 my house renovation, - journey

views
     
TSjojozep
post Feb 24 2011, 10:16 AM

Getting Started
**
Junior Member
119 posts

Joined: Sep 2008
QUOTE(NelsonBoy @ Feb 23 2011, 10:45 PM)
i tot RC = remote control car porch

lol-ed
*
Big decision to make - should I make all my side extension all RC -roof?

Contractor says that means next time, if want to extend -no problem. Already has second floor..

Problem now is - I need to amend my layout plans and submit. Archi says normally - quite fast to process this amendment.
edwardsiow
post Feb 24 2011, 10:19 AM

Getting Started
**
Junior Member
180 posts

Joined: Oct 2010
Just a remainder...check the size of the footing of those columns...From the picture, from the size of columns, it seems like a small footing...

I also build RC car porch roof for my house and RC roof for those extended area...My contractor built big footing for me so that in the future, like RC car porch roof, if want to become balcony, still safety if a lot of people stand on top of it....Other advantage is, if want to extend to second or third floor in the future, we don't need to rebuild the footing...

Just my opinion..my house also gone through major construction like you =)


Added on February 24, 2011, 10:23 am
QUOTE(jojozep @ Feb 24 2011, 10:16 AM)
Big decision to make - should I make all my side extension all RC -roof?

Contractor says that means next time, if want to extend -no problem. Already has second floor..

Problem now is  - I need to amend my layout plans and submit. Archi says normally - quite fast to process this  amendment.
*
Have to make sure the footing can support to second floor.....

This post has been edited by edwardsiow: Feb 24 2011, 10:23 AM
bugijun
post Feb 24 2011, 10:49 AM

On my way
****
Senior Member
532 posts

Joined: May 2006
From: Seremban


carefull with rc flat roof...if not treated carefully can easily leak
TSjojozep
post Feb 24 2011, 02:37 PM

Getting Started
**
Junior Member
119 posts

Joined: Sep 2008
QUOTE(edwardsiow @ Feb 24 2011, 10:19 AM)
Just a remainder...check the size of the footing of those columns...From the picture, from the size of columns, it seems like a small footing...

I also build RC car porch roof for my house and RC roof for those extended area...My contractor built big footing for me so that in the future, like RC car porch roof, if want to become balcony, still safety if a lot of people stand on top of it....Other advantage is, if want to extend to second or third floor in the future, we don't need to rebuild the footing...

Just my opinion..my house also gone through major construction like you =)


Added on February 24, 2011, 10:23 am

Have to make sure the footing can support to second floor.....
*
sweat.gif Thanks ..my architect will come check tomorrow..


Added on February 24, 2011, 2:42 pm
QUOTE(bugijun @ Feb 24 2011, 10:49 AM)
carefull with rc flat roof...if not treated carefully can easily leak
*
In fact, he says in my case, the extension roof is odd shape and there will be splashback and heavy rain,it will leak.

He say RC roof less likely to leak and he gives the 'smooth cement' one... haha what he meant by smooth cement will not leak? does he mean less porous ..? is there such a thing? smooth cement is less porous?

This post has been edited by jojozep: Feb 24 2011, 02:42 PM
yahoo1999
post Feb 24 2011, 04:44 PM

New Member
*
Junior Member
8 posts

Joined: Apr 2006
Just a piece of advise. Do put in water proofing compound into your RC roof.

Beside I have extra basin mixer & shower mixer from my recent house renovation.

1) Hansgrohe Focus S basin mixer, Qty. 1 unit
2) Hansgrohe Focus S conceal mixer, Qty. 1 unit
3) Hansgrohe Crometta Shower Head, Qty. 1 unit
4) Hansgrohe Focus E basin mixer, Qty. 1 unit
5) Hansgrohe Focus E expose bath mixer, Qty. 1 unit
6) Hansgrohe i-box, Qty. 2 units
7) Grohe - (replica) Full brass Toilet roll cover, Qty. 1 units



This post has been edited by yahoo1999: Mar 4 2011, 04:33 PM
TSjojozep
post Feb 26 2011, 07:29 PM

Getting Started
**
Junior Member
119 posts

Joined: Sep 2008
Progress Update:-

can see THE VIEW from my future master room balcony..looking into side and front garden..

This post has been edited by jojozep: Feb 26 2011, 07:33 PM


Attached thumbnail(s)
Attached Image Attached Image Attached Image
TSjojozep
post Feb 26 2011, 07:37 PM

Getting Started
**
Junior Member
119 posts

Joined: Sep 2008
Extended the Bathroom by 3 feet in the master BR.

