ts..nice work & effort!.. very nice thread yaw! thumbs up! thumbup.gif cannot wait for finish result drool.gif

TSjojozep
post Apr 5 2011, 11:49 AM

Getting Started
**
Junior Member
119 posts

Joined: Sep 2008
QUOTE(isma45 @ Apr 5 2011, 11:00 AM)
ts..nice work & effort!.. very nice thread yaw! thumbs up! thumbup.gif  cannot wait for finish result  drool.gif
*
Thanks! Hope everyone has a chance/money to renovate to make the home enjoyable + gift to family members to enjoy,my reason to go thru all the learning, frustrations and uncertainties...sometime cannot sleep.. yawn.gif

Many people have no ideas..so I share my mistakes and any success with everyone..please forgive if info is not enough,still learning.. wink.gif


Below is picture of concealed wiring with white PVC conduit. They hack the bricks little bit , put the tube in and then only cement and plaster render..this way- reduce double work.




Attached thumbnail(s)
Attached Image Attached Image
skng03
post Apr 5 2011, 02:08 PM

Regular
******
Senior Member
1,450 posts

Joined: Oct 2008


QUOTE(jojozep @ Apr 5 2011, 11:49 AM)
Thanks! Hope everyone has a chance/money to renovate to make the home enjoyable + gift to family members to enjoy,my reason to go thru all the learning, frustrations and uncertainties...sometime cannot sleep.. yawn.gif

Many people have no ideas..so I share my mistakes and any success with everyone..please forgive if info is not enough,still learning.. wink.gif
Below is picture of concealed wiring with white PVC conduit. They hack the bricks little bit , put the tube in and then only cement and plaster render..this way- reduce double work.
*
wahhh .. the steel bar exposed liao ..... you should ask the contractor to repair it
TSjojozep
post Apr 5 2011, 04:30 PM

Getting Started
**
Junior Member
119 posts

Joined: Sep 2008
QUOTE(skng03 @ Apr 5 2011, 02:08 PM)
wahhh .. the steel bar exposed liao ..... you should ask the contractor to repair it
*
The line is not steel bar - it is the line created when they peel the plywood out...
bteoh
post Apr 5 2011, 10:42 PM

Getting Started
**
Junior Member
158 posts

Joined: Dec 2009
QUOTE(jojozep @ Apr 5 2011, 10:45 AM)
My contractor charge me rm5000 to redo new PVC pipes from meter to house baths(3),kitchen,garden,new water tank(outside slab) as the current pipes are jammed..
Installation of WC,taps are seperate costs..which depends what king of tap,but should be in range of rm50-200 each item..

Double storey house - maybe rm1800-rm2500?
*
if u don't mind, if i wanted to get all your contractor contact? do a site visit of the workmanship can? but can see from ur posted picture already tooo happy enuf....smile.gif
TSjojozep
post Apr 6 2011, 10:20 PM

Getting Started
**
Junior Member
119 posts

Joined: Sep 2008
QUOTE(bteoh @ Apr 5 2011, 10:42 PM)
if u don't mind, if i wanted to get all your contractor contact? do a site visit of the workmanship can? but can see from ur posted picture already tooo happy enuf....smile.gif
*
my house become showroom for contractors? wau-lau..my wife will hantam my head.. rclxub.gif

just PM me and you can deal with contractors directly..
bteoh
post Apr 6 2011, 10:23 PM

Getting Started
**
Junior Member
158 posts

Joined: Dec 2009
QUOTE(jojozep @ Apr 6 2011, 10:20 PM)
my house become showroom for contractors? wau-lau..my wife will hantam my head.. rclxub.gif

just PM me and you can deal with contractors directly..
*
your wife knows you posting picture all over LYN, i think she can feel the same too
isma45
post Apr 6 2011, 11:44 PM

- rocking the highway -
****
Senior Member
582 posts

Joined: Jun 2009
QUOTE(bteoh @ Apr 6 2011, 10:23 PM)
your wife knows you posting picture all over LYN, i think she can feel the same too
*
hehee.. b strong ts! brows.gif

hacker6280
post May 3 2011, 02:29 PM

Getting Started
**
Junior Member
93 posts

Joined: Mar 2009
Any update on the house reno?
weikee
post May 7 2011, 10:05 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
Hi jojozep,

Did you get approval for RC parking porch? mine got reject and submit again and approve with the conventional parking roof.

