post Jul 7 2011, 03:21 PM

la la la
******
Senior Member
1,285 posts

Joined: Sep 2009
QUOTE(keithcky @ Jul 7 2011, 03:06 PM)
Wao Joe kor hati manyak senang wor  biggrin.gif  biggrin.gif

Alex reli so 'siu hei' wor cannot joke  blink.gif
*
of coz..all bkt oug car park at lrt liao..the road will be clearer, bt with lrt dunno what will happen... :S

alex memang pun siu hei...
see la...today the end of 3 days boikot...


Added on July 7, 2011, 3:23 pm
QUOTE(surf-it @ Jul 7 2011, 03:15 PM)
It's between on the empty land between the PPR and the TNB high tension wire/Shoplot. So it's very near to the PPR kampung muhibbah, from Z residence you will have to walk 90 degree from that nathan corner road towards the PPR.
roughly knw where..
bt the map show intersect of jalan 4/155 & jalan 1/155b...
middle of no where la...
biggrin.gif


Added on July 7, 2011, 11:40 pmhttp://forum.lowyat.net/topic/559364/+1360
sudah kena complain jor...
sad.gif
i hv no words now....

This post has been edited by joeekh: Jul 7 2011, 11:40 PM
joeekh
post Jul 8 2011, 11:36 PM

la la la
******
Senior Member
1,285 posts

Joined: Sep 2009
manage to talk to sa liao...
z res alredy have approval from ikram b4 they start work...
so shud nt be an issue for them...i guess...
smmore the hill rock is 90% on rainz side of land...
hopefully nt much impact on z res la...
abang keith...can confirm ah...
joeekh
post Jul 9 2011, 12:08 AM

la la la
******
Senior Member
1,285 posts

Joined: Sep 2009
QUOTE(cutealex @ Jul 9 2011, 12:01 AM)
Welcome back Joeekh kor...
*
welcome back abang alex..

btw...i whole day is ard de...jz that damn bz with work no time layan u guys at LYN...
joeekh
post Jul 10 2011, 12:43 AM

la la la
******
Senior Member
1,285 posts

Joined: Sep 2009
QUOTE(cutealex @ Jul 9 2011, 12:30 AM)
later u going to sign SnP ZR?
*
to quote ur statement....
"i know u will going to ask this question"...
what u would like my answer to be...?


Added on July 10, 2011, 12:44 am
QUOTE(essim @ Jul 9 2011, 09:03 PM)
Do we have to inform bank first before swap, although we pay upfront?
*
no need inform bank de..
once u swipe...
bank will call u n verify if u iindeed swipe such a large amt of $$

This post has been edited by joeekh: Jul 10 2011, 12:44 AM
joeekh
post Jul 10 2011, 01:29 AM

la la la
******
Senior Member
1,285 posts

Joined: Sep 2009
QUOTE(cutealex @ Jul 10 2011, 12:47 AM)
blush.gif

the Banks has approved your credit the limit as per expected?
*
need to use 2 cards liao...
joeekh
post Jul 10 2011, 09:17 AM

la la la
******
Senior Member
1,285 posts

Joined: Sep 2009
QUOTE(cutealex @ Jul 10 2011, 01:31 AM)
Aiya.,,,Taikor...pay Cash or Cheque lah... Taikor mah...

if 2 cards = different banks.....u plan installment? pay to two banks per month? or 1 settle full and other one installment?
*
me os small fly....
no cash de...
both also installment...its the same as using single card,,,
joeekh
post Jul 10 2011, 11:03 AM

la la la
******
Senior Member
1,285 posts

Joined: Sep 2009
QUOTE(cutealex @ Jul 10 2011, 09:29 AM)
The only different is more troublesome..coz hv to pay two Bank...the bit OUG complaint settle?when Zr start do clear up and foundation?
*
apa boleh buat...
small fly canot apply gold / black card...
sa told me zr alredy got ikram approval before they start work...
so i listen lor..
yest go to the site..they alredy fenced up..so cant see anything..bt see got worker there...
joeekh
post Jul 10 2011, 08:11 PM

la la la
******
Senior Member
1,285 posts

Joined: Sep 2009
QUOTE(hbrown @ Jul 10 2011, 03:16 PM)
hi, anyone taking ocbc loan? what i learned frm my agent, though i dump in money during construction period, it wont reduce the interest i have to pay during initial  drawdowns. it will only reduce the installment interest after i start paying installment ..
i 'believe' what i took is full flexi plan la...