View from the front - can see the new Master BR and the concrete car porch.



Attached thumbnail(s)
Attached Image Attached Image
kochin
post Mar 4 2011, 12:09 PM

I just hope I do!
********
All Stars
10,314 posts

Joined: Dec 2009
From: Malaysia


jojozep,
keep up the good work. looks kinda massive and must be time and mind consuming. what's the intended time frame to wrap up the whole thing?
the thing that concerns me the most would be water leaks. are you changing the existing roof?
kudos mate!
TSjojozep
post Mar 4 2011, 07:24 PM

Getting Started
**
Junior Member
119 posts

Joined: Sep 2008
[quote=yahoo1999,Feb 24 2011, 04:44 PM]
Just a piece of advise. Do put in water proofing compound into your RC roof.


What are the brands of waterproofing available for RC roof? Is PYE ok?


Added on March 6, 2011, 10:43 pm

10 days later..the bricks are laid, the cement render will start next week...

I have ask them to redo some part of wall that I thought was crooked...
contractors says any imperfections will be covered by cement rendering...to believe or not?



This post has been edited by jojozep: Mar 6 2011, 10:55 PM


Attached thumbnail(s)
Attached Image Attached Image Attached Image Attached Image
xtension
post Mar 7 2011, 12:32 AM

New Member
*
Junior Member
9 posts

Joined: Mar 2011
Good posting..when is finished date?

This post has been edited by xtension: Mar 7 2011, 12:39 AM
y4ng
post Mar 7 2011, 09:16 AM

Kambing Lembu
****
Junior Member
639 posts

Joined: Oct 2007
tumpang tanya, since u r in subang, do you have any contact for contractor doing toilets? (that is the only thing i can afford >.<)

toilets for apartment in usj11...thank you jojozep
fenture
post Mar 7 2011, 07:50 PM

Getting Started
**
Junior Member
60 posts

Joined: Aug 2009
Bro, mind sharing your architect contact with me? i do go to subang quite a lot, mind if I drop by to pay a visit? you can PM me.
TSjojozep
post Mar 8 2011, 09:45 AM

Getting Started
**
Junior Member
119 posts

Joined: Sep 2008
QUOTE(y4ng @ Mar 7 2011, 09:16 AM)
tumpang tanya, since u r in subang, do you have any contact for contractor doing toilets? (that is the only thing i can afford >.<)

toilets for apartment in usj11...thank you jojozep
*
sorry-lah...I fix my own toilets...not other people's...haha biggrin.gif

I am asking my contractor to move the toilet and make new one...that one is major work. Do you mean this type of work?


Added on March 11, 2011, 10:22 am
QUOTE(xtension @ Mar 7 2011, 12:32 AM)
Good posting..when is finished date?
*
Tell you the truth, I agree with contractor to start the reno about the 23Jan 2011 , 1 week before CNY,..the progress made is very fast because he only do my work..actually estimate 3-4 months to complete.. my neighbour says his took 6 months to become 10 months!! and my reno almost the same as his...so I am trying very hard to keep to 3-4 months .I tell contractor that he do fast, he can save money...
Also I am full time yet I can still feel stressed..I pity people who still have to go to office to work and still deal with the contractor...

Many small small things need decisions..I am glad that I am not working at the moment to do this... smile.gif

This post has been edited by jojozep: Mar 11 2011, 10:22 AM
xtension
post Mar 11 2011, 10:37 AM

New Member
*
Junior Member
9 posts

Joined: Mar 2011
QUOTE(jojozep @ Mar 8 2011, 09:45 AM)
sorry-lah...I fix my own toilets...not other people's...haha biggrin.gif

I am asking my contractor to move the toilet and make new one...that one is major work. Do you mean this type of work?


Added on March 11, 2011, 10:22 am
Tell you the truth, I agree with contractor to start the reno about the 23Jan 2011 , 1 week before CNY,..the progress made is very fast because he only do my work..actually estimate 3-4 months to complete.. my neighbour says his took 6 months to become 10 months!! and my reno almost the same as his...so I am trying very hard to keep to 3-4 months .I tell contractor that he do fast, he can save money...
Also I am full time yet I can still feel stressed..I pity people who still have to go to office to work and still deal with the contractor...

