When Malaysia big hoo haa about Data Center; in reality lack of skilled talents.
so if youre major in HVAC or Electrical Engineering. you win.
Malaysia lands, Embarrassment.
|
|
Jun 6 2025, 01:16 PM, updated 7 months ago
Show posts by this member only | Post
#1
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,072 posts Joined: Jun 2018 |
When Malaysia big hoo haa about Data Center; in reality lack of skilled talents. so if youre major in HVAC or Electrical Engineering. you win. laparwolf liked this post
|
|
|
|
|
|
Jun 6 2025, 01:40 PM
Show posts by this member only | Post
#2
|
![]()
Junior Member
1 posts Joined: Dec 2021 |
Thought some say only need security guards for data centers, no real talent needed.
|
|
|
Jun 6 2025, 01:51 PM
Show posts by this member only | Post
#3
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,072 posts Joined: Jun 2018 |
|
|
|
Jun 6 2025, 02:26 PM
Show posts by this member only | Post
#4
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,560 posts Joined: Sep 2005 From: Shenzhen Bahru |
Those high value job in operating data centre can be managed remotely, so these workers WFH in their respective countries
|
|
|
Jun 6 2025, 02:28 PM
Show posts by this member only | Post
#5
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,072 posts Joined: Jun 2018 |
|
|
|
Jun 6 2025, 02:40 PM
Show posts by this member only | Post
#6
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,560 posts Joined: Sep 2005 From: Shenzhen Bahru |
QUOTE(Syie9^_^ @ Jun 6 2025, 02:28 PM) Who say M'sia cannot supply power and water? There's enough supply, gomen can easily get IPP to generate more electricity, albeit not green. The problem that I see is the execution is slow, so construction maybe delayed, those kind of problem... andrewhtf, SYAMiLLiON, and 1 other liked this post
|
|
|
|
|
|
Jun 6 2025, 02:40 PM
Show posts by this member only | Post
#7
|
![]() ![]()
Junior Member
250 posts Joined: Aug 2024 |
QUOTE(Syie9^_^ @ Jun 6 2025, 02:28 PM) you got watch video or not?it's distribution. investor come in, expect data center only. local authorities are expected to give TNB substation for free. Which for big development, is unspoken requirement for you like resurfacing the roads around your site. However, this usually means 33kV or 11kV substations only. Those are typically close to end user location. Your problem is with 110kV substations which usually servers entire industrial parks. Building those take time. C&S is 1 year + if you quick, but you also gotta wait 2 years for the transformers to be built and commissioned. Land is cheap where these facilities don't exist. Where these facilities exist, land is not cheap. This is partially why there has been such a huge push for Solar for industrial players lately to shed TNB load in order for TNB to supply to data center instead. Water infra also an issue for the same reason. Problem is clean water for cooling tower HVAC systems used by datacenters. |
|
|
Jun 6 2025, 02:43 PM
Show posts by this member only | Post
#8
|
![]() ![]() ![]() ![]()
Junior Member
551 posts Joined: May 2013 |
Funny.
Did nothing and was condemned as Do Nothing. Did something and was said "big hoo haa but lacking...." |
|
|
Jun 6 2025, 02:43 PM
Show posts by this member only | Post
#9
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,827 posts Joined: Jan 2003 From: Selayang, Selangor |
|
|
|
Jun 6 2025, 02:55 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,596 posts Joined: Sep 2021 |
QUOTE(Porkycorgi5588 @ Jun 6 2025, 02:40 PM) you got watch video or not? Rare to see someone from the industry willing to spill the beans.it's distribution. investor come in, expect data center only. local authorities are expected to give TNB substation for free. Which for big development, is unspoken requirement for you like resurfacing the roads around your site. However, this usually means 33kV or 11kV substations only. Those are typically close to end user location. Your problem is with 110kV substations which usually servers entire industrial parks. Building those take time. C&S is 1 year + if you quick, but you also gotta wait 2 years for the transformers to be built and commissioned. Land is cheap where these facilities don't exist. Where these facilities exist, land is not cheap. This is partially why there has been such a huge push for Solar for industrial players lately to shed TNB load in order for TNB to supply to data center instead. Water infra also an issue for the same reason. Problem is clean water for cooling tower HVAC systems used by datacenters. andrewhtf liked this post
|
|
|
Jun 6 2025, 02:57 PM
Show posts by this member only | IPv6 | Post
#11
|
![]() ![]()
Junior Member
112 posts Joined: Jun 2019 |
all these DC wants is someone who can work 24hours.