Joeekh bro,sorry it may sound silly, but how should i know what i took is semi or full flexi, it dint stated in the agreement; but it stated it allows me to make advance payment/redrawable prepayments any time


Added on July 10, 2011, 3:25 pm

oo. we will be given 1 account number only right. then do we have to inform bank the money we paid is to just 'put in' as advance payment or as payment which i cant redraw later?
*
ocbc as i knw only have semi flexi...thzt is wat i get when i ask banker last time..
full flexi will ask u pay maintenance fee of rm10/month (some bank can waive) and allow u to withdraw $$ from current acct anytime..
semi flexi also allow u to withdraw $$ from current acct..but there will be rm50 charges for each transaction...
and each withdrawal must be a multipler or rm1k (some bank different)...
full n semi flexi also got 2 accts...loan n current
we dump $$ into current which will tranfer to loan acct at certain date..
some bank would require u to inform them if the xtra $$ u put in is to offset the interest (which can withdraw later) or directly pay into principal (cant withdraw)..
best u check carefully with ur banker on the loan u take n the arrangement...
joeekh
post Jul 10 2011, 10:31 PM

la la la
******
Senior Member
1,285 posts

Joined: Sep 2009
QUOTE(jbutton @ Jul 10 2011, 09:37 PM)
They dont have the report, if they have Bukit OUG resident cannot go all the way to the press again. The z developer had another round of discussion with the Bkt OUG resident last Friday.
*
we will jz hv to see what would be the latest development...
shud nt be too long..gua i think...

joeekh
post Jul 12 2011, 10:58 AM

la la la
******
Senior Member
1,285 posts

Joined: Sep 2009
QUOTE(surf-it @ Jul 12 2011, 10:52 AM)
http://www.starproperty.my/PropertyScene/T...htBox/13235/0/0

Hill project faces strong objections from Bukit OUG residents

BUKIT OUG Condominium residents are demanding nearby project developer Trinity Group to furnish the Ikram report on the project and stop levelling the hill.

They are worried that three residential and commercial projects behind their condominium blocks will have an impact on the soil stability.

The residents led by their Residents Association vice-chairman Charles Ho and Joint Management Body chairman Adrian Young also wanted some answers from Kuala Lumpur City Hall (DBKL).

The meeting on Friday between the residents and Trinity Group was arranged by Seputeh MP Teresa Kok’s assistant Peter Seen.

Halfway through the discussion, moderated by Subang Jaya municipal councillor Tan Jo Hann, the residents got angry with the developer for withholding information pertaining to the project taking shape behind their condominium blocks.

Throughout the meeting, Trinity Group representatives, headed by Z Residence project manager O.G. Can, remained calm and tried to explain the details of the project while fanning off angry remarks hurled at them.

The meeting came to a boil when consulting engineer for the developer, who only wished to be known as Looi, threatened to walk out after residents harangued him during his presentation.

Fortunately Seen, managed to bring the situation under control.

However, Can assured them that the levelling of the 20m-high hill was done in stages.

“I assure you that we are not building anything on the hill now but merely bringing it down to 10m,” he said,

He also said they were prepared to build a hoarding to prevent any rock fall.

Both parties also agreed to meet the DBKL planning unit to sort out some issues and allow the residents to have a copy of the Ikram report if DBKL had no objections.
*
a compromise between both party will only bring goodness to the whole area..
biggrin.gif
joeekh
post Jul 12 2011, 04:05 PM

la la la
******
Senior Member
1,285 posts

Joined: Sep 2009
QUOTE(surf-it @ Jul 12 2011, 01:37 PM)
actually those bukit oug resident are indirectly helping Z buyer also lar, bcz any landslide happen in that area will affect the WHOLE area value, just look at bukit antarabangsa and the vicinity, nobody dare to touch it.
*
yeap..
best to create a win-win situation...
biggrin.gif
joeekh
post Jul 12 2011, 05:25 PM

la la la
******
Senior Member
1,285 posts

Joined: Sep 2009
QUOTE(greeny88 @ Jul 12 2011, 05:18 PM)
Guys, anyone buy on One South project? Quite near to Z-Residence and much more cheaper....the facilities are more as well. Now I realized Z-Residence dun provide much sports facilities...
*
actually..one south nt too near..drive also need 10 minutes like that..
smmore one south is service residence..
and they got new project call gardenz going to launch soon..
joeekh
post Jul 12 2011, 05:28 PM

la la la
******
Senior Member
1,285 posts

Joined: Sep 2009
QUOTE(JustNobody @ Jul 12 2011, 05:25 PM)
One South at Serdang? It's in Serdang, leasehold, and under commercial land, am I right? .....
*
its in serdang..
freehold under commercial land..
that y it is service residence..
joeekh
post Jul 12 2011, 06:29 PM

la la la
******
Senior Member
1,285 posts

Joined: Sep 2009
QUOTE(surf-it @ Jul 12 2011, 06:17 PM)
Cheaper than Z? I don't think so, it's priced at 380psf.

