Welcome Guest ( Log In | Register )

60 Pages « < 5 6 7 8 9 > » Bottom

Outline · [ Standard ] · Linear+

 Bandar Putera 2 , Klang, worth buying?

views
     
TScrazeeclan
post Nov 20 2012, 10:25 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(senapang @ Nov 20 2012, 12:29 AM)
So cassia member..already get ur key?
Kindly share ur defect during inspection? Any major?
*
i believe only cash buyer get their key but by this week those loan buyer will get their key...everyone just share their defect during inspection...i believe there is alot of complain on the wall hair line crack at the car porch there....
dragon_lee
post Nov 21 2012, 09:43 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(crazeeclan @ Nov 20 2012, 10:25 AM)
i believe only cash buyer get their key but by this week those loan buyer will get their key...everyone just share their defect during inspection...i believe there is alot of complain on the wall hair line crack at the car porch there....
*
Boss,

So far only owner with A.IA and PB Bank loan can get their key.

The rest still waiting, if not this Friday should be next week nod.gif

I saw the crack as well, wondering why they didn't do the proper touch up before handover.. hmm.gif
TScrazeeclan
post Nov 22 2012, 08:20 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



HSBC already settle the loan reimbursement. Im getting my key this Saturday at 3pm....maybe they wanna let you see the defect without hiding it...hahaha....
ericlaiys
post Nov 22 2012, 09:37 AM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(dragon_lee @ Nov 21 2012, 09:43 PM)
Boss,

So far only owner with  A.IA and PB Bank loan can get their key.

The rest still waiting, if not this Friday should be next week nod.gif

I saw the crack as well, wondering why they didn't do the proper touch up before handover..  hmm.gif
*
May be they want to say by "design"...is the crack happen on all house and how come can easily crack. They cut down material and give cheap material?
dragon_lee
post Nov 22 2012, 04:06 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(crazeeclan @ Nov 22 2012, 08:20 AM)
HSBC already settle the loan reimbursement. Im getting my key this Saturday at 3pm....maybe they wanna let you see the defect without hiding it...hahaha....
*
Boss,

Pls update us once you inspected the house smile.gif

Thanks
TScrazeeclan
post Nov 22 2012, 08:43 PM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(ericlaiys @ Nov 22 2012, 09:37 AM)
May be they want to say by "design"...is the crack happen on all house and how come can easily crack. They cut down material and give cheap material?
*
what i can say is majority of the house got the crack....especially the show room....


Added on November 22, 2012, 8:44 pm
QUOTE(dragon_lee @ Nov 22 2012, 04:06 PM)
Boss,

Pls update us once you inspected the house smile.gif

Thanks
*
sure sure...i will..

This post has been edited by crazeeclan: Nov 22 2012, 08:44 PM
dragon_lee
post Nov 22 2012, 09:41 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



How nice if the shop lot in front of Cassia is ready with CF smile.gif


TScrazeeclan
post Nov 23 2012, 08:39 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(dragon_lee @ Nov 22 2012, 09:41 PM)
How nice if the shop lot in front of Cassia is ready with CF smile.gif
*
yeah...i think need another 1 year right? then should have mamak...car wash centre...minimart...anyway how about you? when are you getting your VP?
dragon_lee
post Nov 23 2012, 09:41 AM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(crazeeclan @ Nov 23 2012, 08:39 AM)
yeah...i think need another 1 year right? then should have mamak...car wash centre...minimart...anyway how about you? when are you getting your VP?
*
Boss,

Luckily you can always go across the road to the other site of the shop smile.gif

There's a new mamak restaurant open *got free dinner from 7-9pm only that day* , 99 mini market, car wash and etc.

VP maybe next week, waiting for the bank to release...

ericlaiys
post Nov 23 2012, 01:04 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(dragon_lee @ Nov 23 2012, 09:41 AM)
Boss,

Luckily you can always go across the road to the other site of the shop smile.gif

There's a new mamak restaurant open *got free dinner from 7-9pm only that day* , 99 mini market, car wash and etc.