Your reno look much bigger than mine, mine tearing down nearly 60% of the house and is a intermittent lot.
TSjojozep
post May 10 2011, 02:02 AM

Getting Started
**
Junior Member
119 posts

Joined: Sep 2008
QUOTE(hacker6280 @ May 3 2011, 02:29 PM)
Any update on the house reno?
*
Latest update - pain in the neck contractor slow down the construction. I am still wondering why? I refused to give him tiling works after he back out on his words to include cutting of holes for lead lights - I ask him twice before I let him do the plaster ceiling for rm12500..and he lied with a straight face...telling me twice in my face that it will be included...then halfway, told me it is not included.

God be my witness...this ALBERT PHILOMEN A/L Raja did not honour on his words. To me ,this is down right dirty so my gloves are coming off.

After that, quoted me painting job for rm9000. I refuse to give him both painting and tiling job because I don't trust him ..which I believe that I have the right...guess what...he slow down my wet work until I had to find a place to rent.
Wet works , which I have paid him 90%, he never complete..what a bad assx contractor.

3 times, he promised me a date, each time asking for money which I gave...each time he disappoints.

Stay away from this Albert Philomen A/L Raja - truly disappointed about the way he conducts business. He was recommended by a Christian real estate agent(Cleo from Reapfield)who I bought the house from...truly truly...a big slip-up on my part, as he claims to be a true Christian..I am slowly discovering the truth.

Today, his workers now tells me about his background- apparently this is not the first time.... He even has been in a fight with house owners...and was once punched. Tonight, I also met one of the several tilers that he did not pay....

Be careful of recommendations - especially from people who have not used the contractor before...

I did not want to do this....but after long thoughts, I think people out there deserves to know the whole truth...so I am sharing in this forum..as per my original intention...about the journey...


Added on May 10, 2011, 2:05 am
QUOTE(weikee @ May 7 2011, 10:05 PM)
Hi jojozep,

Did you get approval for RC parking porch? mine got reject and submit  again and approve with the conventional parking roof.

Your reno look much bigger than mine, mine tearing down nearly 60% of the house and is a intermittent lot.
*
Yeah...my approved drawings is a RC roof car porch....try get a good contractor before you start..(easier said than done).. vmad.gif

This post has been edited by jojozep: May 10 2011, 02:05 AM
zheilwane
post May 10 2011, 02:17 AM

Look at all my stars!!
*******
Senior Member
4,184 posts

Joined: Jan 2008
From: Builders Hardware Enterprise 0362572412
heard n read a lot of stories about problematic contractors. Good thing that forumers like u willing to share their stories to warn other forumers not to follow ur footsteps. Seems like he purposely wanna cheat ur money.

Btw, i really think that the best is to use reputable LYN contractors as, if he done anything wrong, u can start writing bad about him and his online business is ruin for good. Eg: for kitchen cabinet, anything wrong, Erny will quickly rectify for forumers. If forumers starts complaining about her, no1 will engage her to do KC anymore.


Added on May 10, 2011, 2:29 am
Something wanna share with Forumers. There are many shops and contractors out there trying their best to think of ways to con consumers money or deceive them.

I am selling solar power + grundfos water pump package at a very low price but some customers came to my shop and say i can get cheaper. THen i ask back, r they really giving u grundfos instead of other cheap pumps? they say yes. The photo below is a very good example. This shop advertise GRUNDFOS logo with GRUNDFOS pump picture but when u look at the tiny words, it is writting "GEMINI EP2-30PC". SO, this shop is giving GEMINI and not Grundfos water pump, how misleading.