Many small small things need decisions..I am glad that I am not working at the moment to do this... smile.gif
*
Do fast - got any quality problems?
TSjojozep
post Mar 11 2011, 04:48 PM

Getting Started
**
Junior Member
119 posts

Joined: Sep 2008
Pictures of Y12 steel bars..used for RC
some unfinished concreting...




Attached thumbnail(s)
Attached Image Attached Image Attached Image Attached Image
recoil
post Mar 14 2011, 12:39 PM

Casual
***
Junior Member
334 posts

Joined: Feb 2006
hi jojo,

Thanks for sharing.... mind sharing the size of your extension, porch, interior and the breakdown cost?

thanks
centurionstareng
post Mar 14 2011, 01:39 PM

New Member
*
Junior Member
4 posts

Joined: Mar 2011


QUOTE(jojozep @ Feb 14 2011, 03:05 PM)
Haha.. I got more pictures coming... so keep checking..also will be adding new electrical and new water pipings soon...

More to go...new doors, new windows, new tiles, new ceilings...haha..mini series..


Added on February 14, 2011, 3:09 pm
Wah, sifu...you are correct..it is in Subang Jaya-leh..

Quotation is under 100K but banyak variation orders..


Added on February 14, 2011, 3:30 pm
150K -to do all wetworks, new piping, new doors, new windows, new flooring, new plaster ceiling

anticipate all flooring - tiles and laminates - 20K
anticipate all plaster ceiling - 20K
anticipate kitchen -15-20K
aluminium powder coated windows and doors - 20K

I guess the quotations must be competitive to achieve that.
*
Works going on great man. What are your plans in terms of lighting? Kindly let us know as we provide LED lightings for new and existing houses as well. We are based in puchong and subang is very near.

Will be tuning in to discorvery channel...MEGA-Engineering thumbup.gif season 1 @ subang jaya
y4ng
post Mar 16 2011, 05:34 PM

Kambing Lembu
****
Junior Member
639 posts

Joined: Oct 2007
walao fix own toilet, i wanna use next time i see your house, i stay in usj, work in glenmarie and lepak in subang a lot lolz..i think i know where is your house, open house call ya hehehe..

i just wanna hack tiles, replace em, get new wc/basin,countertop, erm...a few rubber duckies..

thanks for the reply ya, hehe
siauann
post Mar 17 2011, 09:23 PM

Music-Movies-Coffee
*******
Senior Member
3,375 posts

Joined: May 2005
From: MeeRee


anymore updates? smile.gif
TSjojozep
post Mar 18 2011, 12:09 AM

Getting Started
**
Junior Member
119 posts

Joined: Sep 2008
QUOTE(siauann @ Mar 17 2011, 09:23 PM)
anymore updates? smile.gif
*
sweat.gif under pressure...

actually a lot of work being done but did not want to post...since it is about toilet and severage ...right?

ok...to share lah...contractor wanted rm3000 extra just to move this big iron severage pipe...that is dismantle this GI pipe and reposition this pipe as part of the wall...so you don't see the pipe...all 3 toilets has this pipe.

the reason is that there is lot of work as this pipe goes from above the roof down to toilet, down to the severage tank in the garden ...I post a pic below..

so be careful what you ask for...anyway...I told contractor to brick it up and hide it..no need to dismantle, it looks like it could last another 100 years...hehe..

contractor very sad...I turned his rm3000 to rm300.


Added on March 18, 2011, 12:31 am
QUOTE(recoil @ Mar 14 2011, 12:39 PM)
hi jojo,

Thanks for sharing.... mind sharing the size of your extension, porch, interior and the breakdown cost?

thanks
*
I show the exension plan...and he quoted lump sum...no breakdown...by sq feet and price per sq feet if that is what you are looking for...


Added on March 18, 2011, 12:37 am
QUOTE(centurionstareng @ Mar 14 2011, 01:39 PM)
Works going on great man. What are your plans in terms of lighting? Kindly let us know as we provide LED lightings for new and existing houses as well. We are based in puchong and subang is very near.

Will be tuning in to discorvery channel...MEGA-Engineering  thumbup.gif season 1 @ subang jaya
*
Not going for LED as I heard those from China not reliable yet..those that are not are too expensive...

Oh..went to a few shops in Puchong already...you can PM me your shop name...I can go shopping there too...

This post has been edited by jojozep: Mar 18 2011, 12:37 AM


Attached thumbnail(s)
Attached Image