owner of previous phase Alpina / Basella got applied permit for back yard extension?? hm....
I got quote to build a duplex in room 2 RM6k....with wood staircase. I'm sure gonna go for it....hehe
*
dunno...not sure if anyone got fines or not. Got picture on duplex? Basically i saw room 2 ceiling is not that really so high but build duplex is ok. Why dont you do cement stair. Wood later termite issue.
ericlaiys
post Oct 2 2013, 01:33 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(suadrifhailaways @ Oct 2 2013, 11:04 AM)
eric, do you have some pict for the grill? mine not decide yet grill to install. TFR show me the sample on the dura..design simple and cantik, kemas... but quality mcm kureng.. hmm.gif

your dura is intermediate rite? does your yard shared with your neighbour? do you discuss with your neighbour on the grill installed?

mine is shared with my neighbour(seems like my neighbour not yet claim his/her keys)...I plan to cover it all as your plan..but, neighbour issue macam mane? rclxub.gif
*
Intermediate - yes.
My half wall at yard is sharing with neighbour. Till now did not see him but i know (left) is malay and (right) is indian. I'm in the middle (chinese). Multi citizen . smile.gif.

I planned to discuss but cannot see him. According to TFR, he got see them but they not yet decide on reno package. Hope can see them within this 2 week while waiting for my defect to rectify.

Well according to MPK, the form got mentioned get their approval but if cannot get never mind coz so new house. But if any damage to their area, then we need to bear the cost.

I think this is normal condition. Well, i just put full grill and skylight on my area. Dont think will damage anything. No hacking, etc.

just tumpang the half wall (me and neighbor) to put grill. I still hope that he do the same like mine. At least, i no need to worry water come in when raining from the right side.

attached is the grill for whole house and my yard use back same design. I also found the original package also so so (2K). If you compare on-site, you will choose this compare to original package grill

By the way, anyone encounter hollow tiles in their floor tiles?

This post has been edited by ericlaiys: Oct 2 2013, 01:37 PM


Attached thumbnail(s)
Attached Image
ericlaiys
post Oct 2 2013, 01:40 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(sikhwan3 @ Oct 2 2013, 08:26 AM)
yes agreed...cadia so slow...maybe because cadia is cheaper than dura...so IOI pay less attention...haha

laugh.gif  laugh.gif  laugh.gif
*
like that also can. The only different between cadia/dura is just full tiles at bathroom. If i'm not mistaken, both same.
Any different?
azmirsafuan
post Oct 3 2013, 07:43 AM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
i will take my keys today...
sikhwan3
post Oct 3 2013, 08:08 AM

Getting Started
**
Junior Member
76 posts

Joined: Aug 2013


QUOTE(azmirsafuan @ Oct 3 2013, 07:43 AM)
i will take my keys today...
*
congrats bro biggrin.gif biggrin.gif
azmirsafuan
post Oct 3 2013, 09:45 AM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
ada sapa2 dari lorong 4R?
PiGGy ^(oo)^
post Oct 3 2013, 10:10 AM

Getting Started
**
Junior Member
63 posts

Joined: Oct 2011
My renovation will start next week!
1. Extend backyard with safety door
2. Extend bathroom no. 2
3. Build a 6ft wall for altar
4. Rebuild frt main entrance with bricks & safety door
5. Build duplex in room 2, 6ft W x 8ft H
6. Grille
7. Re-wiring & plumbing works

ETA 3-4 weeks complete.


ericlaiys
post Oct 3 2013, 12:19 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(azmirsafuan @ Oct 3 2013, 09:45 AM)
ada sapa2 dari lorong 4R?
*
4R/KS8? -Dura?
Don't tell me that you're my neighbor? Can pm me your house address?

