Renovations 3-phase wiring

views
     
SUSsupersound
post Sep 7 2014, 06:18 PM

10k Club
********
Senior Member
11,554 posts

Joined: Aug 2009
QUOTE(weikee @ Sep 7 2014, 05:30 PM)
Electric stove can pull up to 15amps some 20amps. Instant Water heater if switch to max (rainy) can go up to 13amps constant up to 15mins some people take 30mins bath will draw 30mins of 13amps
*
Max or typical? There are difference on them.
As if they are pulling max all the time, I'm sure the wire won't last long.
SUSsupersound
post Sep 14 2014, 05:30 PM

10k Club
********
Senior Member
11,554 posts

Joined: Aug 2009
QUOTE(weikee @ Sep 7 2014, 06:30 PM)
Wires will last if use correct rating.

For stove depend how many burner used. Water heater depend weather. If using water kettle is also around 10amps.
*
Missed out this.
Well, your "guide" are too general. Will Pensonic's 2000W will consume same power as Panasonic? It won't as the actual current draw will vary on the component used. Not to mention the efficiency on it.
SUSsupersound
post Sep 14 2014, 05:33 PM

10k Club
********
Senior Member
11,554 posts

Joined: Aug 2009
QUOTE(iXora.ix @ Sep 14 2014, 04:52 PM)
Hey guys. Wanna ask a simple question.

I would like to upgrade to 3 phase to cater electric demand on my house.
I saw at outside (near my tnb meter) there's currently 4 wire crossing my house ( tnb pole>neighbor>my house>neighbor).

Did the current crossing wire are 3 phase ready?
As I saw my neighbor across street, they using 3 phase and using the existing crossing cable that I mention.
*
How many wire to your main meter? 2 or 4?
2 means single phase, 4 means 3 phase.
Your row got about 10 houses right?
Each phase(the cable you mentioned) will feed to 3 houses average.
If you were to upgrade, TNB will tap another 2 cables to your new meter.
SUSsupersound
post Sep 14 2014, 05:47 PM

10k Club
********
Senior Member
11,554 posts

Joined: Aug 2009
QUOTE(iXora.ix @ Sep 14 2014, 05:38 PM)
There's 2 wire.
yes, around 10 houses.

I show a picture for clear view

[attachmentid=4133475]
meter

[attachmentid=4133476]
The 4 cable I mention
*
It is single phase only. Want to upgrade? Not easy unless you are prepared for a dirty house.

QUOTE(weikee @ Sep 14 2014, 05:43 PM)
Check the product spec.
*
whistling.gif whistling.gif whistling.gif
SUSsupersound
post Sep 14 2014, 06:01 PM

10k Club
********
Senior Member
11,554 posts

Joined: Aug 2009
QUOTE(iXora.ix @ Sep 14 2014, 05:50 PM)
I see. Now I know  sweat.gif  . Reason? will installing additional aircon. right now got now. and less than 2 year, got another 2 aircon to be installed sweat.gif

It is require to change all cable inside house? I know that 3 phase got 4 wire instead of 3
*
A single main cable can withstand 40A.
You are not using the air cond 7/24 and set at 18°C, right?
And will you be turning all of them on most of the time?
As if you are planning for 3-phase, have to rewire again, and it will be very messy.
SUSsupersound
post Sep 14 2014, 06:03 PM

10k Club
********
Senior Member
11,554 posts

Joined: Aug 2009
QUOTE(iXora.ix @ Sep 14 2014, 05:55 PM)
I think I need to tap from tnb pole.
And no, my house were build on 1995 something hehe tongue.gif
*
19 years already, guess you better plan for a renovation work. Then no need to be that messy.
The existing wires also almost time.
SUSsupersound
post Sep 14 2014, 06:44 PM

10k Club
********
Senior Member
11,554 posts

Joined: Aug 2009
QUOTE(iXora.ix @ Sep 14 2014, 06:40 PM)
Haha. My house will perform 3rd renovation within 2 years as I add another room on the house. That's why I need to do a homework before upgrading  biggrin.gif
Yep. This part actually a bit hassle for me. I dont know my current load my of of the time ;

6 PC 24/7, 3 led tv, 2 refrigerator,2 aircon. with additional 2 aircon , 1 more fridge and 1 WH after renovation done
*
The wiring plan are simple if you are upgrading to 3 phase :
air conds, water heater, oven sure direct tap from MCB, independent(must check once the wiring done)
Lights can use back the existing wiring
If it is double storey house, make sure at least 1 phase supply to 1st floor.
SUSsupersound
post Sep 14 2014, 08:30 PM

10k Club
********
Senior Member
11,554 posts

Joined: Aug 2009
QUOTE(iXora.ix @ Sep 14 2014, 06:58 PM)
Orait. Yes my house are double storey. There are 2 aircon upstair right now. In future there's 3 aircon upstair, 1 more down stair with WH, fridge and oven.

