I think, I will wait for my DMC before I take further action.
This post has been edited by limfgn: Nov 25 2013, 07:12 AM
emerald west, rawang
emerald west, rawang
|
|
Nov 25 2013, 07:07 AM
Return to original view | Post
#121
|
![]() ![]()
Junior Member
242 posts Joined: Sep 2008 |
I think, I will wait for my DMC before I take further action.
This post has been edited by limfgn: Nov 25 2013, 07:12 AM |
|
|
|
|
|
Nov 25 2013, 10:35 AM
Return to original view | Post
#122
|
![]() ![]()
Junior Member
242 posts Joined: Sep 2008 |
Anyone know whether Corris ready for VP?
This post has been edited by limfgn: Nov 25 2013, 10:36 AM |
|
|
Nov 26 2013, 09:19 AM
Return to original view | Post
#123
|
![]() ![]()
Junior Member
242 posts Joined: Sep 2008 |
QUOTE(harjgill @ Nov 24 2013, 08:57 PM) Have you moved in Lim? I've recently bought a Coral unit for own stay, hoping to move in early nx year. How do we contact the other owners and start a RA? The increase to RM100 is disappointing. The developer taking us for a ride. Residence of Amethyst 3 are also paying RM70 at the moment. Hi harjgill, I have check with some RA in USJ and bangsar they are currently paying around RM5.50/hr and RM8.50/hr. So if Amethyst 3 is paying RM70, we exclude the possibility of lanscaping maintenance cost included as part of the RM70, assume that there are 2 guard on duty at one time, they are paying around RM5.90/hr excld gst.Besides, I am in the opinion that Coris should share the cost of the security, since Coris owner not taken VP, it should be the Contractor that is sharing. As for forming a RA, was inform by guocoland that they have plan to assist us early next year, I think we may have to wait until Coris take VP as both are in compound. |
|
|
Nov 26 2013, 02:19 PM
Return to original view | Post
#124
|
![]() ![]()
Junior Member
242 posts Joined: Sep 2008 |
Dear coral owners, I have just receive an email from Guocoland regarding the rates for security guards. This may apply to all the others phases of project in Emerald too.
the email says: "With regards to your email on the security charges should share with the Contractor, I cannot comment on this. All these issues were already arranged and in operation before I was on board. On short listing and negotiation process of the Security provider, the GLM Management has appointed Guardian Security Services for all the Rawang Emerald East and West projects. On the security rate, it all depend on the security services company." |
|
|
Mar 18 2014, 05:47 PM
Return to original view | Post
#125
|
![]() ![]()
Junior Member
242 posts Joined: Sep 2008 |
QUOTE(TheOwl @ Mar 18 2014, 04:53 PM) I'm not an owner of EG but my property is also in EW. It was stated in my construction (we have 2 s&p bcs we bought the bungalow lots and had the houses built a year later) S&P that the master bedroom would use cultured marble counter-top but it looked so cheap I had it changed. I am no legal expert nor have any experience making long due LD claim, but if i have not mistaken the effective legal date to make such contract claim should be within 6years after that any argument should be quite difficult.I thought our LAD was only 8% but recently I checked my construction S&P and found that it was 10%. I could not find my copy of the letters asking us to take possession of the house (VP)/collect the keys and to collect the cheque for the LAD so I've contacted them to send me a copy of both letters. I want to check if the amount is correct bcs I feel they have short-paid me. It has been 10 years since I received my LAD but if I find they have paid me short I would claim for the balance. According to the S&P they should pay from day to day so if your S&P is on May16 2011 they should hand the keys to you on 15May 2013 but if they hand to you on 1Dec 2013 then they should pay you compensation from 16May-30Nov 2013. If your purchase price is RM1m the LAD is a lot but then the interest you pay the bank for the delayed period is oso a lot. |
|
|
Mar 18 2014, 05:53 PM
Return to original view | Post
#126
|
![]() ![]()
Junior Member
242 posts Joined: Sep 2008 |