Some shops are more professional, they give u Grundfos Pump but they replace the Tank or Pressure control worth RM 400 to a Cheap CHINA 1 for RM 100+ only. So, consumers will think that they are getting original grundfos pump.

Conclusion, if u want to have a smooth and happy renovation, better spend a little bit more to engage a reputable contractor and purchase from the right shop.

user posted image

This post has been edited by zheilwane: May 10 2011, 08:28 AM
weikee
post May 10 2011, 08:45 AM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
QUOTE(jojozep @ May 10 2011, 02:02 AM)


Added on May 10, 2011, 2:05 am
Yeah...my approved drawings is a RC roof car porch....try get a good contractor before you start..(easier said than done).. vmad.gif
*
Maybe because you have a long house, my front was not that "long" did not get it approved. Or perhaps the MPSJ just want to make some delay and find some fault. Anyway is approve with normal roof.

But plan to use the Glass awning instead of RC roof to let more light in.

I got a contractor working now, already tearing down the house. Hope he is good, as of 1 month work, he still have not ask me for payment yet.
Skydrop
post May 10 2011, 09:12 AM

Casual
***
Junior Member
361 posts

Joined: Mar 2010
Hi Jojozep

Sorry to hear your bad experience. Hope you can find someone to rectify and fix it for you soon.
limch
post May 10 2011, 09:21 AM

Getting Started
**
Junior Member
133 posts

Joined: Jul 2006
QUOTE(jojozep @ May 10 2011, 02:02 AM)
Latest update - pain in the neck contractor slow down the construction. I am still wondering why? I refused to give him tiling works after he back out on his words to include cutting of holes for lead lights - I ask him twice before I let him do the plaster ceiling for rm12500..and he lied with a straight face...telling me twice in my face that it will be included...then halfway, told me it is not included.

God be my witness...this ALBERT PHILOMEN A/L Raja did not honour on his words. To me ,this is down right dirty so my gloves are coming off.

After that, quoted me painting job for rm9000. I refuse to give him both painting and tiling job because I don't trust him ..which I believe that I have the right...guess what...he slow down my wet work until I had to find a place to rent.
Wet works , which I have paid him 90%, he never complete..what a bad assx contractor.

3 times, he promised me a date, each time asking for money which I gave...each time he disappoints.

Stay away from this Albert Philomen A/L Raja - truly disappointed about the way he conducts business. He was recommended by a Christian real estate agent(Cleo from Reapfield)who I bought the house from...truly truly...a big slip-up on my part, as he claims to be a true Christian..I am slowly discovering the truth.

Today, his workers now tells me about his background- apparently this is not the first time.... He even has been in a fight with house owners...and was once punched. Tonight, I also met one of the several tilers that he did not pay....

Be careful of recommendations - especially from people who have not used the contractor before...

I did not want to do this....but after long thoughts, I think people out there deserves to know the whole truth...so I am sharing in this forum..as per my original intention...about the journey...


Added on May 10, 2011, 2:05 am
Yeah...my approved drawings is a RC roof car porch....try get a good contractor before you start..(easier said than done).. vmad.gif
*
I feel sad with your encountering with the contractor. From the pictures you posted, i guess that your reno would fetch up to RM180k-RM200k. 4 months is possible if the contractor brings in all the manpower he need. The nightmare will start if you invite many different contractors and the main contractor will start playing a blaming game.

So many issue with not even half way the reno. Workers not getting paid, how to get good quality work. The problems will keep coming. The worst scenario would be terminate the contractor and appoint a reliable construction company to finish off what you have started. End of the day, you want a quality finish and peace of mind.

Many Christians fell for "Christian brotherhood" for work and many people called themselves a Christian but never behave like one.

This post has been edited by limch: May 10 2011, 09:27 AM
Alan Soo
post May 10 2011, 09:51 AM

Getting Started
**
Junior Member
143 posts

Joined: Aug 2009
Sorry to hear that, but nowadays material price crazy increase, your contractor delay ur works at the end he will buy the expensive material.
Like last year common clay brick 1 piece around RM0.28 but today need RM0.37/pcs different around 32%.