Are the estimate rmcost is  > 3K and <5K involve? sweat.gif
*
application till the meter cost rm3+++, not including wiring work. So can come out to about rm6000.
SUSsupersound
post Sep 14 2014, 09:38 PM

10k Club
********
Senior Member
11,554 posts

Joined: Aug 2009
QUOTE(bengang13 @ Sep 14 2014, 09:35 PM)
when I called up the list of consultant provided by tnb it ranges from 2k-5k. I pick the most reasonable one

1) Runners fee :RM450
2) TNB connection: RM1,250 or RM1,350
3) Deposit

of coz the tnb tiang is right infront of my house.
*
Nope, they won't connect the cable from the tiang, it will cost more.
They will just tap from the nearest point.
So :
1. no comment, you can safe it if you DIY, but more hassle
2. about there, as said, depending on the cable being tapped, if bangalow, it will be more
3. should be about rm800-1500
SUSsupersound
post Sep 14 2014, 09:50 PM

10k Club
********
Senior Member
11,554 posts

Joined: Aug 2009
QUOTE(bengang13 @ Sep 14 2014, 09:44 PM)
1. I went to tnb they say need runner. can't go direct...I also  doh.gif

the nearest point is the tiang lor.. coz I am the corner lot. my whole row is single phase. the one opposite from my house is 3 phase but that would mean hacking the road which I don't think they would be keen. after visiting my house the runner say they will most likely tap from the tiang wor..
*
1. this sheet still happens.
Corner lot then? It still have 4 cables going, unless yours are semi-D, hahaha.
That's why they only charge you rm1250,i f really taking from the tiang, it will be more doh.gif
SUSsupersound
post Sep 16 2014, 02:41 PM

10k Club
********
Senior Member
11,554 posts

Joined: Aug 2009
QUOTE(bengang13 @ Sep 14 2014, 09:59 PM)
Mine semi d single storey. So if running from tiang how much? I reckon from bottom of tiang to my meter around 5m
*
The price the runner will let you know.
Best is get your appointed wireman that have contact to the runner.
SUSsupersound
post Sep 16 2014, 02:45 PM

10k Club
********
Senior Member
11,554 posts

Joined: Aug 2009
QUOTE(ozak @ Sep 15 2014, 09:29 PM)
25mm amour cable running underground doesn't cut cost. That cost a lot.  sweat.gif
*
If using single phase, got 30mm also I'll get it.
If using 3 phase(provided wiring done right with proper load balancing), then 16mm also will be enough.
Some wireman will still use a single phase even we got a 3 phase supply.
The only advantage on 3 phase wiring is load balancing, so the wires won't be subjected to handle high loads.
SUSsupersound
post Sep 16 2014, 03:06 PM

10k Club
********
Senior Member
11,554 posts

Joined: Aug 2009
QUOTE(bengang13 @ Sep 16 2014, 12:50 AM)
understand what you are doing. but i am also installing the  TNB sellback thingy. the seda thing. so i am not sure if it will affect the installation. any idea?
*
Getting Seda? Want to sell back to TNB?
What is the goal you want? If invest to gain money, then you may think again.
I have 2 friends installed this, 1 installed long time ago and his ROI are 7%, another is lower at 3-4%
The rate is getting lower and lower now. So for cooling your house, then go ahead, if trying to make money from it, sorry, wrong tools.
After installing this solar panels(on the right direction to harvest sunlight), you will have a cooler house, your air cond cost also can come down.
SUSsupersound
post Sep 17 2014, 01:32 PM

10k Club
********
Senior Member
11,554 posts

Joined: Aug 2009
QUOTE(bengang13 @ Sep 17 2014, 08:43 AM)
why the difference? not enough sunlight? well when i went to it was told coould generate RM600-Rm750 per month so i went in. heard also payment from TNB not regular. anyway the cooling part is an extra for me...
*
On a 4KW system or higher rated?
The rate are dropping every year.
SUSsupersound
post Sep 17 2014, 05:53 PM

10k Club
********
Senior Member
11,554 posts

Joined: Aug 2009
QUOTE(bengang13 @ Sep 17 2014, 04:03 PM)
4kw. yeah rates are dropping with each opening. i got the latest one... RM1.2837/kWh
*
Now still can get rm600-700? That's the 5-6 years back price sweat.gif
Better check it properly. Still as said before, cooling down your house will bring down your electric bill also.
SUSsupersound
post Sep 20 2014, 01:02 PM

10k Club
********
Senior Member
11,554 posts

Joined: Aug 2009
QUOTE(enriquelee @ Sep 20 2014, 11:04 AM)
Due to sunlight being absorb by the solar panel?
*
Yes, that's right. Or can say you got additional layer of roof.
SUSsupersound
post Sep 21 2014, 11:15 AM

10k Club
********
Senior Member
11,554 posts

Joined: Aug 2009
QUOTE(enriquelee @ Sep 21 2014, 12:24 AM)
I see. Interesting fact.
*
So we need to weight the solar panel installation, what do we want in the end.
Still, why we need to have quota for this? In Malaysia, we are blessed with sunlight > 180 days. Even in the rainy days, we are still getting some sunlight.
Like European countries, they are ditching fired power generation and encouraging people to use green power to generate power.
SUSsupersound
post Sep 21 2014, 05:49 PM

10k Club
********
Senior Member
11,554 posts

Joined: Aug 2009
QUOTE(enriquelee @ Sep 21 2014, 05:00 PM)
So little? That is slightly more than half a year only wor.
*
Is just an estimated figure only.
SUSsupersound
post Sep 22 2014, 11:13 AM

10k Club
********
Senior Member
11,554 posts

Joined: Aug 2009
QUOTE(enriquelee @ Sep 21 2014, 10:18 PM)
I see. Okok
But I think can easily get over 300 days a year la
*
365/6 days have sunlight, but what I mean is the quality of "hot" sunlight.
And the panel direction also comes into play.
SUSsupersound
post Sep 22 2014, 01:49 PM

10k Club
********
Senior Member
11,554 posts

Joined: Aug 2009
QUOTE(enriquelee @ Sep 22 2014, 01:27 PM)
you means 52 x 6 days a week.
Yaya, rain, mist and humidity all affect the out come.
*
That's why don't think it can give you 100% sweat.gif
If you think like this, you will be sad when you see the return sweat.gif