This post has been edited by ericlaiys: Oct 3 2013, 12:21 PM
ericlaiys
post Oct 3 2013, 12:20 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(PiGGy ^(oo)^ @ Oct 3 2013, 10:10 AM)
My renovation will start next week!
1. Extend backyard with safety door
2. Extend bathroom no. 2
3. Build a 6ft wall for altar
4. Rebuild frt main entrance with bricks & safety door
5. Build duplex in room 2, 6ft W x 8ft H
6. Grille
7. Re-wiring & plumbing works

ETA 3-4 weeks complete.
*
cool. Got apply MPK permit?
Can pm me how much?
ericlaiys
post Oct 3 2013, 12:22 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(azmirsafuan @ Oct 3 2013, 07:43 AM)
i will take my keys today...
*
Remember to share your defect experience... smile.gif
suadrifhailaways
post Oct 3 2013, 03:37 PM

New Member
*
Junior Member
35 posts

Joined: Sep 2013
QUOTE(PiGGy ^(oo)^ @ Oct 3 2013, 10:10 AM)
My renovation will start next week!
1. Extend backyard with safety door
2. Extend bathroom no. 2
3. Build a 6ft wall for altar
4. Rebuild frt main entrance with bricks & safety door
5. Build duplex in room 2, 6ft W x 8ft H
6. Grille
7. Re-wiring & plumbing works

ETA 3-4 weeks complete.
*
good!... mind if you can share the cost to me(pm).. thumbup.gif
azmirsafuan
post Oct 4 2013, 11:22 AM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
QUOTE(ericlaiys @ Oct 3 2013, 12:22 PM)
Remember to share your defect experience... smile.gif
*
right now dont see major defect except painting defect. My water line from the main suppose to be buried undergorund but it seems i can physically see the line.
mind to share what is your defect bro?
will come this saturday to check thoroughly..
ericlaiys
post Oct 4 2013, 12:48 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(azmirsafuan @ Oct 4 2013, 11:22 AM)
right now dont see major defect except painting defect. My water line from the main suppose to be buried undergorund but it seems i can physically see the line.
mind to share what is your defect bro?
will come this saturday to check thoroughly..
*
This is the summary of my defect checking:-

1. Pipe outside (same like your case)
2. Tiles inside the house (look carefully) on each gap got holes. Problem when wash floor and water can go inside the tiles. Some not even proper pluster
3. Wall painting (white color here and there)
4. Side wall (not even & scratches here and there). Check the plaster as well
5. Wall plug not working
6. Door knob (no holes & some reverse)
7. Glass windows and door (difficult to open/ close/ unable to push)
8. Crack on the yard which near to room 3
9. Ceiling not properly close at the kitchen outside
10. Crack on the ceiling outside (car porch)
11. Crack on Dustbin, plaster issue, holes, etc
12. Crack on Postbox, plaster issue, holes, etc
13. Wood door got crack on the bottom
14. Hollow tiles (fews)
15. Crack on the wall (near to water meter)
16. Crack on toilet roles (bathroom 1 & 2)
16. Poor plaster on top of bathroom 1 & 2

Outside is the worst and a lot of defects. Inside is minor. That's why i've submitted 6 pages of defects & 130+ pictures (repeated defect i did not take picture, if not will exceeded 500 picture). Since so many defect, i have stop TFS from start renovate my house.

I spent 1 1/2 days to check full time.

Make sure you test water tank and water. I wash my bathroom 1 & 2 and kitchen ( here is the least defect)

Good luck to you.


suadrifhailaways
post Oct 4 2013, 03:42 PM

New Member
*
Junior Member
35 posts

Joined: Sep 2013
QUOTE(ericlaiys @ Oct 4 2013, 12:48 PM)
This is the summary of my defect checking:-

1. Pipe outside (same like your case)
2. Tiles inside the house (look carefully) on each gap got holes. Problem when wash floor and water can go inside the tiles. Some not even proper pluster
3. Wall painting (white color here and there)
4. Side wall (not even & scratches here and there). Check the plaster as well
5. Wall plug not working
6. Door knob (no holes & some reverse)
7. Glass windows and door (difficult to open/ close/ unable to push)
8. Crack on the yard which near to room 3
9. Ceiling not properly close at the kitchen outside
10. Crack on the ceiling outside (car porch)
11. Crack on Dustbin, plaster issue, holes, etc
12. Crack on Postbox, plaster issue, holes, etc
13. Wood door got crack on the bottom
14. Hollow tiles (fews)
15. Crack on the wall (near to water meter)
16. Crack on toilet roles (bathroom 1 & 2)
16. Poor plaster on top of bathroom 1 & 2

Outside is the worst and a lot of defects. Inside is minor. That's why i've submitted 6 pages of defects & 130+ pictures (repeated defect i did not take picture, if not will exceeded 500 picture). Since so many defect, i have stop TFS from start renovate my house.