Normally contractor will complete the job asap, in order to avoid material increase price. hopefully u can finish ur renovation works soon.

periwater
post May 10 2011, 06:47 PM

Casual
***
Junior Member
324 posts

Joined: Mar 2011
Every cloud has a silver lining. I understand your frustration and share your agony, having been through the same renovation journey. Now, finally completed and going to move in soon.

I didn't have an extensive renovations like yours, mainly tiling works in the porch, backyard, kitchen, 5 bathrooms, balcony, building brick walls, etc. My tiler completed all these works within a month. He brought in 5-7 workers on weekdays as weekends are prohibited to work by the management. He told me that all his Chinese workers are being paid daily between RM120.00 - RM180.00, so he can't afford to delay the work. The faster he completes, he can moves on to other jobs.

My plaster ceiling, plumbing and electrical wiring were working in tandem with the tiling. So all my wet works were completed within a month.

Painting took 8 days for interior and 2 days for exterior (Grd Flr, brick wall and fencing). All painted with 1 coat sealer and 2 coats primer.

Grinding and polishing my parquet floor ate up 2 days. Post renovation cleaning took another 2 days.

Finally installing kitchen cabinet, wardrobe, pergola, grills, gate and autogate, outdoor filter and pump, retractable awning, air-conds, fans lights and soft furnishing (curtains and rods). All these are done within 2 weeks.

To me, 2 months seemed like a long, long time and I can imagine how your life is being affected as your reno is more complicated than mine. Hang in there and I'm sure you will find a solution to your problems. Have a little faith!

Cheers.
gjohn
post May 11 2011, 09:32 AM

Casual
***
Junior Member
388 posts

Joined: Oct 2008
sorry to hear the story...
must be a headache if encountered something like that
hope it goes well after this
hhaf
post May 11 2011, 04:47 PM

New Member
*
Junior Member
25 posts

Joined: Apr 2011
Major renovation quite headache~ my house also under renovation and i estimated 250 k ~~~ but look still no enough... rclxub.gif the contractor last year oct starting the work until now 8 month already~ just finish 80% . vmad.gif most of problem is the contractor not too enough manpower... doh.gif


Added on May 11, 2011, 5:39 pmThe contractor quote for renovation
1.extend kitchen and add 1 new room in first floor-55k
2.fence wall 26k
3.rewiring and auto gate ,alram-15k
4.change window glass and tempered glass-15k
5.painting inc roof / fence wall-15k
6.repair roof and inc aluminium sheet -10k
7.tile interior and carpark-75 k
8.addition cost the concrete 13k ( he just tell me the concrete is no in the tile item so 75k not inc concrete) .it is differ item ??

a lot of item didn't mention ~~

rclxub.gif

This post has been edited by hhaf: May 11 2011, 05:42 PM
Neoh1979
post May 11 2011, 06:15 PM

Regular
******
Senior Member
1,811 posts

Joined: Feb 2011
QUOTE(hhaf @ May 11 2011, 04:47 PM)
Major renovation quite headache~ my house also under renovation and i estimated 250 k ~~~ but look still no enough... rclxub.gif  the contractor last year oct starting the work  until now 8 month already~ just finish 80% .  vmad.gif  most of problem is the contractor not too enough manpower...  doh.gif


Added on May 11, 2011, 5:39 pmThe contractor quote for renovation
1.extend kitchen and add 1 new room in first floor-55k
2.fence wall 26k
3.rewiring and auto gate ,alram-15k
4.change window glass and tempered glass-15k
5.painting inc roof / fence wall-15k
6.repair roof and inc aluminium sheet -10k
7.tile interior and carpark-75 k
8.addition cost the concrete 13k  ( he just tell me the concrete is no in the tile item so 75k not inc concrete) .it is differ item ??

a lot of item didn't mention ~~

rclxub.gif
*
Bro, very expensive lo..u quote how many contractor??
Probably your house very big.
Price from contractor to contractor can differ a lot.