But to be honest, looking at their facilities list make me drool...

Level 1

CCTV control room
Drop off point with wide Terrace
Planting & seating
Water features & landscape features
Visitor lift
Hair saloon
Mini market
Laundrette
Management office
Grand foyer
Table tennis
2 squash courts
Full basketball court
Resident bar with WiFi at floating timber deck
Prayer room male & female
Water fall features
Art garden – sculpture avenue, topiary garden, graphical / reflexology garden
Wood garden – zen point
Water garden – water Lily sanctuary, granite spring
Level 2

Infinity lap pool 42’ x 117’
Water fall from pool to floating deck
Jacuzzi
Huge pool Deck
Timber deck with planting
Sauna / steam male & female
Changing room & bathroom male & female
Gymnasium
Timber deck at gymnasium
Floating indoor 2 badminton Court
Jogging track
Open cafeteria
Covered walkway from lift to pool & cafeteria
Snooker room
Concourse area
Link bridge to enjoy more facilities at Parc@One South
Disable toilet
Sun garden – golden triangle, yellow garden
Water garden – granite Spring
Eco garden – bamboo walk, butterfly sanctuary, hedge garden, maze enclave
Wood garden – spice orchard, herbal cove
*
hahaha..
as compare to z res, there is not too much hanky panky facilities..
maybe that y maintenance fee is at rm0.18 (inclusive sinking fund)...
smtime too much of facilities contribute to higher maintenance fees..
and u need to make sure all the facilities wont turn in white elephant..

joeekh
post Jul 13 2011, 10:03 AM

la la la
******
Senior Member
1,285 posts

Joined: Sep 2009
QUOTE(greeny88 @ Jul 13 2011, 09:49 AM)
It is confirmed that 0.18psf (included sinking fund)?
*
that what the lawyer told me when sign s&p.
although nt yet finalize..
but max for z res is rm0.20...
joeekh
post Jul 13 2011, 01:48 PM

la la la
******
Senior Member
1,285 posts

Joined: Sep 2009
QUOTE(Garmin_GPS @ Jul 13 2011, 01:37 PM)
bro can PM me share about that area?

thankss in adv biggrin.gif
*
no need pm la..
jz shared out to all ppl here..
biggrin.gif
joeekh
post Jul 13 2011, 02:34 PM

la la la
******
Senior Member
1,285 posts

Joined: Sep 2009
QUOTE(22222222 @ Jul 13 2011, 02:26 PM)
hiii, bro joe oledi sign lah....downpayment oledi dump in to the fish pond......no way back....骑虎难下。 biggrin.gif
*
dei..
no need say me like that de...
joeekh
post Jul 14 2011, 07:35 PM

la la la
******
Senior Member
1,285 posts

Joined: Sep 2009
QUOTE(greeny88 @ Jul 14 2011, 07:17 PM)
There is no place is special before someone come over and develop them.....even KL were a piece of woodlands back then.
All the existing tenants of course will object the development, like myself in Bukit Gasing case as well...this is very common who lives in Malaysia.

Concern or not....just wait Trinity to handle that.

But if really stop construction, what can buyers do???? Will we get the refund or what????

cry.gif  cry.gif
*
i hv sms kevin n ask..
let see what he reply back to me tmrw...
joeekh
post Jul 14 2011, 11:30 PM

la la la
******
Senior Member
1,285 posts

Joined: Sep 2009
QUOTE(cutealex @ Jul 14 2011, 10:28 PM)
I Agreed on below. but this is only 30%...there's still lot of reasons make me pull out from this project..

anyway i believe the Developer able to resolve this issue... just time matter....
*
well..
u have ur own thinking..
then i also have my own thinking...
biggrin.gif
joeekh
post Jul 14 2011, 11:42 PM

la la la
******
Senior Member
1,285 posts

Joined: Sep 2009
QUOTE(cutealex @ Jul 14 2011, 11:34 PM)
no worry.... ada Jooekh kor backup... no problem one... thumbup.gif
*
deng..
wei..since u so free, help me calculate the early settlement thing..
tongue.gif

16 Pages « < 12 13 14 15 16 >Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0525sec    0.30    7 queries    GZIP Disabled
Time is now: 18th December 2025 - 01:50 AM