VP maybe next week, waiting for the bank to release...
*
Please share as well the $$ that need to pay to developer after the house is complete & get the key (besides than bank loan)
dragon_lee
post Nov 23 2012, 03:36 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(ericlaiys @ Nov 23 2012, 01:04 PM)
Please share as well the $$ that need to pay to developer after the house is complete & get the key (besides than bank loan)
*
RM700++ * can't remember exactly the figure* smile.gif
TScrazeeclan
post Nov 23 2012, 04:08 PM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(dragon_lee @ Nov 23 2012, 09:41 AM)
Boss,

Luckily you can always go across the road to the other site of the shop smile.gif

There's a new mamak restaurant open *got free dinner from 7-9pm only that day* , 99 mini market, car wash and etc.

VP maybe next week, waiting for the bank to release...
*
oh..got new mamak ady ar....i only notice 99speedmart and car wash....cool...one day we should meet up for a drink will all Cassia owner...


Added on November 23, 2012, 4:08 pm
QUOTE(ericlaiys @ Nov 23 2012, 01:04 PM)
Please share as well the $$ that need to pay to developer after the house is complete & get the key (besides than bank loan)
*
mine is RM720...

This post has been edited by crazeeclan: Nov 23 2012, 04:08 PM
dragon_lee
post Nov 23 2012, 05:56 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(crazeeclan @ Nov 23 2012, 04:08 PM)
oh..got new mamak ady ar....i only notice 99speedmart and car wash....cool...one day we should meet up for a drink will all Cassia owner...


Added on November 23, 2012, 4:08 pm
mine is RM720...
*
Haha!

No problem

Only thing I'm worried is they should widen the road there...


Added on November 25, 2012, 12:29 am
QUOTE(crazeeclan @ Nov 22 2012, 08:43 PM)
what i can say is majority of the house got the crack....especially the show room....


Added on November 22, 2012, 8:44 pm
sure sure...i will..
*
Boss,

How is the inspection today?

Everything good? hmm.gif

This post has been edited by dragon_lee: Nov 25 2012, 12:29 AM
TScrazeeclan
post Nov 25 2012, 09:53 PM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(dragon_lee @ Nov 23 2012, 05:56 PM)
Boss,

How is the inspection today?

Everything good? hmm.gif
*
Today is my inspection day....inspection from 11am in the morning till 3pm....below is the list of defect...

1.main gate not align properly...gate hard to close...

2.main wooden door difficult to close and lock....and the lockset got rusty...

3.paint like tear drop at staircase wall...few patch....

4.staircase grill rusty....metal expose...

5.certain wall got paint chip off...

6. top part of the ELCB box never paint ...can see cement...

7. floor level at the back door slanting towards inside...when raining, the water flow into the house instead of going out...it make my kitchen area wet...

8. back door frame dented

9.all the floor hole cover(the white pcs thing) broken...

10. ground floor bathroom no water at all...i try open whole house locking tap but still no water out....same goes to the washing machine tap...

11.ground floor bathroom floor hole inside got a big pipe that block the water from draining out smoothly...

12.master bedroom bathroom....shower point water pressure very low...i think my peeing power even better....others ok...

13.window on both upstair bathroom hard to open and cant close...

14. water leakage on both upstair bathroom after i flood the bathroom for 30mins only..can see the water leak out to the staircase and ground floor room toilet....

15.shower area and dry area in the master bedroom bathroom are the same level instead of shower area should be lower...the white colour tiles deviding this both area are still there and is poorly fix and misalign...

Master bedroom door tilt abit .so when there is a movement on the door, it actually rubbing the tiles below...

17.family hall upstair - wall not even..can see wave and the painting is bad..can see alot of tear drop...

18.upstair room 2 lighting point missing and the door frame got paint chip off around 50 cent coin size...

19. can see got few roof tile crack...


Anyway below are the defect that i can find in this few hour...will do more check by next weekend on the flooring tiles....horefully nothing more defect... rclxub.gif

This post has been edited by crazeeclan: Nov 25 2012, 09:55 PM
dragon_lee
post Nov 25 2012, 11:53 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(crazeeclan @ Nov 25 2012, 09:53 PM)
Today is my inspection day....inspection from 11am in the morning till 3pm....below is the list of defect...

1.main gate not align properly...gate hard to close...

2.main wooden door difficult to close and lock....and the lockset got rusty...

3.paint like tear drop at staircase wall...few patch....

4.staircase grill rusty....metal expose...

