Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed

Outline · [ Standard ] · Linear+

Investment Nadayu 92, Nadayu 92, anyone buying?

views
     
cheon
post Jul 23 2013, 03:32 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(odsyauy @ Jul 23 2013, 03:23 PM)
i meet type A owner last few week and he told me wanna cover the big hole with dunno how thick glass and it cost ard 5K++ if not mistaken  biggrin.gif
*
Ooo... After cover can stand there?

Or juz for decoration?
cheon
post Jul 23 2013, 05:09 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(AMINT @ Jul 23 2013, 04:15 PM)
Aku punye ni Type A. Semi D next year baru siap. tu la. honestly masa aku nak beli dulu aku tertanya diri aku. kitchen kat 2nd floor? WTF?? tapi bila dah siap ni, aku masuk tgk rumah aku, weii not bad la. huhu.  thumbup.gif
*
Yes, bro.
I've the same feeling too.

But when i think back, it's good to have kitchen at the second floor as it's more convenient. rclxms.gif

cheon
post Jul 24 2013, 06:32 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
According to Kajang 2 plan, there's a new road connected Kajang 2 and Nadayu 92 through the international school. Anyone can update on this?

How's the Unifi and Streamyx?
cheon
post Jul 25 2013, 04:57 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(AMINT @ Jul 24 2013, 11:11 PM)
The road is confirmed based on my discussion with Kajang 2 SA. There will also be a proposed road from Tropicana to Silk Highway. If the road is there, u can also use that road. On unifi and streamyx, sadly i was told only streamyx available so far. We should propose to TM for unifi. Soon more will come in
*
Thanks bro. I am staying at taman Kajang utama now, have to make a big round if going to Nadayu.

Hope the road can be done as soon as possible. rclxms.gif
cheon
post Jul 27 2013, 07:56 AM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(jit13 @ Jul 26 2013, 11:11 PM)
Bro, just had a thought about your plan to cover up the void. The ground floor windows are laid out horizontally and don't look that big. U think there will there be enough natural lighting and air circulation after tampal? U gonna use glass?
*
Haha, this is the main issue.....

Once i tampal the hole the space is a lot bigger, but have to do something on the lighting~

Glass not dare to use,scared scared.
cheon
post Jul 30 2013, 10:06 AM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(Malaysian_driver @ Jul 27 2013, 11:12 PM)
Cheon: Maybe don't use whole piece glass.  Use mainly concrete but with several empty panels for tempered glass.
*
Thanks for the suggestions.

I have confirmed my booking last week. I will do a laminate platform on the middle floor on the covered hole. It's more likely adding a small stage on it~ smile.gif
cheon
post Jul 30 2013, 10:07 AM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(ORIZ @ Jul 30 2013, 10:02 AM)
Ya damn susah with two entrance. Sure got a lot of guest silap masuk all. I dun think n92 will convert it into gym as it is not in snp. Not sure if we can kumpul money n make a gym.

Anyone tried fixing the electricity main point (3 things they gave). Can take out n put ah whenever we want ?
*
Yes, correct. We should form a strong community.

I suggest we make the pool a bit wider too.. The pool is too small now~ shakehead.gif
cheon
post Jul 30 2013, 10:10 AM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(AMINT @ Jul 30 2013, 10:06 AM)
huhu. i dont mind if we all kumpul duit to make a gym there. then find an entity to handle it. smile.gif electrical  main point? for my type A, they pasang everything already. i didnt have to do a thing
*
Yes, i agreed. Each owner pay some money..
cheon
post Aug 1 2013, 06:37 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(jit13 @ Jul 30 2013, 10:34 AM)
Cool, bro.. biggrin.gif

I suppose you are moving your living room from GF to 1F (more practical if together with kitchen/dining and the huge balcony)? IF my house, I would also convert GF into entrance foyer and children's den, or consider partitioning off a room for use as a study/guest room/home office  biggrin.gif
*
I am a soho and i hope to convert it into an office for ground floor.

For the time being, i'll make in a living room + small office at GF smile.gif
cheon
post Aug 1 2013, 06:39 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(yvern @ Aug 1 2013, 04:41 PM)
any type A's owners here notice that only single-phase meter is given by the developer?
is it enough to support normal household electricity load?
i heard that we should upgrade to a 3-phase supply if there are 3 or more air-conditioners in home in order to ensure the stability and reliability of electricity supply,is it true??
what's the issue if we don't upgrade??
*
I am a type A owner too..i didn't notice that. Will check on coming weekend~
cheon
post Aug 4 2013, 10:14 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(GiantChockyStick @ Aug 1 2013, 11:31 PM)
can we upgrade to 3phase? ..mine type a TOO
*
I am a type A owner too and i juz knew that ours are 1phase wiring.

To my disappointment, our double storey neighbors opposite our house with 3 phase wiring supply!