can go inside DC within 30minutes of ticket. just to push the reset or power button. |
|
|
Jun 6 2025, 03:14 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,072 posts Joined: Jun 2018 |
QUOTE(knwong @ Jun 6 2025, 04:10 PM) Who say M'sia cannot supply power and water? There's enough supply, gomen can easily get IPP to generate more electricity, albeit not green. execution slow then how? bring katana? The problem that I see is the execution is slow, so construction maybe delayed, those kind of problem... QUOTE(Porkycorgi5588 @ Jun 6 2025, 04:10 PM) you got watch video or not? more beans please corgi. it's distribution. investor come in, expect data center only. local authorities are expected to give TNB substation for free. Which for big development, is unspoken requirement for you like resurfacing the roads around your site. However, this usually means 33kV or 11kV substations only. Those are typically close to end user location. Your problem is with 110kV substations which usually servers entire industrial parks. Building those take time. C&S is 1 year + if you quick, but you also gotta wait 2 years for the transformers to be built and commissioned. Land is cheap where these facilities don't exist. Where these facilities exist, land is not cheap. This is partially why there has been such a huge push for Solar for industrial players lately to shed TNB load in order for TNB to supply to data center instead. Water infra also an issue for the same reason. Problem is clean water for cooling tower HVAC systems used by datacenters. QUOTE(nihility @ Jun 6 2025, 04:25 PM) more beans please. |
|
|
Jun 6 2025, 03:26 PM
|
![]() ![]()
Junior Member
250 posts Joined: Aug 2024 |
QUOTE(RViN @ Jun 6 2025, 02:43 PM) normal.piling rig only need 2 guys. 1 operator, 1 welder. RC construction also typically 12 man team only to built 60m x 20m plot of RC slab. Then, steel structure different group of 12 man team with crane and boomlift. Your team can be a whole village or can be lean and mean. Depends on how you plan only. Also, if concrete baru keras, opening formwork etc just 2 sohai with crowbar only. plus, have to understand, he is not at site daily. perhaps got invite to visit during off-peak time. rtk73 liked this post
|
|
|
|
|
|
Jun 6 2025, 03:39 PM
Show posts by this member only | IPv6 | Post
#14
|
![]() ![]() ![]() ![]() ![]()
Junior Member
844 posts Joined: Sep 2011 |
So the issue is taking too long to build becos of red tape?
|
|
|
Jun 6 2025, 03:49 PM
Show posts by this member only | IPv6 | Post
#15
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
7,106 posts Joined: Jan 2003 |
QUOTE(pobox @ Jun 6 2025, 02:43 PM) Funny. Build condo salah. Build mall salah. build DC salah.Did nothing and was condemned as Do Nothing. Did something and was said "big hoo haa but lacking...." Keep for forest and greenery, get kecam why no development. |
|
|
Jun 6 2025, 03:49 PM
|
![]() ![]()
Junior Member
275 posts Joined: Oct 2009 |
SeSohai amdk demand this demand that..wait till they go to thailand sort out their messy electrical cable hanging every where..
This post has been edited by wcnew: Jun 6 2025, 03:49 PM |
|
|
Jun 6 2025, 04:30 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,072 posts Joined: Jun 2018 |
|
|
|
Jun 6 2025, 04:31 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,072 posts Joined: Jun 2018 |
|
|
|
Jun 6 2025, 04:32 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,072 posts Joined: Jun 2018 |
QUOTE(Porkycorgi5588 @ Jun 6 2025, 04:56 PM) normal. which DC you are in smarty corgi? piling rig only need 2 guys. 1 operator, 1 welder. RC construction also typically 12 man team only to built 60m x 20m plot of RC slab. Then, steel structure different group of 12 man team with crane and boomlift. Your team can be a whole village or can be lean and mean. Depends on how you plan only. Also, if concrete baru keras, opening formwork etc just 2 sohai with crowbar only. plus, have to understand, he is not at site daily. perhaps got invite to visit during off-peak time. |
|
|
Jun 6 2025, 04:41 PM
Show posts by this member only | IPv6 | Post
#20
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
7,106 posts Joined: Jan 2003 |
|
| Change to: | 0.0202sec
0.34
5 queries
GZIP Disabled
Time is now: 14th December 2025 - 06:25 PM |