5.certain wall got paint chip off...

6. top part of the ELCB box never paint ...can see cement...

7. floor level at the back door slanting towards inside...when raining, the water flow into the house instead of going out...it make my kitchen area wet...

8. back door frame dented

9.all the floor hole cover(the white pcs thing) broken...

10. ground floor bathroom no water at all...i try open whole house locking tap but still no water out....same goes to the washing machine tap...

11.ground floor bathroom floor hole inside got a big pipe that block the water from draining out smoothly...

12.master bedroom bathroom....shower point water pressure very low...i think my peeing power even better....others ok...

13.window on both upstair bathroom hard to open and cant close...

14. water leakage on both upstair bathroom after i flood the bathroom for 30mins only..can see the water leak out to the staircase and ground floor room toilet....

15.shower area and dry area in the master bedroom bathroom are the same level instead of shower area should be lower...the white colour tiles deviding this both area are still there and is poorly fix and misalign...

Master bedroom door tilt abit .so when there is a movement on the door, it actually rubbing the tiles below...

17.family hall upstair - wall not even..can see wave and the painting is bad..can see alot of tear drop...

18.upstair room 2 lighting point missing and the door frame got paint chip off around 50 cent coin size...

19. can see got few roof tile crack...
Anyway below are the defect that i can find in this few hour...will do more check by next weekend on the flooring tiles....horefully nothing more defect...  rclxub.gif
*
Boss,

Before I read this , I guess I need a Kopi Kaw Kaw, haha notworthy.gif

Guess the rest of the owner facing the same issue?

Wish me luck next week nod.gif

TScrazeeclan
post Nov 26 2012, 08:10 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(dragon_lee @ Nov 25 2012, 11:53 PM)
Boss,

Before I read this , I guess I need a Kopi Kaw Kaw, haha notworthy.gif

Guess the rest of the owner facing the same issue?

Wish me luck next week nod.gif
*
Yeah...u really need a kopi kaw kaw to read my defect list...Wish you good luck man...when are you getting your key ? this coming weekend?
ericlaiys
post Nov 26 2012, 01:53 PM

Look at all my stars!!
*******
Senior Member
7,596 posts

Joined: May 2012


QUOTE(dragon_lee @ Nov 25 2012, 11:53 PM)
Boss,

Before I read this , I guess I need a Kopi Kaw Kaw, haha notworthy.gif

Guess the rest of the owner facing the same issue?

Wish me luck next week nod.gif
*
Wah lau. so many defect!
TScrazeeclan
post Nov 26 2012, 02:06 PM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(ericlaiys @ Nov 26 2012, 01:53 PM)
Wah lau. so many defect!
*
im fine with minor defect but i cant tolerate with the bathroom water proofing....
dragon_lee
post Nov 26 2012, 10:57 PM

~Think Different~
*****
Senior Member
748 posts

Joined: Oct 2011
From: ~The Millionaire's Mindset~



QUOTE(crazeeclan @ Nov 26 2012, 08:10 AM)
Yeah...u really need a kopi kaw kaw to read my defect list...Wish you good luck man...when are you getting your key ? this coming weekend?
*
Boss,

Not sure as the bank haven't release the final payment.

Will keep you posted.

Guess I will bring my white coffee during inspection.. flex.gif
TScrazeeclan
post Nov 27 2012, 08:19 AM

On my way
****
Senior Member
542 posts

Joined: Jan 2003
From: shah alam



QUOTE(dragon_lee @ Nov 26 2012, 10:57 PM)
Boss,

Not sure as the bank haven't release the final payment.

Will keep you posted.

Guess I will bring my white coffee during inspection.. flex.gif
*
hope u can get your VP by this weekend...but i heard from the person in charge of this VP , this coming weekend are fully book..yeah..u really need some white coffee during inspection..i will be at my house during this weekend to do more inspection on the tiles..need to actually check each and every tiles to see whether it is hollow at the bottom..give me a call..maybe can meet up and help you to check for defect....anyway which lane your house is?

60 Pages « < 5 6 7 8 9 > » Top
 

Change to:
| Lo-Fi Version
0.0306sec    0.35    6 queries    GZIP Disabled
Time is now: 22nd December 2025 - 10:17 PM