I spent 1 1/2 days to check full time.

Make sure you test water tank and water. I wash my bathroom 1 & 2 and kitchen ( here is the least defect)

Good luck to you.
*
wow..think my list oso like that..dis weekend baru boleh check thoroughly...coz my wife baru deliver bby ..so hard to let her behind alone..hehehe hopefully no major defect..
mine dura 4S
nod.gif

This post has been edited by suadrifhailaways: Oct 4 2013, 03:43 PM
azmirsafuan
post Oct 4 2013, 04:05 PM

Getting Started
**
Junior Member
87 posts

Joined: May 2010
QUOTE(ericlaiys @ Oct 4 2013, 12:48 PM)
This is the summary of my defect checking:-

1. Pipe outside (same like your case)
2. Tiles inside the house (look carefully) on each gap got holes. Problem when wash floor and water can go inside the tiles. Some not even proper pluster
3. Wall painting (white color here and there)
4. Side wall (not even & scratches here and there). Check the plaster as well
5. Wall plug not working
6. Door knob (no holes & some reverse)
7. Glass windows and door (difficult to open/ close/ unable to push)
8. Crack on the yard which near to room 3
9. Ceiling not properly close at the kitchen outside
10. Crack on the ceiling outside (car porch)
11. Crack on Dustbin, plaster issue, holes, etc
12. Crack on Postbox, plaster issue, holes, etc
13. Wood door got crack on the bottom
14. Hollow tiles (fews)
15. Crack on the wall (near to water meter)
16. Crack on toilet roles (bathroom 1 & 2)
16. Poor plaster on top of bathroom 1 & 2

Outside is the worst and a lot of defects. Inside is minor. That's why i've submitted 6 pages of defects & 130+ pictures (repeated defect i did not take picture, if not will exceeded 500 picture). Since so many defect, i have stop TFS from start renovate my house.

I spent 1 1/2 days to check full time.

Make sure you test water tank and water. I wash my bathroom 1 & 2 and kitchen ( here is the least defect)

Good luck to you.
*
thanks bro..will check against ur finding..it really helps a lot..


ericlaiys
post Oct 6 2013, 12:23 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


After a week submitted defect list status:-

-they (IOI) has fixed main issue outside. No more crack and has properly cement my post box & outdoor wall & ceiling
- fixed wall (indoor) and painted whole wall.
-fixed some side tiles & plaster.
-fixed glass door and windows. Now easy to open and able to lock

Now outstanding is
- floor tiles damage & holes at tiles gap

hopefully , they can rectify it by next week.

This post has been edited by ericlaiys: Oct 7 2013, 12:06 PM
zery
post Oct 7 2013, 10:34 AM

New Member
*
Junior Member
22 posts

Joined: Dec 2010


QUOTE(azmirsafuan @ Sep 23 2013, 10:01 AM)
tak..kt area umah kita gak la...diorang sewa or pinjam rumah org yg dah reno ngan diorang jadikan showhouse utk cadia/dura..sapa2 nk tgk camne design leh la g tgk..
*
sory nyampuk.. dh p tgk showhouse dieorg tu..mahallllll quotation.. utk kitchen je 7k rclxub.gif whole rumah dlm 16k lebih..just grill, ktchen (kalau x silap) n lampu 12 biji..kipas 2..huhu

3 Pages  1 2 3 >Top
 

Change to:
| Lo-Fi Version
0.2752sec    0.38    6 queries    GZIP Disabled
Time is now: 22nd December 2025 - 10:52 PM