QUOTE(arza mus @ Mar 18 2014, 02:06 PM) Dear Emerald Gardens Purchasers, You sure its bare concrete finish, may be yo should check with them if its bare concrete or Concrete imprint. Other emerald project like Amberly, Cassis and Coral have concrete imprint in their carporch.Besides the exposed water tank issue, I further noticed that the developer has given substandard materials in comparison with the constructed show unit (no doubt whatever in the SPA prevails, but I am of the opinion the developer should not portray superior materials (i.e. tinted glass with powder coated alum frame window and tiled car porch) in the show unit just to give false impression and hope to the purchasers. Also, after reviewing the SPA, I further noticed, 1. Only 1 or 2 fan points provided dependent upon the unit purchased. It is noted that air-cond point will be provided but living in tropical country the preference is still ceiling fan to conserve use of electricity in line with the current GREEN BUILDING trend. After all, the development is called GARDENS which should be synonymous with GREEN and therefore shouldn’t the GREEN concept be reflected in the unit? 2. The car porch will be in concrete finish. Does not seem right here for the price that we are paying! I was made known by the developer that the guard house will be built at later stage upon Vacant Possession. Have any of you seen the design? Have we got any say on this so that they will not build something that looks cheap? Those interested parties may want to take up the matters further to the developer. |
|
|
|
|
|
Mar 18 2014, 05:55 PM
Return to original view | Post
#127
|
![]() ![]()
Junior Member
242 posts Joined: Sep 2008 |
deleted
This post has been edited by limfgn: Mar 18 2014, 05:55 PM |
|
|
Mar 24 2014, 09:36 AM
Return to original view | Post
#128
|
![]() ![]()
Junior Member
242 posts Joined: Sep 2008 |
QUOTE(Divana @ Mar 22 2014, 01:35 AM) DA Land signs MoU with Sanderson Group for The TWO's Theme Park Well, thats a suprise.![]() The TWO one million sq ft indoor and outdoor theme park will be conceptualised, designed and managed by Sanderson Group, an Australian design and construction firm. http://www.theedgemalaysia.com/property/28...theme-park.html http://www.propertyguru.com.my/property-ne...0mil-theme-park |
|
|
May 28 2014, 01:26 PM
Return to original view | Post
#129
|
![]() ![]()
Junior Member
242 posts Joined: Sep 2008 |
QUOTE(j33law @ May 17 2014, 04:07 PM) Grey areas in the specifications in S&P, a number of them, and some commense sense items such as a water meter blocking part of the way to one of the small gates, and the list go on. Appreciate anyone can tell the success rate through tribunal. Any RISE bungalows buyers or potential buyers please be noted, you may not be spared from the issues when it comes to your turn. I am not so sure how you do it through tribunal, but even with grey area, a contract will be judge base on reasonableness, grey area work 2 ways, with some one who is literate in contract and can correctly read the contract, you can probably win the fight without much hassle. An example would be the meter blocking small gate, a point to argue would be authority like bomba will not allowed obstruction at the point of egress.Good luck. |
|
|
Aug 25 2014, 06:00 PM
Return to original view | Post
#130
|
![]() ![]()
Junior Member
242 posts Joined: Sep 2008 |
QUOTE(moonmoon1985 @ Aug 25 2014, 05:31 PM) by the way the 3rd schedule of standard SPA goes like this: He can fight and insist against the developer, no harm trying but however if he is determine to win the argument, then he must be aware that the clause says "ready for connection", but has nvr said that there should electrical and water flow in the premise. This mean that developer is only obliged to have all fittings install & tested and supply available for tapping into his premise.so unless the utility supply is connected, please insist the duration of LAD is properly observed by Guocoland. now if you managed to get extra from Guocoland please buy me a ice latte from Mc Cafe @ Kota Emerald. Just my two cent. This post has been edited by limfgn: Aug 25 2014, 06:06 PM |