This is really nonsense ! mad.gif

Any want knows the cost to change to 3 phase? Can we complaint to the developer? hmm.gif
cheon
post Aug 5 2013, 09:10 AM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(jit13 @ Aug 4 2013, 11:06 PM)
Yalah, if only type A doesn't get 3 phase, sensible reason to appeal..
*
Bro..i've called nadayu 92 main office just now and make a complaint to them.

Level 5, Menara Standard Chartered
P.S. 38, No. 30, Jalan Sultan Ismail
50250 Kuala Lumpur.
Telephone : (603) 2141 5775

I am extremly angry with it. What the reason they gave 3 phase to double storey and single phase only to 2.5 storey?

Type A owner, can you all please give the number above a call to complain the same matter too?

icon_question.gif icon_question.gif icon_question.gif icon_question.gif icon_question.gif


Let's give some pressure to the stupid cut cost developer! mad.gif mad.gif mad.gif mad.gif
cheon
post Aug 5 2013, 09:50 AM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(ORIZ @ Aug 5 2013, 09:13 AM)
happens bro. always get conned in this beloved country. normal la. consumer rights zero
*
I am having small family and single phase should be sufficient for me for normal days. However, what will happen for bigger family and if i wan to invite my friends for party?

I've write a formal complaint letter to them. Hope they can give all type A owner a reply soon.

rclxub.gif rclxub.gif
cheon
post Aug 5 2013, 02:32 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(AMINT @ Aug 5 2013, 12:03 PM)
I will write a letter to then. Just want to ask also since i wanna write a letter, the manhole cover, only type A gets the stupid plastic cover? The other types get the metal type?
*
Yes, i've get their guy to get back to me and he's talking noncense.

He replied : "we had raised the matter with our project department and we are being informed that type A units are designed for single phase"

Nadayu GM is out of lunch now and i've asked him to call me back later.

Guys, don't look for Kris if you call to Nadayu 92.

Look for Kris Manager or GM directly as Kris cannot make any decision.

Type A owner, please complaint to Nadayu! We spent so much on our house and they gave us single phase mad.gif mad.gif


Type A owner, let's voice it up! This is truly unfair for us!
cheon
post Aug 5 2013, 03:05 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(odsyauy @ Aug 5 2013, 02:48 PM)
strongly disagree with tat statement and developer must change it mad.gif
*
Bro, thanks so much for the support rclxms.gif

Are you a Type A owner? Can help us by making a complain to them?

Level 5, Menara Standard Chartered
P.S. 38, No. 30, Jalan Sultan Ismail
50250 Kuala Lumpur.
Telephone : (603) 2141 5775


Look for Kris Manager directly and do not look for Kris.

Thanks~ icon_rolleyes.gif
cheon
post Aug 5 2013, 03:07 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(AMINT @ Aug 5 2013, 03:05 PM)
Entah ape ape entah. Type A units are designed for single phase? I would say his brain is designed for a monkey!!
*
Bro, thanks for the support.

Can you filed a complaint to them too?

The way Kris reply to my email is unprofessional in unproper way.

We need to give some pressure to them smile.gif
cheon
post Aug 5 2013, 03:09 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(AMINT @ Aug 5 2013, 03:06 PM)
Who is Kris' manager? I dont wanna talk to a monkey.
*
Haha, i called to the number above and asked them to pass the line to Kris Manager or GM directly.

They are not in now. I still waiting for them to call me back.

This Monkey forward the email to Nizam and Edrus only. Think this monkey small patato only shakehead.gif
cheon
post Aug 5 2013, 03:21 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(odsyauy @ Aug 5 2013, 03:19 PM)
nope, mine is Type B, but not yet inspect house cos i bought from owner and now waiting for loan settlement. hope my house no major defect
*
Thanks bro..it's truely unfair for us.

My house got more than 400 minor defect. If you free to visit my house i show u~
cheon
post Aug 5 2013, 03:22 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(AMINT @ Aug 5 2013, 03:19 PM)
if small potato doesnt know what he is talking about, then just dont talk. he thinks we are all stupid ka? we are not 1st home buyers.
*
I am very frustated right now, juz now i called them again and the manager still not in.

The clerk there Anna kena me shoot too....shoot until gao gao mad.gif mad.gif mad.gif mad.gif
cheon
post Aug 5 2013, 03:29 PM

Getting Started
**
Junior Member
100 posts

Joined: Aug 2009
QUOTE(odsyauy @ Aug 5 2013, 03:23 PM)
walao... 400 minor defect then become major defect already...a bit regret to spent so much money for this so much  sweat.gif defect house
*
All minor defects such as tiles crack,hollow, water leaking, poor painting job....

3 Pages < 1 2 3 >Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0506sec    0.63    7 queries    GZIP Disabled
Time is now: 23rd December 2025 - 04:50 AM